| FA485522B0001, B190, Repair Doors, Sprinklers, Tile Briefing Rm COR Nomination | ||||
| Item | Date | Question | Gov't Response | |
| 1 | 28-Mar-22 | Removal of hard ceiling (S128, S128A): | The existing fixture are of a surface mount type and will not work for a grid ceiling. What type of fixtures are to be supplied? LED flat panel or T8, 2’X4’ or 2’X2’ troffer, 30k or 40k/ or 50k if LED, dimmable? | LED 2'x4' |
| 2 | 28-Mar-22 | S115A room enlargement: Do the light fixtures need to match the new fixtures in (S128, S128A) or match existing fixture? | Match existing fixture | |
| 3 | 28-Mar-22 | Existing PDS (S128, S128A): The existing PDS is piped on the existing ceiling (to be removed and replaced with a grid ceiling). Will new PDS need to be installed or install hangers to remount the existing pipe? PDS will not be available in this area during construction. | Install hangers to remount the existing pipe. Protect PDS system in place so it can remain operational. | |
| 4 | 8-Apr-22 | On VCT hallways will you give access to the entire hallway to demo and install VCT. Or will we need to demo and install in sections? This will include all hallways. | Reference Atch 1 SOW - CZQZ160061 6 April 22 (Amend 1) paragragh 1.5.3. Contractors will propose a phasing plan for work | |
| 5 | 8-Apr-22 | On the office wall that is mobile, do we need to move walls to remove VCT that is under it or are we demoing up to wall then tile new VCT up against the old VCT that is still under the wall? | yes, included in the most recent SOW. | |
| 6 | 8-Apr-22 | What is the voltage of the existing panel that is to be used for electromagneticdoor power, and where is it located? | The electromagnetic will tie to Fire Alarm panel, and it is in room 140. The panel is 120V | |
| 7 | 8-Apr-22 | Are the existing fluorescent lights in the conference room 2 lamp, 3 lamp or 4 lamp fixtures? | 4 lamp fixture, however the contractor (after award) is to field verify and submit official AF3000 submittals for Govt. review, prior to purchasing any materials | |
| 8 | 8-Apr-22 | Can we email our submission documents instead of placing them on a cd? | No, offer must be sealed until public opening |