Site Visit Questions B190 Updated 13 Apr 22.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
B190, Rpr Doors, Sprinklers, VCT, Carpet, New Briefing Rm
Solicitation number
FA485522B0002
Issued by

View the file

Other files

File Type Posted
SF 1409 Abstract 20 Apr 22.pdf PDF
Amendment 2 - FA485522B00020002 SF 30.pdf PDF
Atch 1 SOW - CZQZ160061 6 April 22 (Amend 1).pdf PDF
A. B190 35% Revised Drawings (Amend 1).pdf PDF
Amendment 1 - FA485522B00020001.pdf PDF
Site Visit Questions B190 28 Mar 22 (Amend 1).xlsx XLSX spreadsheet
B190 Site Visit Sign In 25 Mar 22 (Amend 1).pdf PDF
Solicitation - FA485522B0002-17 Mar 22.pdf PDF
C. CZQZ160061 Draft DD 1354.pdf PDF
D. CAFB Architectural Compatibilty Guide-2013.pdf PDF
C. RFI FORM Template.pdf PDF
Atch 1 SOW CZQZ160061-15 Mar 22.pdf PDF
C. AF 3065 Progress Report Template.xlsx XLSX spreadsheet
D. AEC CAD Standards 6_1-Aug 2019.pdf PDF
A. Pic 3.jpg JPG image
A. Pic 2.jpg JPG image
B. Specifications-16 Mar 22.pdf PDF
D. Contractor Base Briefing Pamphlet-Mar 16.pdf PDF
C. AF 3000 Template.pdf PDF
A. Pic 1.jpg JPG image
D. CAFBI 32-201, June 2020.pdf PDF
A. Pic 4.jpg JPG image
C. AF3064 Schedule Template.xls XLS spreadsheet
A. Existing SPRINKLER (2).jpg JPG image
A. Existing SPRINKLER (3).jpg JPG image
A. Existing SPRINKLER (1).jpg JPG image
A. B190 35% Drawings.pdf PDF
A. As-Built Riser_Diagrams_Details.pdf PDF
D. As-Built Submittal Guidelines-2014.pdf PDF
Atch 2 SOMS - CZQZ160061.xls XLS spreadsheet
D. WD_NM20220016-25 Feb 22.pdf PDF
A. As-Built Fire_Protect_Floor_Plan.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FA485522B0001, B190, Repair Doors, Sprinklers, Tile Briefing Rm COR Nomination
ItemDateQuestionGov't Response
128-Mar-22Removal of hard ceiling (S128, S128A):The existing fixture are of a surface mount type and will not work for a grid ceiling. What type of fixtures are to be supplied? LED flat panel or T8, 2’X4’ or 2’X2’ troffer, 30k or 40k/ or 50k if LED, dimmable?LED 2'x4'
228-Mar-22S115A room enlargement: Do the light fixtures need to match the new fixtures in (S128, S128A) or match existing fixture?Match existing fixture
328-Mar-22Existing PDS (S128, S128A): The existing PDS is piped on the existing ceiling (to be removed and replaced with a grid ceiling). Will new PDS need to be installed or install hangers to remount the existing pipe? PDS will not be available in this area during construction.Install hangers to remount the existing pipe. Protect PDS system in place so it can remain operational.
48-Apr-22On VCT hallways will you give access to the entire hallway to demo and install VCT. Or will we need to demo and install in sections? This will include all hallways.Reference Atch 1 SOW - CZQZ160061 6 April 22 (Amend 1) paragragh 1.5.3. Contractors will propose a phasing plan for work
58-Apr-22On the office wall that is mobile, do we need to move walls to remove VCT that is under it or are we demoing up to wall then tile new VCT up against the old VCT that is still under the wall?yes, included in the most recent SOW.
68-Apr-22What is the voltage of the existing panel that is to be used for electromagneticdoor power, and where is it located?The electromagnetic will tie to Fire Alarm panel, and it is in room 140. The panel is 120V
78-Apr-22Are the existing fluorescent lights in the conference room 2 lamp, 3 lamp or 4 lamp fixtures?4 lamp fixture, however the contractor (after award) is to field verify and submit official AF3000 submittals for Govt. review, prior to purchasing any materials
88-Apr-22Can we email our submission documents instead of placing them on a cd?No, offer must be sealed until public opening