B-2 Test Program Set Interface Test Adapters

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
FA813926Q0019
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Tinker AFB, Oklahoma 73145, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Air Force Sustainment Center at Tinker Air Force Base seeks design, testing, purchase, and delivery of Interface Test Adapters (ITAs) for the B-2 Test Program Set's new TITAN receiver on the Common Organizational Level Tester (COLT), with proposals due June 17, 2026. This is a 100% small business set-aside, firm-fixed-price procurement under FAR Part 12. Amendment 0003, issued May 27, extends the deadline, incorporates Appendix J and a revised Statement of Work dated May 27, and requires contractors to acknowledge receipt of the amendment prior to the June 17 deadline.

Place of performance is Tinker Air Force Base, Oklahoma City, Oklahoma. The contractor must design and produce three adapter types: BRU-44 Cable (8 production units), Powered RLA Interface Box (PRIB, 9 production units), and SBRA Interface Box (SIB, 13 production units), plus one first article of each type. First articles must be delivered within 90 days after receipt of order; production units follow 30 days after first article approval, with one unit per month for each adapter type commencing the month after acceptance testing. PRIB and SIB enclosures must use aluminum alloys 5052-H32 or 6061-T6, weigh no more than 100 pounds each, and fit within 11"×11"×10" dimensions. All designs must match provided electrical schematics pin-for-pin.

Qualification testing includes electrical, physical, visual, and environmental testing (high/low temperature per MIL-STD-810H, shock, EMI, and drop testing); temperature testing for PRIB and SIB first articles requires contractor execution with government personnel present. The government performs separate acceptance testing including end-to-end Test Program Set validation. Deliverables include a Preliminary Technical Data Package (40 days post-award), Design Review Presentation (45 days post-award), Qualification Test Reports (one business day after each test), Final Technical Data Package (ten business days after final acceptance), and Project Residuals. All deliveries are FOB Destination to Tinker Air Force Base. The NAICS code is 336413, Other Aircraft Parts and Auxiliary Equipment Manufacturing; PSC is 4920, Aircraft Maintenance and Repair Shop Specialized Equipment. Evaluation criteria apply best value under FAR Part 12.201-1. Contractors must be registered in SAM.gov. Contact Shanita Manuel (shanita.manuel@us.af.mil) or Anthony Dollard (anthony.dollard@us.af.mil, 405-739-4810).

Notice text

4 versions

Update #4 · Latest ·

****Amendment 0003 is issued to extend the propsal due date, include Appendix J, and provide the revised Statement of Work.

****Amendment 0002 amends CLIN 0007, by removing "Explosion Proof Testing" and incorpoates SOW Rev 1 which removes  "hermetic" and "hermetically" from the document

****Amendment 0001 is issued to extend the proposal due date. Please include a signed copy with your response.****

The 557 software engineering squadron (SWES) has a requirement for the design, testing, purchase, and delivery of Interface Test Adapters (ITAs) for use with the new TITAN receiver on the Common Organizational Level Tester (COLT).

Update #3 ·

****Amendment 0002 amends CLIN 0007, by removing "Explosion Proof Testing" and incorpoates SOW Rev 1 which removes  "hermetic" and "hermetically" from the document

****Amendment 0001 is issued to extend the proposal due date. Please include a signed copy with your response.****

The 557 software engineering squadron (SWES) has a requirement for the design, testing, purchase, and delivery of Interface Test Adapters (ITAs) for use with the new TITAN receiver on the Common Organizational Level Tester (COLT).

Update #2 ·

****Amendment 0001 is issued to extend the proposal due date. Please include a signed copy with your response.****

The 557 software engineering squadron (SWES) has a requirement for the design, testing, purchase, and delivery of Interface Test Adapters (ITAs) for use with the new TITAN receiver on the Common Organizational Level Tester (COLT).

Update #1 ·

The 557 software engineering squadron (SWES) has a requirement for the design, testing, purchase, and delivery of Interface Test Adapters (ITAs) for use with the new TITAN receiver on the Common Organizational Level Tester (COLT).

Files

Show all 17

Notice history

Notice Type Posted
B-2 Test Program Set Interface Test Adapters Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
TT&E and Repair of B-2 Electro-Mechanical Actuators Tinker AFB, Oklahoma 73145, United States · NAICS 336413 Air Force Sustainment Center No set-aside
Pin Wire Tester Evaluation Tinker AFB, Oklahoma 73145, United States · NAICS 541330 Air Force Sustainment Center No set-aside
Remanufacture of B-2 Aft Equipment Bay Door Actuator, NSN: 1680-01-368-2107 Tinker AFB, Oklahoma 73145, United States · NAICS 336413 Air Force Sustainment Center No set-aside
FOPR for F-16 AAGs for the Common Aircraft Portable Reprogrammable Equipment (CAPRE) Secure Memory Loader Verifier (SMLV) United States · NAICS 334515 AFLCMC Robins AFB No set-aside
NAFI Connector Tinker AFB, Oklahoma 73145, United States · NAICS 334417 Air Force Sustainment Center Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity