Appendix-F---CDRL-003--Design-Review-Presentation.pdf

PDF 114 KB Posted

Attached to
B-2 Test Program Set Interface Test Adapters
Solicitation number
FA813926Q0019
Issued by

About this file

This is a DD Form 1423 (Contract Data Requirements List) for the B-2 Test Program Sets project at 557 SWES/MXDPBA. The form specifies a single data item requirement: Briefing Material in the form of a Design Review Presentation (Data Item 003), which serves as an exhibit for the base year contract requirement. The presentation must be delivered in PowerPoint (.pptx) format and is governed by the data acquisition document DI-MGMT-81605, with supplementary requirements from SOW Section 6.2, where the SOW takes precedence in case of conflicts.

The deliverable requires one preliminary submission with a mandatory delivery date no later than forty-five days after contract award, though it must be submitted no later than the same day as the Design Review Meeting. Final acceptance will be performed at destination by 557 SWES/MXDPBA, with technical content and report format subject to their approval. Electronic data delivery via secure email or mutually agreed secure file exchange services is acceptable. Distribution is limited to Distribution Statement D (Department of Defense and U.S. DoD contractors only), with other requests requiring referral to the requiring office. Three copies each of draft and final versions are required to be distributed to the Contracting Officer, Contracting Officer's Representative (COR), and Government Points of Contact (GPOCs), all of whom will be named at time of award. The form was prepared by Angela Holshouser on April 2, 2026, and approved by Garry S. Navas.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024 Page 1 of 2

(Updated 20250617)UNCLASSIFIED

UNCLASSIFIED

Show Attachment Bar

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

B-2 Test Program Sets

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

2. TITLE OF DATA ITEM

Briefing Material

3. SUBTITLE

Design Review Presentation

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81605

5. CONTRACT REFERENCE

SOW Section 6.2

6. REQUIRING OFFICE

557 SWES/MXDPBA

7. DD 250 REQ

DD

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/P

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block B: Exhibit A for Base Year requirement

Block 4: In addition to the requirements listed in DI-MGMT-81605, refer to SOW paragraph 6.2 in it's entirety.

Block 4: Digital copies in PowerPoint (.pptx) Format. Where the requirements of the SOW conflict with DI-MGMT-81605, the SOW shall take precedence.

Block 7: DD means final acceptance performed at destination by 557 SWES/MXDPBA.

Block 8: Technical content and report format to be approved by 557 SWES/MXDPBA.

Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only. Other requests for this document must be referred to 557 SWES/MXDPBA.

Block 10: One preliminary.

Block 12: This deliverable is to be delivered no later than forty-five days after contract award. However, this must be delivered no later than the same day as the Design Review Meeting.

Block 14: Electronic data delivery is acceptable via secure email or other mutually agreed secure file exchange web-based service. The report format should be in PowerPoint (.pptx). Reference SOW Paragraph 6.2.

Block 14: COR, GPOCs, and Contracting Officer will be named at time of award.

add continuation

GPOCs 1 1

COR 1 1

Contracting Officer 1 1

15.TOTAL 3 3 0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Angela Holshouser

H. SIGNED ON 20260402 I. APPROVED BY

Garry S. Navas

J. SIGNATURE + -

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024 Page 2 of 2

(Updated 20250617)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024

Page of (Updated 20250617)

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024

Page of (Updated 20250617)

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY:

14. DISTRIBUTION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES Draft Final Reg Repro

16. REMARKS

14. DISTRIBUTION

15.TOTAL

Image of arrow pointing towards totals

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List"

CurrentPage:
PageCount:
Select Classification from drop-down list.: 1
CUI Indicator Information:
Click on this button to attach a file(s).:
A. CONTRACT LINE ITEM NUMBER: TBD
exhibit: A
C. CATEGORY: Select for "TDP.": 0
C. CATEGORY: Select for "TM.": 0
C. CATEGORY: Select for "OTHER.": 1
C. CATEGORY: Enter specification for "Other.": MGMT
System: B-2 Test Program Sets
ContractNum: TBD
Contractor: TBD
1. DATA ITEM NUMBER: 003
titleDataItem: Briefing Material
subtitle: Design Review Presentation
4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-81605
contractRef: SOW Section 6.2
reqOffice: 557 SWES/MXDPBA
7. DD 250 REQUIREMENT: DD
8. APPROVAL CODE : A
9. DISTRIBUTION STATEMENT REQUIRED: D
freq: ONE/P
asOfDate: N/A
dateFirstSub: See Block 16
dateSubseqSub: N/A
16. REMARKS: Block B: Exhibit A for Base Year requirement

Block 4: In addition to the requirements listed in DI-MGMT-81605, refer to SOW paragraph 6.2 in it's entirety.

Block 4: Digital copies in PowerPoint (.pptx) Format. Where the requirements of the SOW conflict with DI-MGMT-81605, the SOW shall take precedence.

Block 7: DD means final acceptance performed at destination by 557 SWES/MXDPBA.

Block 8: Technical content and report format to be approved by 557 SWES/MXDPBA.

Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only. Other requests for this document must be referred to 557 SWES/MXDPBA.

Block 10: One preliminary.

Block 12: This deliverable is to be delivered no later than forty-five days after contract award. However, this must be delivered no later than the same day as the Design Review Meeting.

Block 14: Electronic data delivery is acceptable via secure email or other mutually agreed secure file exchange web-based service. The report format should be in PowerPoint (.pptx). Reference SOW Paragraph 6.2.

Block 14: COR, GPOCs, and Contracting Officer will be named at time of award.

Click to add continuation field for Remarks:
14. DISTRIBUTION - a. ADDRESSEE, new line: GPOCs
14. DISTRIBUTION - a. ADDRESSEE, new line: COR
14. DISTRIBUTION - a. ADDRESSEE, new line: Contracting Officer
15.TOTAL - Total draft copies is automatically calculated.: 1
15.TOTAL - Total draft copies is automatically calculated.: 1
15.TOTAL - Total draft copies is automatically calculated.: 1
15.TOTAL - Total draft copies is automatically calculated.: 3
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 3
15.TOTAL - Total final reproducible copies is automatically calculated.: 0
priceGrp:
estTotalPrice:
remarks:
preparedBy: Angela Holshouser
J. SIGNATURE: H. SIGNED ON 20260402
J. SIGNATURE: J. SIGNATURE
J. SIGNATURE:
approvedBy: Garry S. Navas
Click to add additional data items.:
Click to delete additional data items.:

File details come from the government source that posted it. Updated .