DD Form 1423 – Contract Data Requirements List
This is a Contract Data Requirements List (DD Form 1423, FEB 2024) establishing data delivery obligations for the B-2 Test Program Sets contract. The primary deliverable is a Preliminary Technical Data Package (TDP) identified as Data Item 002, which must conform to the authority standard DI-SESS-80776B while incorporating additional requirements from the Statement of Work (SOW) Sections 6.1 and 6.3. The requiring office is 557 SWES/MXDPBA. The TDP must be delivered no later than 40 days after contract award, but specifically no later than five business days before the Design Review Meeting referenced in CDRL A003. Digital copies in contractor-approved formats are required, with mechanical and electrical drawings submitted in .dwg, .dxf, or .gbr (Gerber) file formats for non-COTS printed circuit boards. Electronic delivery via DoD SAFE or mutually agreed secure file exchange services is acceptable.
The submission and approval process involves a iterative review cycle with a 10 business day Government review period following the Design Review Meeting, followed by a 10 business day contractor response period for revisions or clarification meetings, continuing until Government Program Officer approval is obtained. Final acceptance occurs at destination by 557 SWES/MXDPBA. Distribution is limited to Department of Defense and U.S. DoD contractors only (Distribution Statement D). The deliverable is scheduled for one-time submission with revisions only if requested by the Government. Three copies of the final package must be distributed to the GPOCs, Contracting Officer Representative (COR), and Contracting Officer, who will be named at contract award.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREVIOUS EDITION MAY BE USED.
DD FORM 1423, FEB 2024 Page 1 of 2
(Updated 20250617)UNCLASSIFIED
UNCLASSIFIED
Show Attachment Bar
CONTRACT DATA REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
B-2 Test Program Sets
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
TECHNICAL DATA PACKAGE (TDP)
3. SUBTITLE
Preliminary Technical Data Package
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80776B
5. CONTRACT REFERENCE
SOW Section 6.1, 6.3
6. REQUIRING OFFICE
557 SWES/MXDPBA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
11. AS OF DATE
N/A
12. DATE OF FIRST SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16. REMARKS
Block B: Exhibit A for Base Year requirement
Block 4: In addition to the requirements listed in DI-SESS-80776B, refer to SOW paragraph 6.1 and 6.3 in it's entirety.
Block 4: Digital copies in Contractor format, however, the Government shall approve the format prior to first submission. Where the requirements of the SOW conflict with DI-SESS-8077B, the SOW shall take precedence.
Block 7: DD means final acceptance performed at destination by 557 SWES/MXDPBA.
Block 8: Technical content and report format to be approved by 557 SWES/MXDPBA. Prior to Government acceptance, the Government may review and require changes within ten business days after the Design Review Meeting. The Contractor in turn shall complete all required changes within ten business days after the government had returned.
Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only. Other requests for this document must be referred to 557 SWES/MXDPBA.
Block 10: One time with revisions if requested by the government.
Block 12: This deliverable is to be delivered no later than forty days after contract award. However, this must be delivered no later than five business days before the Design Review Meeting with (CDRL A003).
Block 13: Only one submission of the Preliminary Technical Data Package is required, unless changes are requested by the Government. The government has ten business days after the date of the Design Review Meeting to provide an e-mail response to approve or disapprove, and to address any questions or comments that the contractor had in the Design Review Meeting. The Contractor will have ten business days to respond via email and either provided an updated package or request an additional meeting to talk through any questions. The process shall continue until the GPOCs approval is obtained. Refer to SOW paragraph 6.3.2.
Block 14: Electronic data delivery is acceptable via download from DoD SAFE (Secure Access File Exchange) (https://safe.apps.mil) or other mutually agreed secure file exchange web-based service.
Electronic format for Mechanical and Electrical drawings need to be in .dwg or .dxf file formats, except for any and all non-commercial off the shelf (non-COTS) Printed Circuit Boards (PCBs) that are in Gerber files (.gbr file format). Reference SOW Paragraph 6.1 for specific formats on all drawings.
Block 14: COR, GPOCs, and Contracting Officer will be named at time of award.
add continuation
GPOCs 1 1
COR 1 1
Contracting Officer 1 1
15.TOTAL 3 3 0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY
Angela Holshouser
H. SIGNED ON 20260402 I. APPROVED BY
Garry S. Navas
J. SIGNATURE + -
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
DD FORM 1423, FEB 2024 Page 2 of 2
(Updated 20250617)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Name of preparer of CDRL.
Item H. Date CDRL was prepared and signature of preparer of CDRL.
Item I. Name of CDRL approval authority.
Item J. Date CDRL was approved and signature of CDRL approval authority.
Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.
Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.
Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.
PREVIOUS EDITION MAY BE USED.
DD FORM 1423, FEB 2024
Page of (Updated 20250617)
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
DD FORM 1423, FEB 2024
Page of (Updated 20250617)
CONTRACT DATA REQUIREMENTS LIST
C. CATEGORY:
14. DISTRIBUTION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES Draft Final Reg Repro
16. REMARKS
14. DISTRIBUTION
15.TOTAL
Image of arrow pointing towards totals
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Name of preparer of CDRL.
Item H. Date CDRL was prepared and signature of preparer of CDRL.
Item I. Name of CDRL approval authority.
Item J. Date CDRL was approved and signature of CDRL approval authority.
Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.
Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.
Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.
9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List"
| CurrentPage: |
| PageCount: |
| Select Classification from drop-down list.: 1 |
| CUI Indicator Information: |
| Click on this button to attach a file(s).: |
| A. CONTRACT LINE ITEM NUMBER: TBD |
| exhibit: A |
| C. CATEGORY: Select for "TDP.": 1 |
| C. CATEGORY: Select for "TM.": 0 |
| C. CATEGORY: Select for "OTHER.": 0 |
| C. CATEGORY: Enter specification for "Other.": |
| System: B-2 Test Program Sets |
| ContractNum: TBD |
| Contractor: TBD |
| 1. DATA ITEM NUMBER: 002 |
| titleDataItem: TECHNICAL DATA PACKAGE (TDP) |
| subtitle: Preliminary Technical Data Package |
| 4. AUTHORITY (Data Acquisition Document Number): DI-SESS-80776B |
| contractRef: SOW Section 6.1, 6.3 |
| reqOffice: 557 SWES/MXDPBA |
| 7. DD 250 REQUIREMENT: DD |
| 8. APPROVAL CODE : A |
| 9. DISTRIBUTION STATEMENT REQUIRED: D |
| freq: ONE/R |
| asOfDate: N/A |
| dateFirstSub: See Block 16 |
| dateSubseqSub: See Block 16 |
| 16. REMARKS: Block B: Exhibit A for Base Year requirement |
Block 4: In addition to the requirements listed in DI-SESS-80776B, refer to SOW paragraph 6.1 and 6.3 in it's entirety.
Block 4: Digital copies in Contractor format, however, the Government shall approve the format prior to first submission. Where the requirements of the SOW conflict with DI-SESS-8077B, the SOW shall take precedence.
Block 7: DD means final acceptance performed at destination by 557 SWES/MXDPBA.
Block 8: Technical content and report format to be approved by 557 SWES/MXDPBA. Prior to Government acceptance, the Government may review and require changes within ten business days after the Design Review Meeting. The Contractor in turn shall complete all required changes within ten business days after the government had returned.
Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S.
DoD contractors only. Other requests for this document must be referred to 557 SWES/MXDPBA.
Block 10: One time with revisions if requested by the government.
Block 12: This deliverable is to be delivered no later than forty days after contract award. However, this must be delivered no later than five business days before the Design Review Meeting with (CDRL A003).
Block 13: Only one submission of the Preliminary Technical Data Package is required, unless changes are requested by the Government. The government has ten business days after the date of the Design Review Meeting to provide an e-mail response to approve or disapprove, and to address any questions or comments that the contractor had in the Design Review Meeting. The Contractor will have ten business days to respond via email and either provided an updated package or request an additional meeting to talk through any questions. The process shall continue until the GPOCs approval is obtained. Refer to SOW paragraph 6.3.2.
Block 14: Electronic data delivery is acceptable via download from DoD SAFE (Secure Access File Exchange) (https://safe.apps.mil) or other mutually agreed secure file exchange web-based service. Electronic format for Mechanical and Electrical drawings need to be in .dwg or .dxf file formats, except for any and all non-commercial off the shelf (non-COTS) Printed Circuit Boards (PCBs) that are in Gerber files (.gbr file format). Reference SOW Paragraph 6.1 for specific formats on all drawings.
Block 14: COR, GPOCs, and Contracting Officer will be named at time of award.
| Click to add continuation field for Remarks: |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: GPOCs |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: COR |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: Contracting Officer |
| 15.TOTAL - Total draft copies is automatically calculated.: 1 |
| 15.TOTAL - Total draft copies is automatically calculated.: 1 |
| 15.TOTAL - Total draft copies is automatically calculated.: 1 |
| 15.TOTAL - Total draft copies is automatically calculated.: 3 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final regular copies is automatically calculated.: 3 |
| 15.TOTAL - Total final reproducible copies is automatically calculated.: 0 |
| priceGrp: |
| estTotalPrice: |
| remarks: |
| preparedBy: Angela Holshouser |
| J. SIGNATURE: H. SIGNED ON 20260402 |
| J. SIGNATURE: J. SIGNATURE |
| J. SIGNATURE: |
| approvedBy: Garry S. Navas |
| Click to add additional data items.: |
| Click to delete additional data items.: |