AZ FLAP PIM FR510(1) Sabino Canyon Park
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 6982AF25B000006
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Mount Lemmon, Arizona 85619, United States
- Points of contact
-
- Eric Grosskreuz cflcontracts@dot.gov (202) 366-4000
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration's Central Federal Lands Highway Division is soliciting bids for the construction of comprehensive infrastructure improvements at Sabino Canyon Park in Arizona. The project encompasses construction of a new 75-space paved parking lot, an Arizona Trail information kiosk, a public restroom facility, and significant improvements to Sabino Canyon Park Road including approximately 21 new on-street parking spaces, asphalt surface rehabilitation for half a mile, and installation of a 5-foot-wide Arizona Trail pathway. Key construction components include 7,000 cubic yards of roadway excavation, 8,200 square feet of soil nail retaining wall, 1,800 tons each of roadway aggregate and asphalt concrete pavement, 180 linear feet of culvert installation, concrete curbing and sidewalk work, and two vault toilet fixtures. The solicitation was issued as an Invitation for Bid with bids due August 26, 2025, and the bid opening has already occurred with seven contractors submitting proposals ranging from $4,986,910.20 to $9,290,338.28. The anticipated project schedule includes contract award in September 2025, Notice to Proceed in September 2025, and contract completion by May 2026.
This procurement is designated as a Total Small Business Set-Aside under NAICS code 237310 for Highway, Street, and Bridge Construction, restricting participation to qualified small businesses. The government's estimated project value ranges between $5 million and $10 million, with the engineer's estimate at $6,842,000 and the lowest responsive bid submitted by Conway Construction Company from Vancouver, Washington at $4,986,910.20. The work will be performed in Mt. Lemmon, Arizona at approximately 7,700 feet elevation within the Coronado National Forest in Pima County. The project timeline spans approximately eight months from Notice to Proceed to completion, with specific environmental constraints including considerations for Mexican Spotted Owl habitat and restrictions on stream work during construction. Contractors must begin performance within 10 calendar days of receiving the Notice to Proceed and provide both performance and payment bonds within 10 calendar days of contract award.
Notice text
TOTAL SMALL BUSINESS SET-SIDE
This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking.
PRINCIPAL WORK ITEMS:
20401-0000 Roadway Excavation: 7,000 CUYD
25902-0000 Soil Nail Retaining Wall: 8,200 SQFT
30202-2000 Roadway Aggregate, Method 2: 1,800 TON
40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON
60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT
60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT
60906-1000 Gutter, Concrete (Ditch): 750 SQYD
61501-0800 Sidewalk, Concrete: 1,100 SQYD
63501-0000 Temporary Traffic Control: LPSM
64603-1000 Fixture, Vault Toilet: 2 EACH
ANTICIPATED SCHEDULE:
Advertisement – July 2025
Award – September 2025
NTP – September 2025
Contract Completion – May 2026
The estimated price range of the project work is between $5 million and $10 million.
Files
Show all 15
Notice history
| Notice | Type | Posted |
|---|---|---|
| AZ FLAP PIM FR510(1) Sabino Canyon Park | Award Notice | |
| This notice | Solicitation | |
| AZ FLAP PIM FR510(1) Sabino Canyon Park | Pre-Solicitation | |
| AZ FLAP PIM FR510(1) Sabino Canyon Park | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity