AZ FLAP PIM FR510(1) Sabino Canyon Park
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF25SS0005
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Mount Lemmon, Arizona 85619, United States
- Points of contact
-
- Eric Grosskreuz cflcontracts@dot.gov (202) 366-4000
- Eric Grosskreuz cflcontrats@dot.gov
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Transportation Federal Highway Administration is seeking qualified prime contractors for the AZ FLAP PIM FR510(1) Sabino Canyon Park project, which involves infrastructure improvements in Pima County, Arizona. The project aims to enhance public access and infrastructure in the Summerhaven community, including constructing a new 75-space parking lot, installing a kiosk, building public restrooms, and improving approximately 0.5 miles of Sabino Canyon Park Road. Interested contractors must submit a detailed response by February 28, 2025, at 2 p.m. local Denver time, which includes a statement of intent, socioeconomic category certifications, bonding capability documentation, and a list of comparable road construction projects. Evaluation criteria will focus on contractors' capabilities, bonding capacity, and prior experience with similar infrastructure development. Potential bidders must be certified in the System for Award Management (SAM) and comply with Small Business Administration size and affiliation regulations.
The pre-solicitation notice does not specify a specific set-aside, but encourages participation from small businesses, including HUBZone, woman-owned, 8(a), and service-disabled veteran-owned small businesses. The project has an estimated budget range between $5 million and $10 million, with key work items including roadway excavation (7,000 cubic yards), soil nail retaining wall construction (8,200 square feet), and asphalt concrete pavement installation (1,800 tons). The anticipated project timeline includes advertisement in May 2025, contract award in July 2025, notice to proceed in August 2025, and contract completion by April 2026. Principal construction activities will involve roadway improvements, culvert installation, concrete work, and the creation of a 5-foot-wide pathway as part of the Arizona Trail. The project represents a significant infrastructure enhancement for the Summerhaven area, focusing on improving accessibility and recreational infrastructure.
Notice text
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service-disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn: Eric Grosskreuz) for receipt by close of business (2 p.m. local Denver time) on February 28, 2025:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor (include Unique Entity ID (UEI));
(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small-disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;
(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $10 million, and your firm’s aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value and scope to the AZ FLAP PIM FR510(1) Sabino Canyon Parkproject in which you have constructed new paved parking lots, kiosk, public restrooms, and pathways.
DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
PROJECT NUMBER: AZ FLAP PIM FR510(1)
PROJECT NAME: Sabino Canyon Park
PROJECT DESCRIPTION: Sabino Canyon Park Road, also known as Forest Road 510, is located within Pima County, Arizona, north of Tucson, Arizona. The project begins on the north at the intersection with Carter Canyon Road and ends at the Forest Service gate. The project length is approximately 0.5 mile.
SCOPE OF THE WORK: The purpose of the project is to improve public access, particularly parking, in the community of Summerhaven, which is at the top of Mt. Lemmon, north of Tucson. Note that CFL built the road from Tucson to Summerhaven over several years and phases in the 90’s and 2000’s. It is very popular during the summer months to escape the Tucson heat. There is also an area where people ski slightly to the north of the project.
This project includes the construction of a new paved parking lot consisting of approximately 75 parking spaces, a kiosk for Arizona Trail information, a public restroom, and the improvement of Sabino Canyon Park Road to accommodate approximately 21 new on-street parking spaces, an asphalt surface rehabilitation for approximately half a mile, and the installation of a 5-foot-wide pathway as part of the Arizona Trail. The project improvements will provide a new paved surface, roadway excavation, retaining wall construction, tree clearing, ditch construction/reconditioning to improve drainage, installation of culverts, a new public bathroom, and the installation of new street signage and pavement marking.
PRINCIPAL WORK ITEMS:
20401-0000 Roadway Excavation: 7,000 CUYD
25902-0000 Soil Nail Retaining Wall: 8,200 SQFT
30202-2000 Roadway Aggregate, Method 2: 1,800 TON
40301-0100 Asphalt Concrete Pavement, Type 1: 1,800 TON
60202-0600 36-Inch Equivalent Diameter Arch Pipe Culvert: 180 LNFT
60901-1700 Curb Concrete, 18-Inch Depth: 1,200 LNFT
60906-1000 Gutter, Concrete (Ditch): 750 SQYD
61501-0800 Sidewalk, Concrete: 1,100 SQYD
63501-0000 Temporary Traffic Control: LPSM
64603-1000 Fixture, Vault Toilet: 2 EACH
ANTICIPATED SCHEDULE:
Advertisement – May 2025
Award – July 2025
NTP – August 2025
Contract Completion – April 2026
The estimated price range of the project work is between $5 million and $10 million.
Notice history
| Notice | Type | Posted |
|---|---|---|
| AZ FLAP PIM FR510(1) Sabino Canyon Park | Award Notice | |
| AZ FLAP PIM FR510(1) Sabino Canyon Park | Solicitation | |
| AZ FLAP PIM FR510(1) Sabino Canyon Park | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| OK FW TSM 10(1) NFH Entrance Road and Parking Improvements | Federal Highway Administration | Total Small Business | |
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity