AK PFH 59(3), Snug Harbor Road Gulley Remediation and Erosion Control

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
69056725Q000008
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
541330 Engineering Services
Place of performance
Cooper Landing, Alaska 99572, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is seeking a small business contractor to perform gulley remediation and erosion control services along Snug Harbor Road in Cooper Landing, Alaska. The project involves procuring and installing topsoil, straw fiber rolls, Type 2D erosion control blankets, and establishing turf on a 0.23-mile section of roadway approximately 1.2 miles east of Sterling Highway. Contractors will be evaluated based on work experience, past performance, and technical capabilities, with specific emphasis on their ability to complete erosion control work without using heavy equipment on unstable slopes. Quotations are due by February 16, 2025, at 2:00 PM Pacific Time, with all work to be completed between June 9 and July 18, 2025. The evaluation will include a comprehensive past performance questionnaire that rates contractors on technical abilities, schedule adherence, cost control, and management performance across nine specific areas.

This procurement is a total small business set-aside under NAICS code 541330 for Erosion Control Engineering Services, with a size standard of $25.5 million. The project will require furnishing 55 cubic yards of topsoil, 1,000 linear feet of straw fiber rolls, 750 square yards of erosion control blankets, and 900 square yards of turf establishment. Work is restricted to specific hours (7 AM - 7 PM weekdays, 8 AM - 7 PM weekends) and will require obtaining a lane closure permit from Alaska DOT&PF at least 45 days before beginning work. The contract will be firm-fixed-price, with the place of performance located in Cooper Landing, Alaska 99572. While no specific incumbent is mentioned, the project appears to be the third phase of ongoing road improvement and erosion control efforts in the area, building upon previous work completed in 2021-2022.

Notice text

2 versions

Update #2 · Latest ·

The proposed contract action is for a firm-fixed-priced services contract. The primary objectives of the proposed project are to procure remediation on gullies that have formed (without placing construction equipment on the slope) and clean-up/repair/replace some of the existing erosion control product placement to reduce the risk of further erosion of the slope. This may include but is not limited to: (1) furnish and install topsoil, (2) furnish and install straw fiber rolls, (3) furnish and install Type 2D erosion control blankets, and (5) furnish and install turf establishment.

The project is located in Cooper Landing, Kenai Peninsula Borough, AK along the Snug Harbor Road. This third phase of the project begins on Snug Harbor Road approximately 1.2 miles east of Sterling Hwy and ends .23 miles to the east of that.

The project with will be work in Summer 2025.

This is a TOTAL SMALL BUSINESS SET-ASIDE and NAICS Code 541330, Erosion Control Engineering Services, applies to this procurement with a size standard of $25.5 million.

Update #1 ·

The proposed contract action is for a firm-fixed-priced services contract. The primary objectives of the proposed project are to procure remediation on gullies that have formed (without placing construction equipment on the slope) and clean-up/repair/replace some of the existing erosion control product placement to reduce the risk of further erosion of the slope. This may include but is not limited to: (1) furnish and install topsoil, (2) furnish and install straw fiber rolls, (3) furnish and install Type 2D erosion control blankets, and (5) furnish and install turf establishment.

The project is located in Cooper Landing, Kenai Peninsula Borough, AK along the Snug Harbor Road. This third phase of the project begins on Snug Harbor Road approximately 1.2 miles east of Sterling Hwy and ends .23 miles to the east of that.

The project is anticipated to go on advertisement in Spring 2025 with work in Summer 2025.

This is a TOTAL SMALL BUSINESS SET-ASIDE and NAICS Code 541330, Erosion Control Engineering Services, applies to this procurement with a size standard of $25.5 million.

Files

Notice history

Notice Type Posted
AK PFH 59(3), Snug Harbor Road Gulley Remediation and Erosion Control Award Award Notice
This notice Latest solicitation Solicitation
AK PFH 59(3), Snug Harbor Road Gulley Remediation and Erosion Control Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors