This file contains prior project plans and as-built drawings for a completed Federal Highway Administration project called "Snug Harbor Road Paving and Bike Lane Phase II" (AK PFH 59(2)) in the Chugach National Forest, Kenai Peninsula Borough, Alaska.
The project involved slope stabilization and ditch reestablishment work along a 0.489-mile section of Snug Harbor Road, with construction completed by Drennon Construction & Consulting Inc. The work began at station 303+15 and ended at station 329+00. Key technical details include a 14-foot traveled way with a 10-foot traveled way and 4-foot shoulder, standard underdrain systems (Types 1 and 2), and erosion control measures including riprap ditches and rolled erosion control products. Construction started on 6/21/2021 and reached substantial completion on 6/9/2022, with Tara Walter serving as the Contracting Officer Representative. The plans include typical sections, vicinity maps, and detailed construction drawings showing drainage systems, slope stabilization features, and road specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0005-A
PRIOR PROJECT PLANS
BRENT L COE Digitally signed by BRENT L COE Date: 2020.07.23 14:51:26 -07'00'INFORMATIO
ATIONONONAL
NONNONONOONOTIONOOOO
ATIOTITI
ATTTIITITIIITITITIIITIITITITITITTIITITIITIITITITIONONOOOOOONONONONONONONONONONONONON A
N
O IININININNNNNFNFNFNFNFFFIIININININNNNNFNFNFNFFFFFIINININININNNNNNNNNIINININININNNNNNNNNNNNNNNNNNN
AAAAAALALALLLLLLL
OONONONNNNANANAAAAAANNNNNN
ATION
TTITI
USE
UUUUSUSUUSUSSE
U
ONLY
8/10/2022
AS-BUILTS DRAWINGS
Drennon Construction & Consulting INC Contractor Rep: Roy Drennon
NTP: 6/21/2021
Completion Date: 6/9/2022 (Substantial) CO Rep: Tara Walter
(2 SHEETS)
AK PFH 59(2) A.2
INFFOR
NFORMA
INFORMRMATIONAL
MATIONAL
MA
AL
NANANAAAAAAAANANA
NF
NALALLLLLLLLLLLLLLLLLLLLL
NNN
FOOOO
NNN
OOOOOOOOROOOOORORORORORORORORRRRRRMRMRMRMRMRMRMRMRMMM
OOORORORORORORORRRRRMRMRMRMRMRMRMRMRRRRRRMRMRMRM
FFFFFFOOOOOOOOOOOOOOOOOOOOOOOORORORORORORRRROOOOOOOOROROROROR
FFFFFFOOOO
MMMMMMM
IIIININININNNNNNN
MAAAAAATATATATATATTTTT
MAAAAAAAAAMATIO
AAAAAATATATATATATTTTITITITITI
M
TTTTTTTTTTITITITIOTIOIOIOIOOOOOOOOO
USE
USUUUUUUSUSUSUSUSUSUUUUUUUUUUUUUSUSUSUSUSUSUSUSUUUUUSUSUSUSUUUUUUUUUUUUUUUUUUUUUUUUUUUUSSEEEEEEEEEEEEEEEESSSSSSSEEESESESESESESESESEEEEESESESESESESESEEEEEEEEEEEE ONLYLYLYLY
NLNLLLLYLY
NLNLLYLY
NLNLNLLLLLLNNLLLLLLLLLLLLYLYY
NNLNNNNLLLNLNNNNNNLLN
YY
INFORMATIONA
ATTIOONAL
TIONNNOOO
ATIOONAALALALAL
ATAT
ALALALALANANANN
ATATATATATTT
AL
NFNFNFNFFFF
ALALALALAL
RRORORO
AATATATATATTAAA
ALALALALALALALAL
ATATATAT OOOOO
IN
USE
USE
USSSSSSS
ONLY
NNNNNNLNLLLL
OOOOOOO
LYLY
INFORMATIONAL
NAL
FOOFOFOFOFFOOOOOOFOFOFO
NALAL
NAAAAANAAAAANANANANANANANAAAANANANAAAAAAAAAAAAAANAAAANAAAAANAAAAAANANANAAAAAANAAAAAAAAAAAAAAANANANANAAAAAAAAAAAAAAAAAAANANANAAANANAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAANAAAANAAANAAAANAANANAAAAAAAAANANAAAAAAANAAAAAAAAAAAAAAAAAAL
NA
FO
NAL
O
AT
NNNNNFNFNFNFFO
IIIOIOIOOOOONOOOOOONON
LLLLLLLLLLLL
TTTTTITITIOTIOIOIOIOOO
OOOOOO
NANANANA
O
TAAAAAAAAAAAAAAT
AA
FOOOOOFOFOFO
ANALLAA
OOOOFFIN
USE
USE
USE
USE
UUSUSUSUSUSUSUSUSUSSSSSSSESESESESESESEEEE
USUS
ONLY
ONLY
ONONONLNLY
NLNNLNLLLNNNN
YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY
ONLNLYLYLYLYLY
NL
| Cover Sheets |
| AK PFH 59(3) - Plan Shts |
| AK PFH 59(3) - Plan Shts |
| Phase 2 Contract Plan Sheet-a -FLATTEN with Note-print |
| Snug Harbor Erosion Survey -pg |
| Snug Harbor Erosion Survey - Sheet 1 of 4 |
| Snug Harbor Erosion Survey - Sheet 2 of 4 |
| Snug Harbor Erosion Survey - Sheet 3 of 4 |
| Snug Harbor Erosion Survey - Sheet 4 of 4 |
| Detail W157-21 Fiber Roll -Print |
| W629-1 RECP print |
Standard 635-6 Lane Closure print
| Cover Sheets |
| Site Photos |
| Cover Sheets |
| AK PFH 59(2) ASBUILTS-Reduced-Printr |
File details come from the government source that posted it. Updated .