AK PFH 59(3), Snug Harbor Road Gulley Remediation and Erosion Control

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
690567-25-SS-0001
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
541330 Engineering Services
Place of performance
Cooper Landing, Alaska, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is conducting market research for a pre-solicitation notice regarding gulley remediation and erosion control services along Snug Harbor Road in Cooper Landing, Alaska. The project requires a firm-fixed-price services contract focused on addressing slope erosion without using construction equipment directly on the slope. Specific contract objectives include installing topsoil, straw fiber rolls, Type 2D erosion control blankets, and establishing turf to mitigate further environmental degradation. This request for information is not a formal proposal solicitation but aims to identify qualified businesses capable of performing the proposed contract work. Interested offerors must submit their response by Tuesday, January 14, 2025, at 2:00 PM Pacific Time.

The contract opportunity is not designated with any specific set-aside status and is categorized under NAICS code 541330 for Engineering Services. The project represents the third phase of ongoing work, covering approximately 0.23 miles of terrain located 1.2 miles east of Sterling Highway. While specific budget details are not disclosed, the project is anticipated to go to advertisement in Spring 2025 with actual work scheduled for Summer 2025. The project falls under the Product Service Code F006 for Natural Resources/Conservation - Land Treatment Practices, indicating a specialized environmental remediation focus. The Federal Highway Administration will use this market research to make appropriate acquisition decisions and assess the potential contractor landscape for this specialized erosion control project.

Notice text

2 versions

Update #2 · Latest ·

This is a "REQUEST FOR INFORMATION" only for the proposed contract work. This is not a request for formal proposals or quotes. Plans and specifications are not available at this time. The intent of this form is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified businesses interested and capable of performing the proposed contract work.

Requirement:
The proposed contract action is for a firm-fixed-priced services contract. The primary objectives of the proposed project are
to procure remediation on gullies that have formed (without placing construction equipment on the slope) and clean-up/repair/replace some of the existing erosion control product placement to reduce the risk of further erosion of the slope. This may include but is not limited to: (1) furnish and install topsoil, (2) furnish and install straw fiber rolls, (3) furnish and install Type 2D erosion control blankets, and (5) furnish and install turf establishment.  No design services are required for this effort.

The project is located in Cooper Landing, Kenai Peninsula Borough, AK along the Snug Harbor Road. This third phase of the project begins on Snug Harbor Road approximately 1.2 miles east of Sterling Hwy and ends .23 miles to the east of that. The project is anticipated to go on advertisement in Spring 2025 with work in Summer 2025

Response:
Any offeror capable of providing this service shall respond to this sources sought by submitting this form no later than Tuesday, January 14, 2025, at 1400 PT.

Update #1 ·

This is a "REQUEST FOR INFORMATION" only for the proposed contract work. This is not a request for formal proposals or quotes. Plans and specifications are not available at this time. The intent of this form is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified businesses interested and capable of performing the proposed contract work.

Requirement:
The proposed contract action is for a firm-fixed-priced services contract. The primary objectives of the proposed project are
to procure remediation on gullies that have formed (without placing construction equipment on the slope) and clean-up/repair/replace some of the existing erosion control product placement to reduce the risk of further erosion of the slope. This may include but is not limited to: (1) furnish and install topsoil, (2) furnish and install straw fiber rolls, (3) furnish and install Type 2D erosion control blankets, and (5) furnish and install turf establishment.

The project is located in Cooper Landing, Kenai Peninsula Borough, AK along the Snug Harbor Road. This third phase of the project begins on Snug Harbor Road approximately 1.2 miles east of Sterling Hwy and ends .23 miles to the east of that. The project is anticipated to go on advertisement in Spring 2025 with work in Summer 2025

Response:
Any offeror capable of providing this service shall respond to this sources sought by submitting this form no later than Tuesday, January 14, 2025, at 1400 PT.

Notice history

Notice Type Posted
AK PFH 59(3), Snug Harbor Road Gulley Remediation and Erosion Control Award Award Notice
AK PFH 59(3), Snug Harbor Road Gulley Remediation and Erosion Control Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements Anchorage, Alaska, United States · NAICS 237310 Federal Highway Administration No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors