AK DOT 135(6), Glenn Highway Rehabilitation Kings River Bridge Section: MP 66. 0 to 67. 2

Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
69056719B000032
Agency
Responses due
Not on record
Set-aside
No set-aside

Opportunity facts

Place of performance
Palmer, Alaska, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice seeks information from contractors for a project to replace the Glenn Highway bridge over the Kings River in Matanuska-Susitna Borough, Alaska. The Alaska Department of Transportation and Public Facilities, in conjunction with the Federal Highway Administration, will solicit bids to replace the existing bridge and conduct rehabilitation work along 1.2 miles of the highway between mileposts 66.0 to 67.2. Interested parties must submit any technical questions by September 2020 and review the preliminary plans available. The solicitation is expected to be posted to SAM.gov in winter 2020-2021, with an anticipated completion date to be determined upon award.

The project has an estimated price range between $10-15 million. No set-aside designation will be used. The work involves bridge construction, grading, paving, drainage and erosion control services. The NAICS code for heavy construction is 237990, while the PSC code for bridge construction is V499. The solicitation number is 69056719B000032. The attached documents provide additional details on the scope of work, including replacement of the existing bridge structure and embankment work. Prospective contractors are encouraged to visit the site in fall 2020.

Notice text

2 versions

Update #2 · Latest ·

*Refresh*

PROJECT: AK DOT 135(6), Glenn Highway Rehabilitation Kings River Bridge Section: MP 66.0 to 67.2, Alaska Department of Transportation and Public Facilities, Matanuska Susitna, Borough, Alaska.

  LOCATION:  17 miles Northeast of Palmer, Alaska.

 WORK: This project consists of replace the existing Glenn Highway bridge over the Kings River.  

 LENGTH: 1.2 miles.

TENTATIVE COMPLETION DATE:  Fall, 2024

ESTIMATED PRICE RANGE: Between $15 million and $20 million.

*See attachments for information update.*

Update #1 ·

PROJECT: AK DOT 135(6), Glenn Highway Rehabilitation Kings River Bridge Section: MP 66.0 to 67.2, Alaska Department of Transportation and Public Facilities, Matanuska Susitna, Borough, Alaska.

  LOCATION:  17 miles Northeast of Palmer, Alaska.

 WORK: This project consists of replace the existing Glenn Highway bridge over the Kings River.  This is a Sources Sought notice see “Description of Work” for additional details

 LENGTH: 1.2 miles.

TENTATIVE COMPLETION DATE:  To be determined 

ESTIMATED PRICE RANGE: Between $10 million and $15 million.

Files

Notice history

Notice Type Posted
AK DOT 135(6), Glenn Highway Rehabilitation Kings River Bridge Section: MP 66. 0 to 67. 2 Award Award Notice
AK DOT 135(6), Glenn Highway Rehabilitation Kings River Bridge Section: MP 66. 0 to 67. 2 Latest solicitation Solicitation
This notice Pre-Solicitation
AK DOT 135(6), Glenn Highway Rehabilitation Kings River Bridge Section: MP 66. 0 to 67. 2 Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements Anchorage, Alaska, United States · NAICS 237310 Federal Highway Administration No set-aside
Acadia National Park Maine, United States · NAICS 237310 Federal Highway Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors