This notice provides details for a bridge replacement project on Alaska's Glenn Highway. The Alaska Department of Transportation and Public Facilities will replace the existing bridge over the Kings River and conduct associated roadwork along a 1.2 mile segment of the highway from milepost 66.0 to 67.2. The project scope includes bridge construction, grading, paving, drainage, erosion control, stabilization work, and removal of the existing bridge. Technical questions must be submitted by email to wfl.plans-spec@dot.gov and general inquiries can be directed to wfl.contracts@dot.gov or 360-619-7520. The solicitation is anticipated for summer 2022 and will be posted on SAM.gov. The estimated value of the contract is between $10-15 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

NOTICE TO PROSPECTIVE BIDDERS

RE: AK DOT 135(6)

Glenn Highway Rehabilitation, Kings River Bridge Section: MP 66.0 to 67.2

Solicitation No. 69056719B000032

The attached preliminary plans are being furnished to aid prospective Bidders in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Bidders are encouraged to view the project during fall as conditions permit. After mid-October, access will be weather dependent; contact the Alaska Department of Transportation and Public Facilities for current road conditions at https://511.alaska.gov/map. No Federal Highway Administration personnel will be available for show-me tours.

Project Location and Type of Work - All project work is located in the Matanuska-Susitna

Borough, Alaska, approximately 24 miles northeast of Palmer, Alaska.

The Kings River Bridge project includes bridge replacement and associated roadwork on a 1.2 mile segment of the Glenn Highway from MP 66.0 to 67.2. The project includes bridge construction, grading, base aggregate, paving, drainage, erosion control, permanent stabilization, and bridge removal.

Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov .

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.

Solicitation documents - Documents will be available during the summer 2022. Please monitor the SAM.gov site for actual date of solicitation release (https:www.sam.gov/). To receive automatic notification through SAM.gov, you must login and select “Follow” feature and follow the steps as indicated.

Thank you for your interest in this project.