ak-13506 Pre-Ad Plans.pdf
PDF 13 MB Posted
- Attached to
- AK DOT 135(6), Glenn Highway Rehabilitation Kings River Bridge Section: MP 66. 0 to 67. 2
- Solicitation number
- 69056719B000032
About this file
This document provides details on a federal contract opportunity for the Alaska Department of Transportation and Public Facilities. The project involves replacing the existing Glenn Highway bridge over the Kings River, located approximately 17 miles northeast of Palmer, Alaska. The work will take place over a 1.2 mile section of highway between mileposts 66.0 to 67.2. The estimated price range for the project is between $10 million to $15 million. Interested parties are sought to provide pre-solicitation information under Solicitation Number 69056719B000032. The lead agency is the Department of Transportation Federal Highway Administration. The anticipated completion date will be determined upon award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Location
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
.0 "O u
<LI
.c u
.0 "O
<LI
C:
Cl "iii
<LI
N N
IJl (1)
.P.
Kod;ak G U I f oo � � n a l a s k a
PACIFIC OCEAN
ALASKA KEY MAP
TYPE OF CONSTRUCTION:
Grading, Base, Paving, Drainage and Structures
DESIGN DESIGNATION:
ADT(2020)
ADT(2040)
V e (max)
60MPH
6.0%
SPECIFICATION:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units.
PLANS PREPARED BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
VANCOUVER, WASHINGTON
- - - - - - - -1 PROJECT MANAGER
R. Johnson
PLANS FOR PROPOSED PROJECT
AK DOT 135(6)
GLENN HIGHWAY REHABILITATION,
KINGS RIVER BRIDGE SECTION:
MP 66.0 TO MP 67 .2
ALASKA DEPARTMENT OF TRANSPORTATION & PUBLIC FACILITIES
MATANUSKA-SUSITNA BOROUGH
ALASKA
LENGTH 1.175 MILES
Scale in miles
25 12.5 0 25 50 75
STATE PROJECT
AK OOT 135(6)
SHEET
NUMBER
A.1
AK DOT&PF PROJECT #CFHWY00774
SECTION INDEX*
A. GENERAL INFORMATION
B. SUMMARIES
C. TYPICAL SECTION
D. PLAN & PROFILE
E. ROAD APPROACH
F. EROSION CONTROL
G. PLANTING
H. DRAINAGE
I. SAFETY
J. TEMPORARY TRAFFIC CONTROL
K. PERMANENT TRAFFIC CONTROL
L. UTILITY
M. BRIDGE
* See Sheet A.2 for index to sheets
APPROVED:
DATE _ _ _ _ _ _
Chief of Engineering, Western Federal Lands Highway Division
PRELIMINARY - NOT FOR CONSTRUCTION
°' STATE PROJECT SHEET '"" NUMBER C
;:!; AK OOT 135(6) A.2
C:
·E
INDEX TO SHEETS INDEX TO SHEETS (CONTINUED)
A. GENERAL INFORMATION J. TEMPORARY TRAFFIC CONTROL
>- A.1 TITLE SHEET J.1 TABULATION OF TEMPORARY TRAFFIC CONTROL QUANTITIES .0
"O A.2 INDEX TO SHEETS J.2 TEMPORARY TRAFFIC CONTROL MISCELLANEOUS SIGN DETAILS QJ u A.3 PLAN SYMBOLS AND ABBREVIATIONS J.3 TEMPORARY TRAFFIC CONTROL ADVANCE SIGNING QJ .r:: u
- A.4 VICINITY MAP SUPPLEMENTAL DETAILS °' J.4-15 STANDARD DRAWINGS
C
B. SUMMARIES
;:!; B.1-4 SUMMARY OF QUANTITIES K. PERMANENT TRAFFIC CONTROL
K.1-2 TABULATION OF PERMANENT TRAFFIC CONTROL QUANTITIES
C. TYPICAL SECTION K.3-5 PERMANENT TRAFFIC CONTROL PLAN
C: C.1 TYPICAL SECTION K.6-10 PERMANENT SIGN DETAILS
C.2 PAVEMENT TRANSITION DETAILS K.11 PERMANENT INLAY PAVEMENT MARKING DETAILS
-c:
C.3 SUBEXCAVATION DETAILS K.12-13 MILLED RUMBLE STRIPS SHOULDER DETAILS
K.14 PERMANENT REFERENCE SIGN DETAILS
D. PLAN & PROFILE K.15 ALASKA DELINEATORS STANDARD DETAILS
D.l TABULATION OF PLAN AND PROFILE QUANTITIES
>- D.2-6 PLAN AND PROFILE L. UTILITY.0
"O D.7 SPECIAL CLEARING AND GRUBBING LIMITS L.1 UNDERGROUND UTILITY CONDUIT LOCATIONS QJ C:
Cl
D.8 SURVEY CONTROL "iii
QJ
- M. BRIDGE
E. ROAD APPROACH M.l GENERAL LAYOUT
E.1 ROAD APPROACH DETAILS M.2 GENERAL NOTES AND ESTIMATE
M.3 FOUNDATION PLAN
F. EROSION CONTROL M.4 RIPRAP LAYOUT
F.1-2 TABULATION OF EROSION CONTROL QUANTITIES M.5 RIPRAP DETAILS
F.3-6 TEMPORARY EROSION CONTROL PLAN M.6 ABUTMENT 1
F.7-8 COMPOST SOCK DETAILS M.7 ABUTMENT 3
F.9 CHECK DAM DETAILS M.8 ABUTMENT DETAILS
F.10 MISCELLANEOUS DETAILS M.9 WINGWALLS
M.10 PIER 2
G. PLANTING M.11 PIER 2 DETAILS
G.1 PLANTING AREAS M.12 FRAMING PLAN AND TYPICAL SECTION
G.2 STANDARD DRAWING M.13 GIRDERS
0 M.14 GIRDER DETAILS N
s' H. DRAINAGE M.15 APPROACH SLAB I H.l TABULATION OF DRAINAGE QUANTITIES M.16 STEEL BRIDGE RAILING 2.
C H.2 DRAINAGE FLUME DETAILS M.17 STRUCTURE TRANSITION RAILING
"C
H.3-8 STANDARD DRAWINGS M.18-23 BORING LOGS .ci
M.24-26 REBAR LIST
-'" I. SAFETY
1.1 TABULATION OF ROADSIDE BARRIER QUANTITIES
1.2 MGS W-BEAM GUARDRAIL STEEL POSTS N
1.3 MGS W-BEAM GUARDRAIL TYPE TANGENT
0 TERMINAL AND GRADING
u n n
0 INDEX TO SHEETS N
N
N
,1 total central angle M.L. main line ..1c curve central angle M.P . mile post diameter matt. material es spiral central angle max. maximum abut. abutment MGAL thousand gallon min. minimum ADT average daily traffic mon. monument
AH ahead appr. approach N north
BK back NC normal crown
B M bench mark 0 . C. on center BP balance point o. too. out to out
br. bridge OD outside diameter brg. bearing OG original ground cc or c. to c. center to center PC point of curve centerline PCC point of compound curve cir. clear PCS point of curve to spiral CMP corrugated metal pipe PI point of intersection col. column pl. plate cone. concrete POC point on curve conn. connection POS point on spiral constr. jt. construction joint POT point on tangent cont. continuous PS point of tangent to spiral point of curve to spiral PSC point of spiral to curve ctrs. centers PST point of spiral to tangent CUFT cubic foot (feet) PT point of tangent culv. culvert pvmt. pavement CUYD cubic yard(s) R radius D diameter R. range DHV design hourly volume R/W right-of-way dia. diameter rdwy. roadway diag. diagonal reinf. reinforcement diaph. diaphragm reqd. required dist. distance rt. or RT right drwg(s). drawing(s) rte. route
E east s south e superelevation rate SADT seasonal average daily traffic El. 94.16 ft elevation with number SC point of spiral to curve elev. elevation sec. section emb. embankment shldr. shoulder edge of pavement SLRY slurry unit EQ oreq. equation spa. spacing, spaces or spaced edge of road SQFT square foot EW edge of water SQYD square yard exc. excavation SRS point of spiral to reverse spiral exp.jt. expansion joint ss point of spiral to spiral (no curve) fin. finish ST point of spiral to tangent STA, Sta. station fig. flange std. standard ft2 square foot stgr. stringer ft3 cubic foot (feet) stiff. stiffener ftg. footing struc. structural u ga. gage (gauge) STS point of spiral to tangent spiral galv. galvanized sym. symmetrical 2.
C hdwl. headwall T tangent distance hex. hexagon T. township
"' HW high water TBM temporary bench mark .,, 0 thd. thread L/1
ID inside diameter TS point of tangent to spiral
jt. joint Ts tangent distance (spiraled curve) "' ---
N typ. typical L/1
L length of curve "' design speed .,, V N lam. lamination 0 vph vehicles per hour "C lat. latitude :g LNFT linear foot (feet) VPI vertical point of intersection long. longitudinal w west LPSM lump sum --- Ls length of spiral yd2 square yard It. or LT left yd3 cubic yard(s) LW low water
N NOTE: 0
0 1. Other symbols used in the plans will be shown in a legendN N on the appropriate plan sheet.
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
¼ Section Line
¼ Section Corner (Found, Projected)
½6 Section Line
½6 Section Corner (Found, Projected)
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Fiber Roll or Wattle
Silt Fence
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Control Point (Terrestrial and GPS); Jump Hub
3 � 1
15 -=-
3 � 1
0 1 6
15 =
- - - - P / L - - - - - - - - - P / L - - -
( 400 )
////////NP////////////////NP////////////
C)
X
G
_2_
BH
EL. 1234.56
X ow
_2_
CP GPS
G
JH
STATE PROJECT SHEET
NUMBER
AK
North Arrow -----1:$±!----,pz-- z Slope Stake Limits
EX IST ING
Top of Cut Toe of Fill - - - - - Transition
Fence
Gate with Fence
Cattleguard
Guardrail
Concrete Barrier
Retaining Wall
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
JE- - X - - X - l < l ! - - - - - 1 : , , _ " : J - - - - l (
O'" ----u-- ----u-- ----u-v u - u
- - - --I UDf - - - - -
OOT 135(6)
PROPOSED
)0( )0(
)()80(
:1------
A.3
- - - - - I U D I - - - -
Overhead/Above Ground Utilities - - - P - - - P - - - P - - - P - -
Underground Utilities - - ---1 w 1-- ---1 w 1- ---1 w 1 - - - - - - 1 w 1 - - -
FM = force main, FO = fiber optic, G = gas, IRR = irrigation, 0 = oil, P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, STEAM= steam, T = telephone, TV= CATV, W = water
Poles (Power, Telephone, Joint Use, ---c::J--- - - o - - ---ITD- Light, Support w/Anchor) --+
Miscellaneous Utility Features T■
EM = electric meter, T = telephone pedestal, TV = CA TV pedestal, UP = transformer or junction box, WF = water fountain
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
NO SCALE
_ - 0 - - R / W _ _ R/W
PIE
- no symbol - TCE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
U.S. CUSTOMARY DETAIL
PLAN SYMBOLS
AND ABBREVIATIONS
1-----D_ET_A_IL_A_PP_RO_V_ED_FO_R_U_SE_ll�/2_0_01 _ _ ----ll DETAIL REVISED: 9/2005 1/2007 10/2009 10/2014 I w 101-1
>-.0 "O � u <LI .c u t: "' -t:
i "O <LI C: Cl "iii <LI
29 ,.----1 "' / _. .... }·····.. ,..l"".,... 1 I
'--- 1 =---.,_ -:-7----0 J' 1
·---+ __ J:_•:c 32 I 0
-:, I I I : -----------i------ I i l J III
- - - - - - - - T_ __
660 r 9 ' :
Ill :
- " - _ I -ff!.,., _., " -uenuer.mik ,J ------/----1
I ' i=b •• ,.,. # :' ,f-,..
o�c,;, I - , .... : ,.,..,._ .. � .,.• . I �30 I
\l h" -\ l ! J ,-.. o { l c l .n t " .... ,,_.,/ <>� 1 (c.. I : I ;.a-.s.----:-- .! --...;;,.--T·-·-· -+----- .:---- -
- :v . :
I 0�11'4
°¾ . -,\ { 35
I \ I P•I
- - : - - - . L··'
, ; l : - -i- ,t \ '. I i( ;
1 0.5
~ I . \_!_..I""'-- - - - -
Scale in miles
0 1 2 3
STATE PROJECT
AK OOT 135(6)
VICINITY MAP
SHEET
NUMBER
A.4 u
<LI
.c u
>-.0 "O
<LI
C:
Cl "iii
<LI
n n N N
N
STATE
AK
PAVEMENT STRUCTURE QUANTITIES £81
PROJECT
OOT 135(6)
SHEET
NUMBER
C.1
ITEM NO. ITEM DESCRIPTION UNIT QUANTTTY ESTIMATING VALUE
20411-0000 SELECT BORROW TON 75,931 1.89 TON/CUYD
30101-2000 AGGREGATE BASE GRADING D TON 12,150 1.97 TON/CUYD
40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 7,240 1.94 TON/CUYD
41201-0000 TACK COAT TON 12 0. 10 GAUSQYD@ 240GAUTON
6'-0" £3
Shoulder
Place 4" depth of
300 FTTYP.
12'-0" 12'-0" Traveled way £21 Traveled way£2J
Profile grade
2% Crown fll
I See Safety Edge Detail
Asphalt concrete pavement, type 1, 5-inch compacted depth, placed in
6'-0"[3] Shoulder
I two equal lifts with tack coat between lifts
(lJ u conserved topsoil over all fills Aggregate base grading D, 7-inch compacted depth
711::\ \
- TIM WI /.:0:<
See Fill Slope Rounding Detail
Existing ground
Existing ground .250 l41 .,..p\e \jaf1'"'
5'-0"
Select borrow, 36-inch compacted depth
GLENN HIGHWAY MP 66.0 - MP 67.2
3395+00.00 to 3419+21.50 AND 3422+54.50 to 3457+00.00
10'-0" I 8=5'-0"
·§ ,,, Ill ,,, (lJ
Point available in survey notes
Pull aggregate base to cover safety edge
Red top
See pavement structure depths this sheet
Slope stake
FILL SLOPE
ROUNDING DETAIL
CUT SLOPE
ROUNDING DETAIL £61
SAFETY EDGE
DETAIL
es:
NO SCALE
FOOTNOTE:
See Cut Slope Rounding Detail
£11 Superelevate roadway on curves at the rate 'e' as indicated on the plan and profile curve data.
£21 See Sheet C.2 for widening locations.
£31 Where guardrail is required, the shoulder width is 6'-6" to accomodate milled rumble strips construction. See Section I and K.
£41 Construct slopes as shown in the Staking Report.
£51 Special clearing and grubbing are required for safety improvements. See Sheet D. 7 for limits.
£61 For cut heights less than "B" reduce "B" to the cut height dimension and reduce the front slope rounding distance proportionally.
£7l See SCR Subsection 201.04 for areas that require reduced cut slope rounding to avoid impact to overhead power pole guy wire anchors.
[BJ Included quantities for traveled way and turnout widening, and road approaches. See Sheet C.2 and Section E.
£91 See Sheet D.2-5 for special ditch locations. Construct special ditches as shown in the Staking Report.
TYPICAL SECTION PRELIMINARY - NOT FOR CONSTRUCTION
k "O QJ -"' u QJ .r::
u t: "'
. D
"O QJ
C:
C l "iii QJ
• 0 c:i +_, c:i 1/"l I') er, [ V ) [ V )
See Sheet C.1 for Pavement Structure
Sawcut and tack
Existing pavement
See Sheet C.1 for pavement Structure
See Sheet M.15 for bridge slab approach structure
I ________
CONNECTION TO EXISTING
PAVEMENT DETAIL
CONNECTION TO BRIDGE
APPROACH SLABS DETAIL
A T 3419+21.50 AND 3422+54.50 A T 3395+00.00 AND 3457+00.00
C) _, c:i I')
0 + a 1/"l c:i N I s t [ V ) " " I
• c:i 9 c:i r:!:
0 + s t
1:35 [ V )
TRAVELED WAY PAVEMENT
WIDTH WIDENING DETAIL
3395+00.00 LT- 3403+00.00 LT
c:i c:i _, _, 'S:I" q:i 'S:I" " " I
Lr) +• ('\/ <:::, 0 _, '<:!" 0\,._, CV)
0 • • + c:i c:i 0 _, _, [ V ) 'S:I" q:i s t 'S:I" " " I
[ V )
I
" " I
" " I !"\i 150'-0" 300'-0" 150'-0"
- - - - - - - - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
CONSTRUCTION TURNOUT
WIDTH WIDENING DETAIL
3427+00.00 RT- 3433+00.00 RT
NO SCALE
STATE PROJECT
AK OOT 135(6)
PAVEMENT TRANSITION
DETAILS
SHEET
NUMBER
C.2 u <LI .c u t: "'
>-.0 "O <LI C: Cl "iii <LI w .c E w l/l M
SUBEXCAVATION QUANTITIES
ITEM NO. ITEM DESCRIPTION UNIT QUANTITY REMARK
20402-0000 SUBEXCAVATION CUYD 120
20435-2000 BACKFILL, GRANULAR (POROUS BACKFILL) CUYD 520 CONTRACT QUANTITY
Subexcavation area Subexcavation area End bridge 3422+34.50
0 •
CX) IO
, - I [",") s:t M
0 \ , - I s:t M
0 0 0 0 0 0 0 , - I N N N N s:t s:t s:t M M M
Begin bridge 3419+41.50
BRIDGE SUBEXCAVATION AREAS
DETAILS
0 0 0 • 0 M _, s:t
N IO N
s:t [",") s:t M M
3418+91.50.00 TO 3419+21.50 and 3422+54.50 TO 3422+84.50
36'-0"
-2.000% f Profile grade
.l!l
,jJ
BdsUng ground variable [1]
Select borrow, 36-inch compacted depth
Asphalt concrete pavement, type 1, 5-inch compacted depth, placed in two equal lifts with tack coat between lifts
Backfill, granular (porous backfill) fZJ Aggregate base grading D, 7-inch compacted depth
Subexcavation
TYPICAL SUBEXCAVATION SECTION
3418+91.50.00 TO 3419+21.50 and 3422+54.50 TO 3422+84.50 £31
NO SCALE
STATE PROJECT
AK DOT 135(6)
FOOTNOTE:
flJ Construct slopes as shown in the Staking Report.
flJ The bottom elevations of subexcavation areas between 3418+91.50 and 3419+21.50, and between 3422+54.50
SHEET
NUMBER
C.3 and 3422+84.50 are 568.0 feet and 566.55 feet, respectively.
£31 See sheet C.1 for cut and fill slope rounding details, safety edge and clearing limit details. See Section I for guardrail details.
SUBEXCAVATION
DETAILS PRELIMINARY - NOT FOR CONSTRUCTION
C) STATE PROJECT SHEET
NUMBER
AK OOT 135(6) 0.1
C)
C:
PLAN AND PROFILE QUANTITIES
.!(! :: ITEM NO. ITEM DESCRIPTION UNIT QUANTTTY 1 ITEM 20302-1200
20101-0000 CLEARING AND GRUBBING ACRE 17[5]
20210-0000 SPECIAL CLEARING AND GRUBBING ACRE 20£5]
REMOVAL OF GUARDRAIL £51
20401-0000 ROADWAY EXCAVATION [ll CY 124,104
- CONSERVED TOPSOIL (INFORMATION ONLY/21.0 CY 7,497 STATION TO STATION LT/RT UNIT(LNFT) "O
QJ
- ROCK EXCAVATION (INFORMATION ONLY) [3] CY 44,000 3418+57.00 3423+o9.00 RT 452 u
QJ
.r:: u
- EXISTING ASPHALT PAVEMENT (INFORMATION ONLY)£4l - CY 3,595 3418+57.00 - 3423+o9.00 LT 452 C)
- EMBANKMENT CON5TRUCTION (INFORMATION ONLY) CY 27,445 3433+92.00 3439+45.00 RT 565 C) -
- EXCESS MATERIAL (INFORMATION ONLY) CY 89,162 TOTAL 1469
C:
ITEM 20301-0700
>- REMOVAL OF DELINEATOR ITEM 20301-2400 .0
"O
QJ
C:
Cl "iii STATION LT/RT UNIT(EACH) STATION LT/RT UNIT(EACH) QJ REMOVAL OF SIGN 0
- 3400+29.00 RT 1 3409+o1.00 RT 1
3400+32.00 LT 1 3409+o4.00 RT 1 STATION LT/RT UNIT(EACH) REMARK
3401+14.00 RT 1 3409+92.00 RT 1 3396+65.00 LT 1 55 MPH SPEED LIMIT
3401+14.00 LT 1 3409+95.00 RT 1 3398+55.00 LT 1 KEEP RIGHT EXCEPT TO PASS
3401+97.00 RT 1 3410+84.00 RT 1 3399+69.00 RT 1 CURVE RIGHT WITH 50 MPH RIDER
3402+o0.00 LT 1 3410+85.00 RT 1 3402+68.00 LT 1 OBJECT MARKER
3403+68.00 RT 1 3411+74.00 RT 1 3402+80.00 LT 1 5TOP
3403+73.00 LT 1 3411+75.00 RT 1 3403+40.00 LT 1 OBJECT MARKER
3404+56.00 RT 1 3412+66.00 RT 1 3416+92.00 RT 1 ROAD NARROW
3404+59.00 LT 1 3412+67.00 RT 1 3418+90.00 RT 1 KINGS RIVER
3405+45.00 RT 1 3413+59.00 RT 1 3419+o8.00 RT 1 CURVE LEFT WITH 50 MPH RIDER FOOTNOTE:
I 3405+48.00 LT 1 3413+60.00 RT 1 3419+57.00 RT 2 OBJECT MARKER r11 Roadway excavation and informational quantities shown Ul Ul l 3406+33.00 RT 1 3414+24.00 RT 1 3422+o7.00 RT 2 OBJECT MARKER are in-place and have not been adjusted for swell or
2. shrinkage factors. See Geotech Report.
3406+37.00 RT 1 3415+42.00 RT 1 3422+72.00 RT 1 KINGS RIVER "'
"O r21 Conserved topsoil quantity is based on assumed depth of.I!!
3407+22.00 RT 1 3416+32.00 RT 1 3427+31.00 RT 1 PASSING LANE 1/2 MILE
3-inch between 3415+00 and 3440+00, and 6-inch between -'" 3407+26.00 RT 1 3416+33.00 RT 1 3436+92.00 RT 1 CURVE LEFT WITH 50 MPH RIDER 3395+00 and 3415+00 and between 3440+00 and 3457+00.
3408+12.00 RT 1 3417+21.00 RT 1 DELAY OF 5 VEHICLES MUST USE f3J Rock excavation estimated quantity is anticipated between 3439+95.00 LT 1N TURNOUTS 3429+70 and 3436+90. 0 3408+13.00 RT 1 3418+12.00 RT 1 0 3418+13.00 RT 1 3448+83.00 RT 1 MP67 f4J Existing asphalt pavement estimated quantity is based on
SUBTOTALS 18 SUBTOTALS 19 3454+23.00 LT 1 CURVE RIGHT WITH 50 MPH RIDER assumed depth of 6-inches.
TOTAL 37 TOTAL 19 f5J Contract quantity.
:,: TABULATION OF "'
,;; PLAN AND PROFILE
N QUANTITIES
C) s, .0 "O u <LI .c u
.0 "O
<LI
C:
Cl "iii
<LI
N
I
Ul Ul
N N N
EXC.
CUYD
! EMB.
CUYD
STATE PROJECT
AK OOT 135(6)
UTILITY CONTACTS:
Matanuska Telephone Association 1740 South Chugach Street Palmer, Alaska 99645
Low wire elev. =621'
(907) 761-2704
AT&T Alascom Inc.
505 E. Bluff Drive Anchorage, Alaska 99501-1100
(907) 264-7797
Matanuska Electric Association 163 E. Industrial Way Palmer, AK 99645-2929 (907)-761-9280
BEGIN PRO.JECT
AK DOT 135(6)
3395+00
GLENN HIGHWAY REHABILITATION
KINGS RIVER BRIDGE SECTION:
MP 66.0 TO MP 67.2
N= 203462.55 E= 116572.61 Elev.= 573.87
R/W Remove sign
- d
POI.£ ,.,
Remove sign
-Ar-·- --, d - - - - - - d
Line to be constructed
R/W
Low wire elev. =610' j ----------- -R,emove sign
Remove delineators, typ. (10)
I l
:C°'f . N o.
1S t - '
CI \
d
T= 1,124.64' L= 1,612.62' � 0.06 ---------
Special ditch RT Special ditch RT : 3400+2,5.00 -3402+25.0() 3402+84.50 - 3!4,07+93.00 t ·
- - - - - - - - ' -- - - - - - - L -'
-- -- -:i -- --- -- --- -- --- - -lJ'
QJ'
.9-:
' ' _Cl.: ' ' '
Special ditr;h LT
3402+�0.00 - 3�07+94.$0
I I I I I I I I I I I I ,.. I I I I I I I I I I I I I I I
- - - - - - - .J - - - - - - - - ' -- - - - - - - L - - - - - - - .J - - - - - - - _ , _ - - - - - - - L - - - - - - - .J - - - - - - - - ' -- - - - - - - L - - - - - - - J - - - - - - - - ' -- - - - - - - L - - - - - _ \ . O . J C ) _ - - - - - ' -- - - - - - - L - - - - - - - .J _ - - - - - - - ' -- - - - - - _L. - - - - - - - .J _ - - - - - - - • - - - - - - - _L. - - - - - - - .J _ - - - - - - - ' -- - - - - - _L. - - - - - - - J - - - - - - - - ' -- - - - - - _L.
I I I I I I I I I I I C ' r ) 1 1 . t ) I I I I I I I I I I I I I I I I I I I I I I I - ' + I I I I I I I I I I I I
:§:\0
3395+00 ui' °' .!::i•
Profil� grade
I I I I
: : ' Existing ground •
I I I I
3397+50
17,843 included 1;658 CUYD of conserved to soil
3400+00
3402+50
SSD = 743'
1< � iti 900· y e
SHEET
NUMBER
D.2
3405+00
PRELIMINARY - N
OT FOR CONSTRUCTION
.0 "O u <LI .c u
.0 "O
<LI
C:
Cl "iii
<LI
Remove delineators, typ. (21) \ \
STATE
AK
-------1 --------e,-----·-
J
Line to be constructed -----
- - -J-----------
:special ditch RT 3402:+84.50 -:3407+93.00
;Special qitch LT 3402:+oo.oo -:3407+94.50
Curve= KRB_02-1
b. = 102 ° 39' 45" (RT)
� R " - 900.00' T= 24.64' L= 1,6'1,2.62' e= 0.06 ----
- - - - - - - -'- - - - - - - - L -'
• •. • • • [ E>;st;ng g,ound
F. - - - _;--=_ - -- - ---::.:.::-- -- -- ----c -------;--------:----- -:--:. - - - - . . . . . . . - - - - , - - -' '
Remove 18" culvert,, -
:special ditch RT
- -3"41{+-cJo.oo :32JH+2 :oo
K = 353......... --+ _ _ _ _ _ _ _____
, ....;_ 300' VC
PROJECT
OOT 135(6)
SHEET
NUMBER
0.3
Ul _ _ _ _ _ _ _ .J _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ L _ _ _ _ _ _ _ .J _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ L _ _ _ _ _ _ _ .J _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ L _ _ _ _ _ _ _ J _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ L. _ _ _ _ _ _ _ .J _ _ _ - - L - - - - - - - - - - - - - - - : - - - - - - - - - - - - - - - _. . .__ : _ : . - _ : _ : : - _ ; . . . - - - - - - - - - - - - - - - - - - - - - : - - - - - - - - - - - - - - - - - - - - - - - ; - - - - - - - -
Ul
580"'
575"' "' "'
:": 560N
0 EXC. N
0 CUYD N
� EMB. 1 CUYD
� 3402+50
3405+00
_ _ _ _ _ _ . J _ '
3407+50
Profile grade I
I I
\ �0.5000%:
I I I I I
I I I I
22,590 (Included 1,310 OUYD o f conserved topsoil)
3410+00
3412+50
CTI +
- - - - M ...
"<I' M
3415+00
560 PRELIMINARY - N
. D ""' C: Cl "iii "'
N N N
EXC.
CUYD
� EMB. 1 CUYD
(j)
� 3415+00
Place riprap, method A, class 6. See Section M
Plate rip� ethod A, class 6. See tioFl �
Place riprap, method A, class 3, See Section H
--d----
STATE PROJECT
AK OOT 135(6)
SHEET
NUMBER
D.4 l.r) c::i 1 -
-1-----1iiL__ _ _ _ _ _ _ _ _ ____jL_---=:::= ..,,.L :::'....Jr:,...L___:
L _
1 _ _
_____ 4' Ripr ap ditch, method A, class 1. See 5ection F -
,-....,..,_R�"",;,'atte-Sign· = - - = - - - · = - - - - - - - ·:..:...· = · :..:...-:.:_:- - - - - - - - -C,� � - ___ --..-_
- - - - - - 661 move guardrails
1, I S , , : : Guardr ail, LT Bridge ra il, LT , , Guardrail, LT �rm ina ,ection Type Tangfi:nt : 3418+4o.5o(j) : : @ f - - - - ; - - - - - - - - - - - - - - · ----;-{ '@ , , (j) 34214+10.50:
-------1:E
- - - - - - - + - - - - - - - - 1
..r-v Matanuska River
Bridge Transi tion R�il . . . . �41.7+66!([).
, r, ;-, ii RT , B Bridge tail, RT . . . . . . . . • . . . . . . . . @)
Guar�r ai l, R(f)_ 3423+35.50
. . . . . Special ditch LcT . . . . ;
34,?9+70.0� - 3432+:60.00
Special di l:ch RT 3414+00.:oo - 3415+25.oo:
Profile:gr ade
Special di tch RT 3417+2,5.00 - 3420+01.0,0
2,240 (Included 349 CUYD of con!l;erved topsoil)
5,668
3417+50
3420+00
: Rip r ap cfitch RT
3422+55.00 - 3423+35.00 ·· · · · · · : see section t · · · · · ··
3422+50
- I
Special ditch RT
34,25+25.0(J - 342Bt00.00
LllN
. . . . . + \O" r-... •
N "<t "<tr-... Mill
3425+00
- - - - - - - - - - - - - - 1 -," '' " " '
2,786 (Inludei:l 542 CUYP of conserved topsoil)
12,745
3427+50
,.__:- - - : - v
3430+00
: I : I :1 :1
I
. to be constructed RB 0 2-2 curve:;�.
:39 " (LT)
o· -;,--,,-,-. /J.c, Lme t:.=
O' R= 1,3 0 0 .9 T= 30 5.44, L= 6 0 0 .0 0 e= 0 .0 54
I
I
� Special ditch LT
. · 3438+:50. . 343:5+00.00 -
_ _ _ _ _ _ _ _ : _ _ _ _ _ _ _ _ : _ _ _ _ _ _ _ _ _'. _ _ _ _ _ _ _ I
K � 10 0
30 CX' vc
I '
: ,�edlip,0;1J ' : ' , ciUYD of coos
, ·oaod598 k e>raYat,o , , , OODCUYDofmc
· 45, , '49(iocloded44, 1,41D , , 3435+00 3432+50 3437+50
Curve- , 34" (LT) 1::,.- 740 46
R= 9 80 .0 0 ' T;:; 748. 9 4' L= 1,278. 9 9
- KRB_0 2-3
e= 0 .0 6
. h method A, Riprap di�e' Section Fclass 1.
Remove sign
'I I
I_
I
I - - - - - - - , - - - ' - - - - - - - - - -
K:= 9 7 6 6 �' vc
: rved topsoil): . CUYD of conse
. d d 7-20
7 353 (Inclu e
3,0 6 9 : · O 3442+5 3440 +0 0
PROJECT
DOT 13S(6)
7 1 1 1 - -
Curve= KRB_02-3 t:.= 74° 46' 34" (LT) R= 980.00' T= 748.94' L= 1,278.99' e= 0.06 - - - -
N
'l O 58
STATE
AK
PROJECT
DOT 135(6)
SHEET
NUMBER
D.6
\ I ) _
/ "I- / o / r / +
_.,,,,- ,roG _.,,,,-- - - - ?
Riprap ditch, method A, c/assl ? - to
_.,,,,- _.,,,,-\.. N
- - - - emove sign _ _,- _,- _.,,,,- _.,,,,-?""' -See Section_£. __-:::;::::::---->-.0 u <LI .c u
Cl "iii
<LI
I 625 I
0 <D _ _ _ _ _ _ l / l Y " " { _
" "<I" "<l"N
"<I" <D
C"'l
Riprap ditch LT 34�4+75.0() - 3453t25.00
--See $ection J=:_
- - - - - - - .J - - - - - - - - : - - - - - - - - - - - - - - - - - - - - - - - - -
: Profile grade
, - - - -550:= 3922' , , K,;, 1049 : '
3qo· vc :
, 1xisting Jround !' ' ' t · I
I
: I
""5: ' U'
- - - - - - - -:- - - - - - QJ ' Q.•
"i:i;
:o
C'<): LI)
: :co
- - - - - - - - ' - - - - - - - - L -'
:635
:630
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 _ _ _ _ _ _ _ _ L _ _ _ _ _ _ _ .J _ _ _ _ _ _ _ _ I _ _ _ _ _ _ _ _ - - - - - - - - - - - - - - - I -
; 645 s s q = 527'
- - - - K 1=-105- - - ' - - - - - - - -� -
300' vc ' l --·---------------
1;
- - - - - - - _I_ - - - - - - - L -
ENDPRO.JECT
AK DOT 135(6)
3457+00.00
GLENN HIGHWAYREHABILITATION
KINGS RIVER BRIDGE SECTION:
MP 66.0 TO MP 67.2
N= 200249.22 E= 120090.76 Elev= 674. 76
E�isting gr�und , , , , , :660 ' •
- - - - - L - - - - - - - .J _ - - - - - - - : - - - - - - - - - - - - - - - - - - - - - - - : - - - - - - - - - - - - - - - - - - - - - - - ; - - - - - - - -
_______ :655
I l / ) 1 ' t '
0 L tl--- -- -- ---_;__ __ ..i_ _ _ _ ;._ _ _ . : ; : - - - - - . : - - - - - - + - : - - - : - : : : - - - : - - - - : : : - - - - - - - - - - - - - - - - - - - - - - - - : - - - - - - - - - - t : § . : 3 5::...__ - : - _ _ : _ _ _ : _ _ : _ _ 7_7 � :635
::i
6 0 0 L - � - � � - . ; . . - - - + - - - - - + - - _ _ _ ; _ - - ; . _ - . ; . . - _ _ _ _ _ ; � � � � , . _ R Q _ . 9 £ ! ' . . ! 2 . . . . Q ! _ � � ! ; ! Q Q � - - - , - - - - � - - - - - - , - - - - c - - - - - - , - - - - - - - + - - - - t - - � - - : - : - - � :sl EXC. 25: 643 Inclwded 2 320 CUYD of conserved :to soil :sl CUYD
� EMB.
L ____ :_ __ _;_ __ _: ___ � - - � - - - � - - � - - - - - - : - - - � - - - - - : - - - - i 4 J 2 7 . _ 7 z . 7 _ _;_ _ _ _ ; _ _ _ --:--_ _ � _ _ _ � _ _ ""7"_----== == == ===::::====::====::== 1 CUYD :sl 3445+00 3447+50 3450+00 3452+50 3455+00 3457+50
"O u <LI .c u t: "'
.0 "O <LI C: Cl "iii <LI
N N
N
#1
LIMIT POINT TABLE
POINT NORTHING EASTING STATION LT/RT OFFSET(FT) POINT NORTHING EASTING STATION LT/RT OFFSET(FT)
1 203608.57 116532.82 3395+D0.00 LT 151.35
2 203319.12 116611.69 3395+D0.00 RT 148.65
3 203475.07 117181.44 3400+90.71 RT 147.97
4 203808.55 117263.45 3402+43.78 LT 156.36
5 203757.47 117600.03 3405+39.09 LT 100.00
6 203539.70 118086.91 3410+25.00 LT 100.00
7 203464.32 118168.46 3411+25.00 LT 100.00
8 203147.68 118375.41 3414+67.51 LT 100.00
9 202797.12 118510.45 3417+96.15 LT 160.68
10 202770.06 118149.81 3418+o6.96 RT 200.81
0.8866 Acre
0.7154 Acre
<i:/ I
I I I 1000'R
I I #5
1000'R
# 6
5.6982 Acre
766.73' R
#3
766.73' R
11 202480.58
12 202474.55
13 202525.73
14 202556.64
15 202414.67
16 202402.59
17 202138.66
18 202140.04
19 201529.47
20 201528.30
\\! j
#10
118162.86 3420+96.73 RT
118255.84 3421+D6.94 RT
118292.42 3420+57.46 RT
118391.90 3420+31.06 LT
118248.50 3421+66.43 RT
118166.37 3421+74.80 RT
118689.08 3424+61.99 LT
118511. 79 3424+52.62 LT
118506.00 430+62.32 LT
118271.82 3430+52.95 RT
I I I t #14 - I
½ 1.2701 Acre #13 -� r cfY6288 Acre
/ #17
: /7 /
5 ----- -----
200.80
108.19
69.34
31.42
118.22
200.80
309.50
132.45
99.20
134.79
2.3032 Acre #20
#21
LIMIT POINT TABLE (CONTINUED)
POINT NORTHING EASTING STATION LT/RT OFFSET(FT)
1.4962 Acre
31 200401.45 118995.10 3444+77.98 LT 152.60
32 200286.58 119292.78 3448+58.74 LT 154.57
33 199992.44 119233.77 3448+54.05 LT 145.40
34 199995.00 119688.39 3452+51.63 RT 151.14
35 200286.31 119616.72 3452+44.41 LT 148.78
36 200397.67 120054.30 3457+00.00 LT 152.87
#2 37 200105.82 120125.98 3457+00.00 RT 147.66
STATE PROJECT SHEET
NUMBER
AK OOT 135(6) 0.7
POINT NORTHING EASTING STATION LT/RT OFFSET(FT)
21 201494.10 118206.95 3430+84.19 RT 201.14
CFHWY007!74
c:? 1, 22 201292.26 118224.48 3432+86.62 RT 192.71 \ \
23 201089.04 118378.23 3434+92.62 RT 52.29 I I
24 201096.26 118570.80 3435+10.90 LT 139.61
25 200875.31 118632.73 3437+69.17 LT 148.29
#36
#37
26 200456.39 118632.57 3441+53.98 RT 52.21
27 200334.42 118653.33 3442+50.96 RT 117.21
28 200280.80 118677.72 3442+99.57 RT 138.44 3455
29 200222.14 118727.15 3443+65.67 RT 150.19
30 200143.71 118841.57 3444+86.15 RT 147.29 #35
I II I I I
Q
I Q
II I I I I I I I
4.1895 Acre
#31
#32
941'R
968'R
I I 1760' R 805'R
#25 #33
IJ)
#24
- ' " # z . 3 - _ - - - # 2 6
Special clearing and grubbing limits, typ. #29 (Area values are CADD measured on plan view)
#30
2.6841 Acre
k Riverr,1atanus a
1245'R
Scale in feet
150 75 0 150 300
SPECIAL CLEARING AND
GRUBBING LIMITS PRELIMINARY - N
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
13102 203306.181 116086.292 564.782 61°44'04.388521" N 148°45'45.901514" W 622.244 0.99992331 5/8"IR W/FHWA ALUM CAP 1.
13103 203562.495 116758.866 576.247 61°44'06.785582" N 148°45'31.839818" W 633.716 0.99992309 5/8"IR W/FHWA ALUM CAP
13104 203686.664 117396.702 589.467 61°44'07.887925" N 148°45'18.551076" W 646.948 0.99992277 5/8"IR W/FHWA ALUM CAP
13105 203382.650 118086.918 584.551 61°44'04.764914" N 148°45'04.345457" W 642.052 0.99992334 5/8"IR W/FHWA ALUM CAP
13106 202627.909 118286.106 575.324 61°43'57.297469" N 148°45'00.512075" W 632.846 0.99992388 5/8"IR W/FHWA ALUM CAP
13107 201899.565 118320.532 571.846 61°43'50.121032" N 148°45'00.088075" W 629.385 0.99992406 5/8"IR W/FHWA ALUM CAP
13108 201134.652 118384.069 572.347 61°43'42.579095" N 148°44'59.074585" W 629.906 0.99992407 5/8"IR W/FHWA ALUM CAP
13109 200406.419 118691.919 587.086 61°43'35.351983" N 148°44'52.976880" W 644.667 0.99992352 1 1/2"DIA ALUM CAP DOT 90
13110 200107.704 119297.105 634.249 61°43'32.296561" N 148°44'40.538405" W 691.848 0.99992157 5/8"IR W/FHWA ALUM CAP
13111 200152.535 119773.789 660.617 61°43'32.647224" N 148°44'30.629133" W 718.224 0.99992054 5/8"IR W/FHWA ALUM CAP
13112 200325.736 120339.571 689.221 61°43'34.244364" N 148°44'18.819309" W 746.833 0.99991946 5/8"IR W/FHWA ALUM CAP
PROJECT : Kings River Section COORDINATE SYSTEM : MV-1, local system developed by ADOT VERTICAL DATUM : Differential levels holding beginning elevation at CP13101
PROJECT UNITS : US SURVEY FOOT
To convert the local coordinates to NAD83(CORS) State Plane U.S. Survey Foot coordinates, translate using +2,624,893.36529 N, +1,738,991.40294 E, and scale using 0.9999202167
C
M yF ile s\
Pr oj ec ts
\A la sk a\
G le nn _H ig hw ay \K in gs
_R iv er _B ri dg e\ de si gn
\P W
K in gs _R iv er
_S ec tio n_
C on tr ol
S he et .x l
-A pr
-2
1:
P
M W
FL
H
D S ur ve y
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.8
SHEET
NUMBER
DOT 135(6)AK
SURVEY CONTROL
Basis of Coordinates:
The Basis of Coordinates is NGS Station PURIN, located near Milepost 91 of the Glenn Highway. Said station has MV‐1 coordinates of 231,730.0664 N, 232,079.1864 E.
Basis of Bearings:
The Basis of Bearings is a local plane bearing between NGS Station PURIN and NGS Station PAQB. NGS Station PAQB bears S 64º53’54”W a distance of 189,974.66 U.S.
Survey Feet from NGS Station PURIN. NGS Station PAQB has MV‐1 coordinates of 151,137.6479 N, 60,046.5335 E Basis of Vertical Control:
The Basis of Vertical Control is NAVD88 as determined by a series of level loops performed by DOT u <LI .c u t: "'
>-.0 "O
<LI
C:
Cl "iii
<LI
N
M
NO.
Approach width
Mainline station � ?JC> "-'"&
Approach number X
1,\ ' o
\o ' ' - - - Approach grade
I I I
\ _ t. of mainline road
I
ROAD APPROACH SYMBOL
3 ¼-inch
STATION
3403+12.50
3414+61.00
3414+61.00
3425+25.00
3442+65.00
2-inch
MAXIMUM CREST
VERTICAL CURVE
MAXIMUM SAG
VERTICAL CURVE
STATE
AK
ROAD APPROACH TABLE
PROJECT
OOT 135(6)
SHEET
NUMBER
E.1
SIDE WIDTH LANDING GRADE(%) RADIUS(FT)
L1 (FT) L2 (FT) REMARK W(FT) (FT)
LT/RT
LT 22 30
LT 24 20
RT 24 20
LT 16 20
RT 16 20
R l
Edge of shoulder
I ,,J
LANDING APPROACH
50 30 2.00% 9.90%
42 21 -2.00% -12.00%
42 18 -2.00% -2.00%
20 67 -2.00% -15.00%
20 12 -2.00% -12.00%
I End road approach
I End pavement see Note 1
I
1-s R2 ,._, ' Cl] ...J e r Edge of shoulder I 8:
,,------, Cl] goo 1 't I ' .y.J
I \ _ _ Edge of traveled way
PLAN VIEW
L1 L2 - I '--
ClJ Landing I
C: ::i ClJ 0 E -c: I l/)
\ 7 " � )0 Cl]
ClJ Cl..
.gi -0 u::i
R1
R2
KINGS RIVER DR.
t_ of highway
I I
"-0 ClJ
.gi u::i
Landing Approach
-----I 1s01° +/-2%max. � --i---r
J -Y--\ \\_ ---_ _VPI I - - -.zs'¾.
Profile grade O (rnak.J Mainline road grade varied
-s Cl] e -0 Cl] e -0
Maximum algebraic difference 8%
PROFILE VIEW
NOTE:
1. Finish landing to mainline with the same pavement structure as shown for mainline. See Sheet C.1 for details.
• I I \ \ - - - = : J
\ _ Asphalt concrete pavement, type 1
\ \ \ Agg,egate base gcad;ng D s-;nch agg,egate base g,ad;ng D
\ _ Select borrow
2. Construct approach fores/opes 1H:6V or flatter slope within the roadway's clear zone. Perform work under Section 622.
3. Pave to the end of radius return unless otherwise indicated.
Finish approach with 5-inch aggregate base.
CONNECTION DETAIL
ROAD APPROACH DETAILS
NO SCALE
AK OOT 135(6) F.1 '""
NOTE:
C: 1. Erosion control plans as shown are approximate. Erosion ·E control devices shown are as symbols and not actual locations.
2. Final locations and spacings of devices may be changed to fit field conditions and as approved by the CO.
3. Contractor may modify the erosion control plans as necessary to accomodate permits and actual operations.
. 0
4. See Section H for culvert outlet riprap protection and drainage"O QI flume details and quantities ..>I. u QI .c u
C
C: SUMMARY OF EROSION CONTROL QUANTITIES "' a:
<: ITEM NO. ITEM DESCRIPTION UNIT QUANTITY
15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING LPSM ALL
15702-3000 SOIL EROSION CONTROL, SUPERVISOR LPSM ALL
15702-5000 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM LPSM ALL [1]. 0
"O
QI
C: 15703-1000 SOIL EROSION CONTROL, SOIL STABILIZATION (TEMPORARY) ACRE 12 [2]Cl 'iii
QI
0 15705-1500 SOIL EROSION CONTROL, COMPOST SOCK (SLOPE PROTECTION) LNFT 6,685
15705-1500 SOIL EROSION CONTROL, COMPOST SOCK (INLET PROTECTION) LNFT 300
15705-1500 SOIL EROSION CONTROL, COMPOST SOCK (OUTLET PROTECTION} LNFT 300
15705-1600 SOIL EROSION CONTROL, ABSORBENT BOOM LNFT 500 [3]
15706-0200 SOIL EROSION CONTROL, CHECK DAM (TEMPORARY) EACH 80
15802-0000 WA TERI NG FOR DUST CONTROL LPSM ALL [4]
25120-0100 RIPRAP DITCH, METHOD A, CLASS 1 LNFT 990
62402-0500 FURNISHING AND PLACING TOPSOIL, 8-INCH DEPTH ACRE 2.5 [2]
62406-3000 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH ACRE 12 [2]
62501-0000 TURF ESTABLISHMENT ACRE 14 [2]
62515-2000 MULCHING, HYDRAULIC METHOD ACRE 18 [2]
N
'5' Ul Ul 2.
C "' 'O m"' "' 5:
FOOTNOTE:
"' r11 Temporary diversion berm is required for construction of"' "' channel guide banks. Estimated diversion length is 1600 FT.
r21 Contract quantity.
u £31 Use as required and as directed by the CO.
r41 See SCR Section 158.
:,: TABULATION OF EROSION "'
M a .;; CONTROL QUANTITIES a N
SHEET 1 OF 2 >-
a M
AK OOT 135(6) F.2 '""
C:
·E
ITEM 15705-1500 ITEM 15705-1500 ITEM 15705-1500
>- SOIL EROSION CONTROL, COMPOST SOCK SOIL EROSION CONTROL, COMPOST SOCK SOIL EROSION CONTROL, COMPOST SOCK . 0 'O QI (SLOPE PROTECTION) (INLET PROTECTION) (OUTLET PROTECTION) .>I. u QI .c u
- STATTON TO STATTON LT/RT UNIT(LNFT) STATTON LT/RT UNIT(LNFT) STATTON LT/RT UNIT(LNFT) °' '"" C 3395+o0 3396+00 LT 200 3396+50.00 LT 60 3396+50.00 RT 60 -
3395+D0 - 3398+00 RT 300 3429+25.00 LT 60 3429+25.00 RT 60
3415+D0 - 3419+00 LT 955 3437+00.00 LT 60 3437+00.00 RT 60
3422+55 - 3427+00 LT 1,275 3442+50.00 LT 60 3442+50.00 RT 60
C:
3428+D0 - 3430+60 RT 260 3448+50.00 LT 60 3448+50.00 RT 60
-c:
3428+50 - 3429+60 LT 220 TOTAL 300 TOTAL 300
3432+D0 - 3451+75 RT 2,575
3442+o0 - 3446+50 LT 900
>- TOTAL 6,685 . 0
'O
QI
C:
Cl 'iii
QI
0 ITEM 25120-0100 -
ITEM 15706-0200
RIPRAP DITCH, METHOD A, CLASS 1
SOIL EROSION CONTROL, CHECK DAM
STATTON TO STATTON LT/RT UNIT(LNFT)
3422+55 - 3423+35 RT 80
(TEMPORARY)
3441+15 - 3441+75 LT 60
STATTON TO STATTON LT/RT UNIT(EACH) 3444+75 - 3453+25 LT 850
3396+25 - 3405+50 LT 8 TOTAL 990
3398+o0 - 3405+50 RT 5
□ 3405+50 - 3414+50 LT 6
N
'5' 3405+50 - 3419+20 RT 9
Ul Ul 3422+55 - 3428+00 RT 4 2.
C
3427+D0 3428+50 LT 1"' -
'O m NOTE: "' 3429+70 - 3431+25 LT 1 5:
3431+25 - 3437+00 LT 5 1. Erosion control plans as shown are approximate. Erosion control devices shown are as symbols and not actual locations.
"' 3430+70 - 3432+00 RT 1 "' 2. Final locations and spacings of devices may be changed to "' 3437+D0 - 3442+00 LT 6 fit field conditions and as approved by the CO.
3446+75 - 3457+00 LT 27 3. Contractor may modify the erosion control plans as necessary 3451+75 - 3457+00 RT 7 to accomodate permits and actual operations.u
TOTAL 80 4. See Section H for culvert outlet riprap protection and drainage flume details and quantities.
:,: TABULATION OF EROSION "'
M a .;; CONTROL QUANTITIES a N
SHEET 2 OF 2 >-
a M
QJ
u
QJ
.r:: u
. D "O
QJ
C:
Cl "iii
QJ
LEGEND:
n
BEGIN PROJECT
3395+00
Soil erosion control, temporary diversion berm
Soil erosion control, compost sock (slope protection)
Soil erosion control, compost sock (inlet protection)
Soil erosion control, compost sock (outlet protection)
Soil erosion control, check dam (temporary)
Riprap ditch, method A, class 1
Place riprap, method A, class 3
Mulching, hydraulic method (special clearing area)
Rolled erosion control product, type 4
Inlet protection
CJmpost sock
Mulching special clearing areas
Turf establishment on finished slope
R/W Temporary check dam
Temporary c
Outlet protection
Place riprap. See Section H
R/W Mulching special clearing areas
Turf establishment on finished slope
STATE PROJECT
AK OOT 135(6)
TEMPORARY EROSION
CONTROL PLAN
3395+00 TO 3415+00
SHEET
NUMBER
F.3
QJ
u
QJ
.r:: u
. D "O
QJ
C:
Cl "iii
QJ
. a·r /· check dam ' . I rempor ......._ ti slope
STATE PROJECT
AK DOT 135(6)
Inlet protection
Ti mporary check dam
M a t � k a River z--.
_ _ Tu�rf establishment on finished slope
Outlet protection :J iprap flume. See Section H
Riprap ditch, method A, class 1
Mulching special clearing area
Riprap outlet
TEMPORARY EROSION
CONTROL PLAN
3415+00 TO 3430+00
SHEET
NUMBER
F.4
·E ><i
.0 "O
QJ
QJ
u 0\ ...
.0 "O
QJ
C:
.ID
N
I
Ul l
Ul
N
I
I I
Mulching special clearing area
I
7"ern ---'E ry r:IJec
Riprap outlet
STATE PROJECT
AK OOT 135(6)
Riprap ditch, method A, class 1
Inlet control
..,,..1/
Riprap ditch, method A, class 1 ; : / ; , _--1/
, l , / Temporary check ,;lam
-- Riprap outlet
Turf establishment on f i n i s � e ------- Outlet control
TEMPORARY EROSION
CONTROL PLAN
3430+00 TO 3445+00
SHEET
NUMBER
F.5
QJ
u
QJ
.r:: u t: "'
. D "O
QJ
C:
Cl "iii
QJ
N
Riprap ditch, method A, class 1
Mulching special clearing area
Turf establishment on finished slope
STATE PROJECT
AK OOT 135(6)
ENDPRO.JECT
3457+00
-- Temporary check dam _ _ _ _ _-----
TEMPORARY EROSION
CONTROL PLAN
3445+00 TO 3457+00
SHEET
NUMBER
F.6
. 0 u <LI .c u
. 0 C
Stakes installed on downhill side of sock (4' O.C. for 12" dia., 6' O.C. for 8" dia.)
or per manufacturer's recommendations
8" (min.) diameter compost sock on slope installed parallel to contours (see Note 3)
Soil stabilization materials
Compost sock at base of slope and at perimeter for sediment control
5'-0" (min.)
(10' Preferred) from toe of slope
Stakes installed on downhill side of sock (4' O.C. for 12" dia., 6' O.C. for 8" dia.)
or per manufacturer's recommendations
Rope
Overlap end sections of compost socks 1 '-6" to achieve a continuous run
3'-0" (min.) transition from top of slope to edge of road
ON SLOPE SECTION
Compost sock (see Note 2)
PERSPECTIVE
Blend soil stabilization material into existing vegetation
Existing vegetation
- - - - Sheet flow
5'-0" (max.)
From top of slope
Curve ends of socks towards the slope
PLAN
COMPOST SOCK SLOPE PROTECTION
STATE PROJECT
AK OOT 135(6)
CFHWY00774
NOTES:
1. Install stakes per manufacturer's recommendations.
2. Place compost socks no closer than 5-feet from the toe of slopes to allow runoff to pool.
3. Install parallel with the contours of the slope with the ends of the socks pointed towards the upslope.
4. Lace together and or overlap for long-run applications to form a continuous length.
5. Use wood stakes to secure compost socks in place if installed on slopes.
6. Soil stabilization materials include rolled erosion control products, mulch, or other temporary ground cover to stabilize unit/ vegetation is established.
7. Repair or replace damaged or displaced compost socks.
8. Remove accumulated sediment when it reaches one-half of the sock height or one-third of the available storage i f protecting a water body or storm drain inlet.
SHEET
NUMBER
F.7
9. Remove all stakes and rope, i f used, from the project and discard .
COMPOST SOCK SPACING
BASED ON SLOPE
SLOPE (V:H) SOCKO.C. SPACING
1:2-1:5 SOFT
STEEPER THAN 1:2 25FT
NO SCALE
COMPOST SOCK DETAILS
SHEET 1 OF 2
. 0 u <LI .c u
. 0 C
Compost sock
End treatment varies
Overlap end sections of compost socks 1 '-6" to achieve a continuous run
COMPOST SOCK
CUL VERT INLET PROTECTION
Compost sock
End treatment varies
COMPOST SOCK
CUL VERT OUTLET PROTECTION
NO SCALE
STATE PROJECT
AK OOT 135(6)
NOTES:
1. Install stakes per manufacturer's recommendations.
2. Place compost socks no closer than 5-feet from the toe of slopes to allow runoff to pool.
3. Use wood stakes to secure compost socks in place i f installed on slopes.
4. Repair or replace damaged or displace compost socks.
5. Remove accumulated sediment before it reaches one-third of the sock height.
6. Remove all stakes and rope, i f used, from the project and discarded.
COMPOST SOCK DETAILS
SHEET 2 OF 2
SHEET
NUMBER
F.8
'O QJ -"' u QJ .r::
u t: "'
.0 C
Trench 2" min.
Curve ends upstream to prevent flow around the ends See Note 6
6" min.
V-ditch design shown.
Check dam installation details are similar for flat-bottom ditches.
CROSS SECTION
Place excavated material on uphill side of fiber roll
See Note 5
Fiber roll 9"0min.
Flow Line Flow
16" min Trench 2" min.
FIBER ROLL
STAKING DETAIL
PLAN VIEW
FIBER ROLL
CHECK DAM SPACING*
(See Note 7)
DITCH CHECK DAM
GRADE SPACING (max.)
(ft) 2% 150 3% 100 4% 80 5% 60
* Spacing calculated based on 9" 0 min fiber roll. Do not use fiber roll check dams on ditch grades steeper than 5%.
FIBER ROLL CHECK DAM
Curve ends upstream to prevent flow around the ends See Note 6
Filter rock
Filter rock
V-DITCH
CROSS SECTION
FLAT-BOTTOM DITCH
CROSS SECTION
Check dam spacing
Ponded water
Ditch grade
PROFILE VIEW
FILTER ROCK
CHECK DAM SPACING
(See Note 7)
DITCH CHECK DAM
GRADE SPACING (max.)
(ft) 2% 150 3% 100 4% 80 5% 60 6% 50
7%-9% 25
FILTER ROCK CHECK DAM
12" (min.)
12" (min.)
NO SCALE
STATE PROJECT
AK OOT 135(6)
NOTE:
1. Construct check dams from fiber rolls, filter rock, or gravel bags as directed by the CO.
2. Repair all rills or gullies and properly compact prior to installation.
3. Install check dams in ditches perpendicular to the flowline.
4. Stake fiber rolls in place with 11#8-inch x 11#8-inch wood stakes. Drive stakes at each end of the fiber roll and at 2-foot (max.) spacing.
5. Drive stakes into undisturbed soil of trench bottom.
Expose stakes 2-inches (min.) above top of fiber roll.
6. Provide sufficient length to prevent water from flowing around the ends of the fiber roll.
7. Adjust check dam spacing based on site-specific conditions.
Gravel bag
CROSS SECTION
GRAVEL BAG
CHECK DAM SPACING*
(See Note 7)
DITCH CHECK DAM
GRADE SPACING (max.)
(ft) 2% 150 3% 100 4% 80 5% 60 6% 50
* Do not use gravel bag check dams on ditch grades steeper than 6%
12" (typ.)
GRAVEL BAG CHECK DAM
CHECK DAM DETAILS
SHEET
NUMBER
F.9
"O u
<LI
. c u
.0 "O
<LI
C:
Cl "iii
<LI
Riprap ditch, method A, class 1
RIPRAP DITCH
42"
3"
SWPPP 4"C
3½"
Permit 123456789 2½"8 3"
Contact: Firstfirst Lastlast 2"C 2"
Phone: 123-456-7890 2"C
14"
BORDER R = 1½" TH =%"IN = ¾"
SWPPP NOTICE SIGN f11
STATE PROJECT SHEET
NUMBER
AK OOT 135(6)
FOOTNOTE:
flJ See SCR Subsection 107.01A(d) for installation locations.
Black border and text on white background. Fabricate sign panel from aluminum. Adjust text as needed for specific project information. Install signs in accordance to Section 635.
MISCELLANEOUS DETAILS
F.10 s, C) k "O
QJ
u
QJ
.r:: u
. D "O
QJ
C:
Cl "iii
QJ
Planting area (Est. 9750 SQFT)
ITEM NO.
62630-0350
62630-0350
62630-0350
(j
SUMMARY OF PLANTING QUANTITIES
ITEM DESCRIPTION
PLANTINGS, TREES, BALLED AND BURLAPPED (SITKA ALDER, 2 GALLON)
PLANTINGS, TREES, BALLED AND BURLAPPED (PAPER BIRCH, 2 GALLON)
PLANTINGS, TREES, BALLED AND BURLAPPED (SITKA SPRUCE, 2 GALLON)
C)
I
,a---==- P _ - _ _ - _ p - - - - - - C) _, STATE
AK
NOTES:
PROJECT
OOT 135(6)
SHEET
NUMBER
G.1
1. Maintain a 25- foot minimum horizontal clearance from the overhead power lines.
2. Planting areas shown are approximate. The CO will mark the exact limits in the field before planting.
UNIT QUANTITY
EACH 225
EACH 50
EACH 50
Matanuska River
PLANTING AREAS PRELIMINARY - N
:E c..
N N
C l
N
For bare root trees and shrubs, prune branches about ½ for nursery stock and about ½ for collected material as indicated by dotted lines. Do not cut leader
14 gage or heavier galvanized wire
Approved conspicuous marker
Wrapping material on deciduous trees where required
Depression to collect water
' I ½" dia. x 12" long nylon, rubber rubber or reinforced plastic hose with tree, wrapping paper under hose r _l
Wire anchored from the trunk at least equal to two-thirds the height of the tree and twisted at the center point
Set plant in hole same level to the natural ground as it stood in nursery
Fasten wires to 2" x 4" x 24" wood stakes or approved metal anchors driven firmly into the ground
Prune any broken roots
Place roots in natural position.
Work topsoil carefully around roots. Soak the topsoil around the roots by pouring water
���:e�;,� s��:,.�t:/ ;�d filled 1//;('\'\ );\\JIii\\ ;t/ -- -· :· V//1\\ '·://\V//1\\'< Roughen subsoil in bottom of hole
Topsoil mixed with specified soil conditioner and throughly mixed prior to placing around roots and scarify sides to prevent sealing /
METHOD OF PLANTING BARE ROOT TREES AND SHRUBS
AND METHOD OF GUYING DECIDUOUS TREES
OVER 12' AND CONIFERS OVER 4'
Settle the loose soil around the ball of earth by soaking it thoroughly with water
Make a depression twice the container or ball diameter on level ground or slope to collect water around plant
Topsoil
't· •,' q - .'_:. : , , : '\' ; .. ,· /\,.
/·( f\: ,,j t- ;).,.·, ' ' . ' , I ' ' . '
I I I >
STATE PROJECT
AK DOT 135(6)
NOTE:
1. Approved commerical plant ties may be used in lieu of hose and wire guying.
2. Provide construction grade, rough or dressed Douglas Fir or Pine stakes.
Set plant in hole same level to the natural ground as it stood in nursery or container
Trees and shrubs.
Place mulch as directed
Cut bindings, and peel down upper half of burlap
Topsoil mixed with specified soil conditioner and throughly mixed prior to placing around ball
Roughen subsoil in bottom of hole and scarify sides to prevent sealing
METHOD OF PLANTING CONTAINER OR
BALLED AND BURLAPPED TREES AND SHRUBS
½" dia. 12" long nylon, rubber or reinforced plastic hose with tree, wrapping paper under hose
Wrapping material on deciduous trees where required
14 gage or heavier galvanized wire or approved plastic ties tied to the tree at a point two-thirds the height of tree above ground and stapled or tied to the stake.
Cut stake off about 12" above the point at which ties are to be made
2" x 2" wood stake driven prior to backfilling or outside ball
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
METHOD OF STAKING
DECIDUOUS TREES UNDER 12'
U.S. CUSTOMARY DETAIL
TREES AND SHRUBS
PLANTING METHODS
SHEET
NUMBER
G.2
NO SCALE
DETAIL APPROVED FOR USE 12/2006 DETAIL
REVISED: W626-1
10.4 x 16 20301 -1900
25101 -0300
25101 -0300
60201 -0800
60201 -1000
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
O
U
TL
ET
P
R O
TE
C
TI
O N
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
D
R A
IN
A G
E
FL
U M
E)
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH CUYD CUYD LNFT LNFT Lt Rt 3396+50 3 80 19 72 3403+12 4 20 70 Left Approach 3414+61 4 20 70 Left Approach 3414+61 4 20 1 70 Right Approach 3422+58 NA 4 32 Drainage Flumes 3429+25 20 1600 19 200 3437+00 10 360 19 88 3442+50 13 720 19 124 3448+50 10 250 19 78 3454+38 2 50 72 18°
PROJECT TOTAL 3124 1 95 32 210 634
Allowable Pipe Material
NOTE:
1. Steel pipe culvert minimum wall thickness is the larger of 0.109" or the thickness 3. HDPE pipe is not allowed when final installation is exposed. Furnish HDPE end sections for AS Aluminized steel required by the Std. 602-1 fill height table. all HDPE pipe. End section is part of HDPE pipe. See Std. 602-5 for acceptable cell class. GS Galvanized steel
2. Aluminized steel pipe culvert minimum wall thickness is the larger of 0.105" or the 4. Do not use aluminized steel material in abrasive conditions. HDPE High Density Polyethylene thickness required by the Std. 602-1 fill height table (steel). (blank) Any appropriate material
Except PVC plastic
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\p w
-w or k\ d0 ak -1
_e a.
xl sx
]S he et
-A ug
-2
3:
P
M N in h
Ph an
/2
K H ar ri so n
/2
D es ig ne d by
C he ck ed b y:
STATE PROJECT
H.1
SHEET
NUMBER
DOT 135(6)AK
Note: The quantities shown hereon are approximate and are subject to field adjustments.
QJ
u
QJ
.r:: u
. D "O
QJ
C:
Cl "iii
QJ
N
N
Finished grade
See Sheet C.1 for pavement structure
I I I J
Placed riprap, method A, class 3
Placed riprap, method A, class 3
I.
CROSS SECTION VIEW
6'
SECTION A-A
Existing ground
DRAINAGE FLUME
At 3422+58
8'
_ [ _ �x:ting ground
SECTION 8-8
Bridge Approach Slab
Guardrail
NO SCALE
STATE PROJECT SHEET
NUMBER
AK OOT 135(6)
Placed riprap, method A, class 3
Aggregate base
PLAN VIEW
NOTE:
1. Excavate to place riprap so that the top of flume sides are at finished grade. Install flume perpendicular to slope contours.
2. Shape the channel to proper grade and cross-section as shown with no abrupt deviations. Extend the drain beyound the toe of the slope and place riprap.
DRAINAGE
FLUME DETAILS
H.2
(X)
Dia.
or Span
Dia.
PLAN VIEW
CULVERT WITH STANDARD
END SECTION
Original ground
Geotextile
SECTION A-A
Dia.
or Span
L
PLAN VIEW
CULVERT WITHOUT STANDARD
END SECTION
Original ground
Geotextile
SECTION 8-8
PROTECTIVE APRON AT CULVERT OUTLET WITHOUT DITCH
L
E
PLAN VIEW
CULVERT WITH STANDARD
END SECTION
SECTION C-C
L
E
PLAN VIEW
CULVERT WITHOUT STANDARD
END SECTION
Match existing ditch slope
Geotextile
Original ground
_ . L .
m:v-Trm � li
SECTION 0-0
OUTLET WITHOUT DITCH
PROTECTIVE APRON DIMENSIONS AND QUANTITIES
FOR INFORMATION ONLY
CULVERT APRON APRON ESTIMATED ESTIMATED
SIZE RIPAP LENGTH DEPTH RIPRAP GEOTEXTILE
D CLASS L H QUANTITY QUANTITY
(INCHES) (FEET) (INCHES) (CUYD) (SQYD)
12 2 4 18 1.0 5 18 2 6 18 2.2 9
WITH 24 2 8 18 3.9 13
END 30 3 12.5 24 10.8 27
SECTION 36 3 15 24 15.6 37
42 4 21 30 34.0 63 48 4 24 30 44.4 78 12 2 6 18 1.7 7 18 2 8 18 3.2 12
WITHOUT 24 2 10 18 5.2 17
END 30 3 14.5 24 13.2 32
SECTION 36 3 17 24 18.5 42
42 4 23 30 38.7 70 48 4 26 30 49.8 86
OUTLET WITH DITCH
PROTECTIVE APRON DIMENSIONS AND QUANTITIES
WITH
END
SECTION
WITHOUT
END
SECTION
Original ground
CULVERT
SIZE
D
(INCHES)
Geotextile
FOR INFORMATION ONLY
RIPAP
CLASS
4D
APRON APRON
LENGTH DEPTH
L H
(FEET) (INCHES)
4 18 6 18 8 18
12.5 24 15 24 21 30 24 30 6 18 8 18 10 18
14.5 24 17 24 23 30 26 30
Sloped 1 V: 2H or flatter
IL__f
.s; C l [ Flowline
SECTION E-E
ESTIMATED
RIPRAP
QUANTITY
(CUYD)
0.9 2.0 3.6 9.3 13.3 27.2 35.6 1.3 2.7 4.4 10.7 15.1 29.8 38.5
ESTIMATED
GEOTEXTILE
QUANTITY
(SQYD)
PROTECTIVE APRON AT CULVERT OUTLET WITH DITCH
NO SCALE
STATE PROJECT
AK OOT 135(6)
NOTE:
1. Use for aprons serving culverts with slopes less than 10%.
2. Furnish separation and stabilization geotextile.
3. Do not measure riprap placement excavation for payment.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
U.S. CUSTOMARY DETAIL
PLACED RIPRAP AT
CULVERT OUTLETS
SHEET
NUMBER
H.3
DETAIL APPROVED FOR USE --/---- DETAIL
REVISED: 8/2016 W251-1
c..
a, N
STATE PROJECT SHEET
NUMBER
METAL ROUND PIPE CULVERT AK OOT 135(6) H.4
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM NOTE:
PIPE 2½" x ½" CORRUGATIONS 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS PIPE 2½" x ½" CORRUGATIONS 3" x 1" CORRUGATIONS 1. When directed, camber pipe culverts upward SIZE MINIMUM METAL THICKNESS (INCH/GAGE) SIZE MINIMUM METAL THICKNESS (INCH/GAGE) from a chord through the inlet and outlet
DIAMETER COVER 0.064/16 0.079/14 0.109/12 0.138/10 0.168/8 0.064/16…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .