Aerial Target Systems 3 - Formal Solicitation

Closed Pre-Solicitation Posted

This opportunity was awarded. See its 5 award notices in the notice history.

Solicitation number
W900KK-24-R-0005
Agency
ACC Orlando Army Contracting Command, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
336411 Aircraft Manufacturing
PSC
1550 Unmanned Aircraft
Place of performance
United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Contracting Command - Orlando (ACC-ORL) intends to solicit proposals for the Aerial Target Systems 3 (ATS-3) requirement. This is a pre-solicitation notice for a multiple award indefinite delivery indefinite quantity (MA/IDIQ) contract to acquire all types of aerial target systems, unmanned aerial systems, subsystems, components and other aerial equipment to replicate aerial threats for research, development, test, evaluation and training. Key requirements include research, design, development, production, technical flight support, engineering support, logistical support, and technical data for these aerial target systems and related ground support equipment. Evaluation criteria will assess offerors' technical solutions, management approaches, and past performance. Questions are due by the stated deadline, and proposals will be due within 45 days after the formal solicitation is released.

The solicitation has no set-aside designation. The total potential contract value is estimated at $95,085,894 over a five-year base period with a six-month option. The Army anticipates awarding multiple five-year IDIQ contracts to qualified offerors to support the Threat Systems Management Office's aerial target programs. No potential incumbent contractors are named, but relevant past performance will be evaluated as part of the source selection process.

Notice text

8 versions

Update #8 · Latest ·

Amendment 0003

The purpose of Amendment 0003 to Solicitation W900KK-24-R-0005 is to provide responses to the additional questions from industry that were received and to update the solicitation as a result. The following changes were made:

1. Updated Section J - List of Documents, Exhibits and Other Attachments, with the following changes:a revised Attachment 03 – Cost-Pricing Workbook, dated 23 JAN 2024 (Amend 0003), a revised Attachment 07 – Cross-Reference Matrix, dated 23 JAN 2024 (Amend 0003), and a revised Attachment 16 – Industry Questions and Answers, dated 23 JAN 2024 (Amend 0003).

2. As a result of questions from industry, changes were made to the following paragraphs of Section L – Proposal Instructions: L.4.1.1(a)(iii).

3. As a result of questions from industry, changes were made to the following paragraphs of Section M – Evaluation Factors for Award: M.7.1.1(a)(iii).

All other terms and conditions of the solicitation remain unchanged. The proposal due date remains 1400 EST on 31 JAN 2024.

Prospective Offerors are reminded signed SF 30s shall be submitted with your proposal acknowledging the amendments.

End of Amendment 0003

________________________________________________________________________________________________________

Amendment 0002

The purpose of Amendment 0002 to Solicitation W900KK-24-R-0005 is to provide responses to the questions from industry that were received by the prescribed due date/time and to update the solicitation as a result. The following changes were made:

1. Updated Section J - List of Documents, Exhibits and Other Attachments, with the following changes: a revised Exhibit A - Contract Data Requirements List, dated 18 JAN 2024, a revised Attachment 01 – Statement of Work, dated 18 JAN 2024, a revised Attachment 03 – Cost-Pricing Workbook, dated 18 JAN 2024, removed Attachment 06 - DFAR 252.215-7009 Proposal Adequacy Checklist, a revised Attachment 07 – Cross-Reference Matrix, dated 18 JAN 2024, changed Attachment 08 to correctly reflect Property Management System, a revised Attachment 11 – Past Performance Questionnaire Cover Letter, dated 18 JAN 2024, added Attachment 15 – Property Management Plan (PMP) Checklist and added Attachment 16 – Industry Questions and Answers, dated 18 JAN 2024.

2. As a result of questions from industry, changes were made to the following paragraphs of Section L – Proposal Instructions: L.2.3, L.2.7, L.3.1, L.4.1, L.4.1.2(a) (Sample Task A), L.4.1.3, L.4.1.3.3, L.4.1.3.4, L.5.1, L.5.5, L.6.1.6, L.6.1.9, L.8.5, L.8.10, L.8.12, L.8.13 and L.8.14.

3. As a result of questions from industry, changes were made to the following paragraphs of Section M – Evaluation Factors for Award: M.3.1, M.7.1.2(a) (Sample Task A), M.7.1.3, M.7.1.3.4, and M.8.

All other terms and conditions of the solicitation remain unchanged. The proposal due date remains 1400 EST on 31 JAN 2024.

Prospective Offerors are reminded signed SF 30s shall be submitted with your proposal acknowledging the amendments.

End of Amendment 0002

________________________________________________________________________________________________________

Amendment 0001

The purpose of Amendment 0001 to Solicitation W900KK-24-R-0005 is to extend the proposal due date to 1400 EST on 31 JAN 2024. Questions from industry have been received and are being processed.  Based on the volume and type of questions received, the Government is extending the proposal due date to 1400 EST on 31 JAN 2024. Amendment 0002 is anticipated to be issued on or about 17 JAN 2024 and will provide responses to the questions that were due back to the Government on 1400 EST 03 JAN 2024.

End of Amendment 0001

________________________________________________________________________________________________________

This notice serves as the official/final Aerial Target Systems 3 (ATS-3) Solicitation/Request for Proposal posting. All documents are the final Solicitation documents.

Solicitation questions are due no later than 2:00 P.M. EST on 03 JAN 2024.

Offeror proposals are due no later than 2:00 P.M. EST on 17 JAN 2024.

All communications between Offerors and the Government pertaining to this ATS-3 solicitation, its attachments and all amendments shall be through the Procuring Contracting Officer (PCO) and the designated Contract Specialist (CS).

U.S. Army Contracting Command - Orlando (ACC - ORL), on behalf of the U.S. Army Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), Project Manager Cyber, Test and Training (PM CT2), Threat Systems Management Office (TSMO) is soliciting proposals for the follow-on Aerial Target Systems 3 (ATS-3) requirement. This is the solicitation notice for this effort. The Solicitation is expected to result in the award of a five-year Multiple Award Indefinite Delivery Indefinite Quantity (MA/IDIQ) contract to a number of qualified offerors.

This synopsis publication satisfies the requirement at FAR Part 5.2 and constitutes the Government's Notice of Intent to solicit proposals for the upcoming Aerial Target Systems 3 (ATS-3) requirement.

The objective of the ATS-3 MA/IDIQ is to provide all types of aerial target systems for the US Army, other Department of Defense (DOD) customers, and foreign clients. Additionally, TSMO maintains an unmanned aerial system (UAS) and cellular capability charged with accurately representing and operating a contemporary threat for U.S. Army training and test events globally. Efforts to accomplish these missions include acquisition of aerial targets, aerial target subsystems, ground support equipment and spares, flight operations, training, and planning; and modification to existing aerial target systems to meet evolving requirements for research and development, test, and training support.

The term “aerial target systems” includes unmanned aerial targets, unmanned aerial systems, subsystems, components, and other aerial systems and equipment that can be used to replicate aerial threats for use in research, development, test and evaluation and training environments.  These systems may be controlled using traditional ground control stations, cellular communication networks, or may operate autonomously.

The attached Statement of Work (SOW) establishes the general requirements for Research, Development, Test and Evaluation (RDT&E), Commercial off-the-shelf (COTS) and non-commercial materials, technical flight, engineering and field support, and logistical and technical support for aerial target programs managed by the TSMO. Research, design, development, production, technical flight, engineering and field support, and technical and logistical support are required for aerial target systems, aerial target subsystems, and components located within the aerial target as well as ground support equipment and control/testing systems external to the aerial target.

The anticipated final award date of the MA/IDIQ contract(s) resulting from the pending solicitation is slated to be in Q4 of FY 2024.

Questions or comments can be addressed to the Contract Specialist, Mr. Thomas Halverson, ACC-Orlando at thomas.l.halverson.civ@army.mil AND to the Contracting Officer, Mr. William Jensen, ACC-Orlando, at william.r.jensen1.civ@army.mil at the date/time listed above.

Update #7 ·

Amendment 0002

The purpose of Amendment 0002 to Solicitation W900KK-24-R-0005 is to provide responses to the questions from industry that were received by the prescribed due date/time and to update the solicitation as a result. The following changes were made:

1. Updated Section J - List of Documents, Exhibits and Other Attachments, with the following changes: a revised Exhibit A - Contract Data Requirements List, dated 18 JAN 2024, a revised Attachment 01 – Statement of Work, dated 18 JAN 2024, a revised Attachment 03 – Cost-Pricing Workbook, dated 18 JAN 2024, removed Attachment 06 - DFAR 252.215-7009 Proposal Adequacy Checklist, a revised Attachment 07 – Cross-Reference Matrix, dated 18 JAN 2024, changed Attachment 08 to correctly reflect Property Management System, a revised Attachment 11 – Past Performance Questionnaire Cover Letter, dated 18 JAN 2024, added Attachment 15 – Property Management Plan (PMP) Checklist and added Attachment 16 – Industry Questions and Answers, dated 18 JAN 2024.

2. As a result of questions from industry, changes were made to the following paragraphs of Section L – Proposal Instructions: L.2.3, L.2.7, L.3.1, L.4.1, L.4.1.2(a) (Sample Task A), L.4.1.3, L.4.1.3.3, L.4.1.3.4, L.5.1, L.5.5, L.6.1.6, L.6.1.9, L.8.5, L.8.10, L.8.12, L.8.13 and L.8.14.

3. As a result of questions from industry, changes were made to the following paragraphs of Section M – Evaluation Factors for Award: M.3.1, M.7.1.2(a) (Sample Task A), M.7.1.3, M.7.1.3.4, and M.8.

All other terms and conditions of the solicitation remain unchanged. The proposal due date remains 1400 EST on 31 JAN 2024.

Prospective Offerors are reminded signed SF 30s shall be submitted with your proposal acknowledging the amendments.

End of Amendment 0002

________________________________________________________________________________________________________

Amendment 0001

The purpose of Amendment 0001 to Solicitation W900KK-24-R-0005 is to extend the proposal due date to 1400 EST on 31 JAN 2024. Questions from industry have been received and are being processed.  Based on the volume and type of questions received, the Government is extending the proposal due date to 1400 EST on 31 JAN 2024. Amendment 0002 is anticipated to be issued on or about 17 JAN 2024 and will provide responses to the questions that were due back to the Government on 1400 EST 03 JAN 2024.

End of Amendment 0001

________________________________________________________________________________________________________

This notice serves as the official/final Aerial Target Systems 3 (ATS-3) Solicitation/Request for Proposal posting. All documents are the final Solicitation documents.

Solicitation questions are due no later than 2:00 P.M. EST on 03 JAN 2024.

Offeror proposals are due no later than 2:00 P.M. EST on 17 JAN 2024.

All communications between Offerors and the Government pertaining to this ATS-3 solicitation, its attachments and all amendments shall be through the Procuring Contracting Officer (PCO) and the designated Contract Specialist (CS).

U.S. Army Contracting Command - Orlando (ACC - ORL), on behalf of the U.S. Army Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), Project Manager Cyber, Test and Training (PM CT2), Threat Systems Management Office (TSMO) is soliciting proposals for the follow-on Aerial Target Systems 3 (ATS-3) requirement. This is the solicitation notice for this effort. The Solicitation is expected to result in the award of a five-year Multiple Award Indefinite Delivery Indefinite Quantity (MA/IDIQ) contract to a number of qualified offerors.

This synopsis publication satisfies the requirement at FAR Part 5.2 and constitutes the Government's Notice of Intent to solicit proposals for the upcoming Aerial Target Systems 3 (ATS-3) requirement.

The objective of the ATS-3 MA/IDIQ is to provide all types of aerial target systems for the US Army, other Department of Defense (DOD) customers, and foreign clients. Additionally, TSMO maintains an unmanned aerial system (UAS) and cellular capability charged with accurately representing and operating a contemporary threat for U.S. Army training and test events globally. Efforts to accomplish these missions include acquisition of aerial targets, aerial target subsystems, ground support equipment and spares, flight operations, training, and planning; and modification to existing aerial target systems to meet evolving requirements for research and development, test, and training support.

The term “aerial target systems” includes unmanned aerial targets, unmanned aerial systems, subsystems, components, and other aerial systems and equipment that can be used to replicate aerial threats for use in research, development, test and evaluation and training environments.  These systems may be controlled using traditional ground control stations, cellular communication networks, or may operate autonomously.

The attached Statement of Work (SOW) establishes the general requirements for Research, Development, Test and Evaluation (RDT&E), Commercial off-the-shelf (COTS) and non-commercial materials, technical flight, engineering and field support, and logistical and technical support for aerial target programs managed by the TSMO. Research, design, development, production, technical flight, engineering and field support, and technical and logistical support are required for aerial target systems, aerial target subsystems, and components located within the aerial target as well as ground support equipment and control/testing systems external to the aerial target.

The anticipated final award date of the MA/IDIQ contract(s) resulting from the pending solicitation is slated to be in Q4 of FY 2024.

Questions or comments can be addressed to the Contract Specialist, Mr. Thomas Halverson, ACC-Orlando at thomas.l.halverson.civ@army.mil AND to the Contracting Officer, Mr. William Jensen, ACC-Orlando, at william.r.jensen1.civ@army.mil at the date/time listed above.

Update #6 ·

Amendment 0001

The purpose of Amendment 0001 to Solicitation W900KK-24-R-0005 is to extend the proposal due date to 1400 EST on 31 JAN 2024. Questions from industry have been received and are being processed.  Based on the volume and type of questions received, the Government is extending the proposal due date to 1400 EST on 31 JAN 2024. Amendment 0002 is anticipated to be issued on or about 17 JAN 2024 and will provide responses to the questions that were due back to the Government on 1400 EST 03 JAN 2024.

End of Amendment 0001

________________________________________________________________________________________________________

This notice serves as the official/final Aerial Target Systems 3 (ATS-3) Solicitation/Request for Proposal posting. All documents are the final Solicitation documents.

Solicitation questions are due no later than 2:00 P.M. EST on 03 JAN 2024.

Offeror proposals are due no later than 2:00 P.M. EST on 17 JAN 2024.

All communications between Offerors and the Government pertaining to this ATS-3 solicitation, its attachments and all amendments shall be through the Procuring Contracting Officer (PCO) and the designated Contract Specialist (CS).

U.S. Army Contracting Command - Orlando (ACC - ORL), on behalf of the U.S. Army Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), Project Manager Cyber, Test and Training (PM CT2), Threat Systems Management Office (TSMO) is soliciting proposals for the follow-on Aerial Target Systems 3 (ATS-3) requirement. This is the solicitation notice for this effort. The Solicitation is expected to result in the award of a five-year Multiple Award Indefinite Delivery Indefinite Quantity (MA/IDIQ) contract to a number of qualified offerors.

This synopsis publication satisfies the requirement at FAR Part 5.2 and constitutes the Government's Notice of Intent to solicit proposals for the upcoming Aerial Target Systems 3 (ATS-3) requirement.

The objective of the ATS-3 MA/IDIQ is to provide all types of aerial target systems for the US Army, other Department of Defense (DOD) customers, and foreign clients. Additionally, TSMO maintains an unmanned aerial system (UAS) and cellular capability charged with accurately representing and operating a contemporary threat for U.S. Army training and test events globally. Efforts to accomplish these missions include acquisition of aerial targets, aerial target subsystems, ground support equipment and spares, flight operations, training, and planning; and modification to existing aerial target systems to meet evolving requirements for research and development, test, and training support.

The term “aerial target systems” includes unmanned aerial targets, unmanned aerial systems, subsystems, components, and other aerial systems and equipment that can be used to replicate aerial threats for use in research, development, test and evaluation and training environments.  These systems may be controlled using traditional ground control stations, cellular communication networks, or may operate autonomously.

The attached Statement of Work (SOW) establishes the general requirements for Research, Development, Test and Evaluation (RDT&E), Commercial off-the-shelf (COTS) and non-commercial materials, technical flight, engineering and field support, and logistical and technical support for aerial target programs managed by the TSMO. Research, design, development, production, technical flight, engineering and field support, and technical and logistical support are required for aerial target systems, aerial target subsystems, and components located within the aerial target as well as ground support equipment and control/testing systems external to the aerial target.

The anticipated final award date of the MA/IDIQ contract(s) resulting from the pending solicitation is slated to be in Q4 of FY 2024.

Questions or comments can be addressed to the Contract Specialist, Mr. Thomas Halverson, ACC-Orlando at thomas.l.halverson.civ@army.mil AND to the Contracting Officer, Mr. William Jensen, ACC-Orlando, at william.r.jensen1.civ@army.mil at the date/time listed above.

Update #5 ·

This notice serves as the official/final Aerial Target Systems 3 (ATS-3) Solicitation/Request for Proposal posting. All documents are the final Solicitation documents.

Solicitation questions are due no later than 2:00 P.M. EST on 03 JAN 2024.

Offeror proposals are due no later than 2:00 P.M. EST on 17 JAN 2024.

All communications between Offerors and the Government pertaining to this ATS-3 solicitation, its attachments and all amendments shall be through the Procuring Contracting Officer (PCO) and the designated Contract Specialist (CS).

U.S. Army Contracting Command - Orlando (ACC - ORL), on behalf of the U.S. Army Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), Project Manager Cyber, Test and Training (PM CT2), Threat Systems Management Office (TSMO) is soliciting proposals for the follow-on Aerial Target Systems 3 (ATS-3) requirement. This is the solicitation notice for this effort. The Solicitation is expected to result in the award of a five-year Multiple Award Indefinite Delivery Indefinite Quantity (MA/IDIQ) contract to a number of qualified offerors.

This synopsis publication satisfies the requirement at FAR Part 5.2 and constitutes the Government's Notice of Intent to solicit proposals for the upcoming Aerial Target Systems 3 (ATS-3) requirement.

The objective of the ATS-3 MA/IDIQ is to provide all types of aerial target systems for the US Army, other Department of Defense (DOD) customers, and foreign clients. Additionally, TSMO maintains an unmanned aerial system (UAS) and cellular capability charged with accurately representing and operating a contemporary threat for U.S. Army training and test events globally. Efforts to accomplish these missions include acquisition of aerial targets, aerial target subsystems, ground support equipment and spares, flight operations, training, and planning; and modification to existing aerial target systems to meet evolving requirements for research and development, test, and training support.

The term “aerial target systems” includes unmanned aerial targets, unmanned aerial systems, subsystems, components, and other aerial systems and equipment that can be used to replicate aerial threats for use in research, development, test and evaluation and training environments.  These systems may be controlled using traditional ground control stations, cellular communication networks, or may operate autonomously.

The attached Statement of Work (SOW) establishes the general requirements for Research, Development, Test and Evaluation (RDT&E), Commercial off-the-shelf (COTS) and non-commercial materials, technical flight, engineering and field support, and logistical and technical support for aerial target programs managed by the TSMO. Research, design, development, production, technical flight, engineering and field support, and technical and logistical support are required for aerial target systems, aerial target subsystems, and components located within the aerial target as well as ground support equipment and control/testing systems external to the aerial target.

The anticipated final award date of the MA/IDIQ contract(s) resulting from the pending solicitation is slated to be in Q4 of FY 2024.

Questions or comments can be addressed to the Contract Specialist, Mr. Thomas Halverson, ACC-Orlando at thomas.l.halverson.civ@army.mil AND to the Contracting Officer, Mr. William Jensen, ACC-Orlando, at william.r.jensen1.civ@army.mil at the date/time listed above.

Update #4 ·

U.S. Army Contracting Command - Orlando (ACC - ORL), on behalf of the U.S. Army Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), Project Manager Cyber, Test and Training (PM CT2), Threat Systems Management Office (TSMO) intends to solicit proposals for the follow-on Aerial Target Systems 3 (ATS-3) requirement. This is a Pre-Solicitation notice for this effort. All documents are drafts and will be finalized and re-published as the Solicitation. The upcoming Solicitation is expected to result in the award of a five-year Multiple Award Indefinite Delivery Indefinite Quantity (MA/IDIQ) contract to a number of qualified offerors.

This synopsis publication satisfies the requirement at FAR Part 5.2 and constitutes the Government's Notice of Intent to solicit proposals for the upcoming Aerial Target Systems 3 (ATS-3) requirement.

The objective of the ATS-3 MA/IDIQ is to provide all types of aerial target systems for the US Army, other Department of Defense (DOD) customers, and foreign clients. Additionally, TSMO maintains an unmanned aerial system (UAS) and cellular capability charged with accurately representing and operating a contemporary threat for U.S. Army training and test events globally. Efforts to accomplish these missions include acquisition of aerial targets, aerial target subsystems, ground support equipment and spares, flight operations, training, and planning; and modification to existing aerial target systems to meet evolving requirements for research and development, test, and training support.

The term “aerial target systems” includes unmanned aerial targets, unmanned aerial systems, subsystems, components, and other aerial systems and equipment that can be used to replicate aerial threats for use in research, development, test and evaluation and training environments.  These systems may be controlled using traditional ground control stations, cellular communication networks, or may operate autonomously.

The attached Statement of Work (SOW) establishes the general requirements for Research, Development, Test and Evaluation (RDT&E), Commercial off-the-shelf (COTS) and non-commercial materials, technical flight, engineering and field support, and logistical and technical support for aerial target programs managed by the TSMO. Research, design, development, production, technical flight, engineering and field support, and technical and logistical support are required for aerial target systems, aerial target subsystems, and components located within the aerial target as well as ground support equipment and control/testing systems external to the aerial target.

Please note this notice does not constitute a Request for Proposal (RFP), Request for Bid (RFB), or Request for Quote (RFQ) and no contract will be awarded on the basis of this synopsis alone. However, a formal Request for RFP (W900KK-24-R-0005) is anticipated to be released in the next 45 days. The anticipated final award date of the MA/IDIQ contract(s) resulting from the pending solicitation is slated to be in Q4 of FY 2024.

Questions are welcomed and expected. Please address all questions or comments to Mr. Thomas Halverson, ACC Orlando, Contract Specialist, at thomas.l.halverson.civ@army.mil AND to Mr. William Jensen, ACC Orlando, Contracting Officer, at william.r.jensen1.civ@army.mil no later than 16:30 EST on 14 November 2023.  If you intend to propose as a prime offeror on this requirement, please provide your company name and contact information (title, phone number and email) to the aforementioned ACC Orlando contacts prior the response due date/time. 

NOTE: Attachment 01, Statement of Work (draft) was removed for administrative changes and will be re-posted with the final RFP package, currently slated for mid-DEC 2023 release.

NOTE: Answers to Industry questions on draft RFP.. 

Update #3 ·

U.S. Army Contracting Command - Orlando (ACC - ORL), on behalf of the U.S. Army Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), Project Manager Cyber, Test and Training (PM CT2), Threat Systems Management Office (TSMO) intends to solicit proposals for the follow-on Aerial Target Systems 3 (ATS-3) requirement. This is a Pre-Solicitation notice for this effort. All documents are drafts and will be finalized and re-published as the Solicitation. The upcoming Solicitation is expected to result in the award of a five-year Multiple Award Indefinite Delivery Indefinite Quantity (MA/IDIQ) contract to a number of qualified offerors.

This synopsis publication satisfies the requirement at FAR Part 5.2 and constitutes the Government's Notice of Intent to solicit proposals for the upcoming Aerial Target Systems 3 (ATS-3) requirement.

The objective of the ATS-3 MA/IDIQ is to provide all types of aerial target systems for the US Army, other Department of Defense (DOD) customers, and foreign clients. Additionally, TSMO maintains an unmanned aerial system (UAS) and cellular capability charged with accurately representing and operating a contemporary threat for U.S. Army training and test events globally. Efforts to accomplish these missions include acquisition of aerial targets, aerial target subsystems, ground support equipment and spares, flight operations, training, and planning; and modification to existing aerial target systems to meet evolving requirements for research and development, test, and training support.

The term “aerial target systems” includes unmanned aerial targets, unmanned aerial systems, subsystems, components, and other aerial systems and equipment that can be used to replicate aerial threats for use in research, development, test and evaluation and training environments.  These systems may be controlled using traditional ground control stations, cellular communication networks, or may operate autonomously.

The attached Statement of Work (SOW) establishes the general requirements for Research, Development, Test and Evaluation (RDT&E), Commercial off-the-shelf (COTS) and non-commercial materials, technical flight, engineering and field support, and logistical and technical support for aerial target programs managed by the TSMO. Research, design, development, production, technical flight, engineering and field support, and technical and logistical support are required for aerial target systems, aerial target subsystems, and components located within the aerial target as well as ground support equipment and control/testing systems external to the aerial target.

Please note this notice does not constitute a Request for Proposal (RFP), Request for Bid (RFB), or Request for Quote (RFQ) and no contract will be awarded on the basis of this synopsis alone. However, a formal Request for RFP (W900KK-24-R-0005) is anticipated to be released in the next 45 days. The anticipated final award date of the MA/IDIQ contract(s) resulting from the pending solicitation is slated to be in Q4 of FY 2024.

Questions are welcomed and expected. Please address all questions or comments to Mr. Thomas Halverson, ACC Orlando, Contract Specialist, at thomas.l.halverson.civ@army.mil AND to Mr. William Jensen, ACC Orlando, Contracting Officer, at william.r.jensen1.civ@army.mil no later than 16:30 EST on 14 November 2023.  If you intend to propose as a prime offeror on this requirement, please provide your company name and contact information (title, phone number and email) to the aforementioned ACC Orlando contacts prior the response due date/time. 

NOTE: Attachment 01, Statement of Work (draft) was removed for administrative changes and will be re-posted with the final RFP package, currently slated for mid-DEC 2023 release.

Update #2 ·

U.S. Army Contracting Command - Orlando (ACC - ORL), on behalf of the U.S. Army Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), Project Manager Cyber, Test and Training (PM CT2), Threat Systems Management Office (TSMO) intends to solicit proposals for the follow-on Aerial Target Systems 3 (ATS-3) requirement. This is a Pre-Solicitation notice for this effort. All documents are drafts and will be finalized and re-published as the Solicitation. The upcoming Solicitation is expected to result in the award of a five-year Multiple Award Indefinite Delivery Indefinite Quantity (MA/IDIQ) contract to a number of qualified offerors.

This synopsis publication satisfies the requirement at FAR Part 5.2 and constitutes the Government's Notice of Intent to solicit proposals for the upcoming Aerial Target Systems 3 (ATS-3) requirement.

The objective of the ATS-3 MA/IDIQ is to provide all types of aerial target systems for the US Army, other Department of Defense (DOD) customers, and foreign clients. Additionally, TSMO maintains an unmanned aerial system (UAS) and cellular capability charged with accurately representing and operating a contemporary threat for U.S. Army training and test events globally. Efforts to accomplish these missions include acquisition of aerial targets, aerial target subsystems, ground support equipment and spares, flight operations, training, and planning; and modification to existing aerial target systems to meet evolving requirements for research and development, test, and training support.

The term “aerial target systems” includes unmanned aerial targets, unmanned aerial systems, subsystems, components, and other aerial systems and equipment that can be used to replicate aerial threats for use in research, development, test and evaluation and training environments.  These systems may be controlled using traditional ground control stations, cellular communication networks, or may operate autonomously.

The attached Statement of Work (SOW) establishes the general requirements for Research, Development, Test and Evaluation (RDT&E), Commercial off-the-shelf (COTS) and non-commercial materials, technical flight, engineering and field support, and logistical and technical support for aerial target programs managed by the TSMO. Research, design, development, production, technical flight, engineering and field support, and technical and logistical support are required for aerial target systems, aerial target subsystems, and components located within the aerial target as well as ground support equipment and control/testing systems external to the aerial target.

Please note this notice does not constitute a Request for Proposal (RFP), Request for Bid (RFB), or Request for Quote (RFQ) and no contract will be awarded on the basis of this synopsis alone. However, a formal Request for RFP (W900KK-24-R-0005) is anticipated to be released in the next 45 days. The anticipated final award date of the MA/IDIQ contract(s) resulting from the pending solicitation is slated to be in Q4 of FY 2024.

Questions are welcomed and expected. Please address all questions or comments to Mr. Thomas Halverson, ACC Orlando, Contract Specialist, at thomas.l.halverson.civ@army.mil AND to Mr. William Jensen, ACC Orlando, Contracting Officer, at william.r.jensen1.civ@army.mil no later than 16:30 EST on 14 November 2023.  If you intend to propose as a prime offeror on this requirement, please provide your company name and contact information (title, phone number and email) to the aforementioned ACC Orlando contacts prior the response due date/time. 

Update #1 ·

U.S. Army Contracting Command - Orlando (ACC - ORL), on behalf of the U.S. Army Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), Project Manager Cyber, Test and Training (PM CT2), Threat Systems Management Office (TSMO) intends to solicit proposals for the follow-on Aerial Target Systems 3 (ATS-3) requirement. This is a Pre-Solicitation notice for this effort. All documents are drafts and will be finalized and re-published as the Solicitation. The upcoming Solicitation is expected to result in the award of a five-year Multiple Award Indefinite Delivery Indefinite Quantity (MA/IDIQ) contract to a number of qualified offerors.

This synopsis publication satisfies the requirement at FAR Part 5.2 and constitutes the Government's Notice of Intent to solicit proposals for the upcoming Aerial Target Systems 3 (ATS-3) requirement.

The objective of the ATS-3 MA/IDIQ is to provide all types of aerial target systems for the US Army, other Department of Defense (DOD) customers, and foreign clients. Additionally, TSMO maintains an unmanned aerial system (UAS) and cellular capability charged with accurately representing and operating a contemporary threat for U.S. Army training and test events globally. Efforts to accomplish these missions include acquisition of aerial targets, aerial target subsystems, ground support equipment and spares, flight operations, training, and planning; and modification to existing aerial target systems to meet evolving requirements for research and development, test, and training support.

The term “aerial target systems” includes unmanned aerial targets, unmanned aerial systems, subsystems, components, and other aerial systems and equipment that can be used to replicate aerial threats for use in research, development, test and evaluation and training environments.  These systems may be controlled using traditional ground control stations, cellular communication networks, or may operate autonomously.

The attached Statement of Work (SOW) establishes the general requirements for Research, Development, Test and Evaluation (RDT&E), Commercial off-the-shelf (COTS) and non-commercial materials, technical flight, engineering and field support, and logistical and technical support for aerial target programs managed by the TSMO. Research, design, development, production, technical flight, engineering and field support, and technical and logistical support are required for aerial target systems, aerial target subsystems, and components located within the aerial target as well as ground support equipment and control/testing systems external to the aerial target.

Please note this notice does not constitute a Request for Proposal (RFP), Request for Bid (RFB), or Request for Quote (RFQ) and no contract will be awarded on the basis of this synopsis alone. However, a formal Request for RFP (W900KK-24-R-0005) is anticipated to be released in the next 45 days. The anticipated final award date of the MA/IDIQ contract(s) resulting from the pending solicitation is slated to be in Q4 of FY 2024.

Questions are welcomed and expected. Please address all questions or comments to Mr. Thomas Halverson, ACC Orlando, Contract Specialist, at thomas.l.halverson.civ@army.mil AND to Mr. William Jensen, ACC Orlando, Contracting Officer, at william.r.jensen1.civ@army.mil.

Attachments

Files attached to this notice, newest first
File Type Posted
W900KK-24-R-0005 - Conformed as of Amend 0003 (24 JAN 24).pdf PDF
Attachment 03 - Cost-Pricing Workbook (Amendment 0003).xlsx XLSX spreadsheet
Attachment 16 - Solicitation Questions and Answers_W900KK-24-R-0005( ATS-3 - Amend 0003).pdf PDF
W900KK-24-R-0005 - Amend 0003 (24 JAN 24).pdf PDF
Attachment 07 - Cross Reference Matrix ATS-3 - Amend 0003.xlsx XLSX spreadsheet
Attachment 15 - Property Management Plan Checklist.pdf PDF
Attachment 08 - Property Management System (to be added at Contract Award) - Amend 0002.pdf PDF
W900KK-24-R-0005 - Amend 0002 (19 JAN 24).pdf PDF
Attachment 01 - ATS-3 SOW - Revised - Amend 0002.pdf PDF
Attachment 03 - Cost-Pricing Workbook (Amendment 0002).xlsx XLSX spreadsheet
Attachment 16 - Solicitation Questions and Answers_W900KK-24-R-0005( ATS-3 - Amend 0002).pdf PDF
W900KK-24-R-0005 - Conformed as of Amend 0002 (19 JAN 24).pdf PDF
Attachment 11 - Past Performance Questionnaire Cover Letter - Amend 0002.docx DOCX document
Attachment 07 - Cross Reference Matrix ATS-3 - Amend 0002.xlsx XLSX spreadsheet
Exhibit A - ATS-3 CDRLS- Revised - Amend 0002.pdf PDF
W900KK-24-R-0005_Amendment0001_ConformedCopy(08Jan2024).pdf PDF
W900KK-24-R-0005_Amendment0001_ModCopy(08Jan2024).pdf PDF
Attachment 01 - ATS-3 SOW.pdf PDF
Attachment 08 - Property Management System Plan (to be added at Contract Award).pdf PDF
Attachment 10 - Past Performance Questionnaire.docx DOCX document
Attachment 12 - Past Performance Contract Description.docx DOCX document
Exhibit 01 - ATS-3 CDRLS.pdf PDF
Attachment 07 - Cross Reference Matrix ATS-3.xlsx XLSX spreadsheet
Attachment 14 - Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
W900KK-24-R-0005(13Dec2023).pdf PDF
Attachment 02 - ATS-3 DD 254.pdf PDF
Attachment 03 - Cost-Pricing Workbook.xlsx XLSX spreadsheet
Attachment 09 - List of Past Performance Contracts.docx DOCX document
Attachment 11 - Past Performance Questionnaire Cover Letter.docx DOCX document
Attachment 13 - Sample Consent Letter.docx DOCX document
Attachment 04 - Small Business Subcontracting Plan (to be added at Contract Award).pdf PDF
Attachment 05 - SF1408-Pre-Award Survey.pdf PDF
Attachment 06 - DFAR 252.215-7009 Proposal Adequacy Checklist.docx DOCX document
ATS-3 Draft RFP Industry Question and Answers (Final).pdf PDF
ATS-3 RFP W900KK-24-R-0005 (Draft - 30 OCT 2023).pdf PDF
Attachment 04 - Small Business Subcontracting Plan (to be added at Contract Award).docx DOCX document
Attachment 12 - Past Performance Contract Description.docx DOCX document
Attachment 01 - ATS-3 SOW.pdf PDF
Attachment 10 - Past Performance Questionnaire.docx DOCX document
Exhibit 01 - ATS-3 CDRLs.pdf PDF
Attachment 03 - Cost-Pricing Workbook.xlsx XLSX spreadsheet
Attachment 05 - SF1408-Pre-Award Survey.pdf PDF
Attachment 08 - Property Management System Plan (to be added at Contract Award).docx DOCX document
Attachment 02 - ATS-3 DD Form 254.pdf PDF
Attachment 06 - DFAR 252.215-7009 Proposal Adequacy Checklist.docx DOCX document
Attachment 07 - Cross Reference Matrix ATS-3.xlsx XLSX spreadsheet
Attachment 09 - List of Past Performance Contracts.docx DOCX document
Attachment 11 - Past Performance Questionnaire Cover Letter.docx DOCX document
Attachment 13 - Sample Consent Letter.docx DOCX document
Show all 49

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Aerial Target Systems 3 (ATS-3) Latest Award Notice
Aerial Target Systems 3 (ATS-3) Award Notice
Aerial Target Systems 3 (ATS-3) Award Notice
Aerial Target Systems 3 - Formal Solicitation This notice · Latest pre-solicitation Pre-Solicitation
Aerial Target Systems 3 Original Pre-Solicitation

And 2 more award notices.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity