Exhibit 01 - ATS-3 CDRLs.pdf
PDF 2 MB Posted
- Attached to
- Aerial Target Systems 3 - Formal Solicitation Federal contract opportunity
- Solicitation number
- W900KK-24-R-0005
About this file
This document outlines controlled unclassified information requirements for a federal contract solicitation for aerial target systems. The solicitation will be issued by the Department of the Army Materiel Command Contracting Command Orlando Contracting Center. The solicitation number is W900KK-24-R-0005 and is for engineering, logistical, and technical support services related to aerial target systems. Required deliverables include system safety reports, engineering change proposals, test plans, and status reports. Delivery due dates and government approval timelines are specified. The Threat Systems Management Office will control distribution of the information, which is categorized as controlled technical information.
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
ATTENTION
Use this space to indicate categories, limited dissemination controls, special instructions, points of contact, etc., if needed.
ATTENTION
All individuals handling this information are required to protect it from unauthorized disclosure.
Handling, storage, reproduction, and disposition of the attached document(s) must be in accordance with 32 CFR Part 2002 and applicable agency policy.
Access to and dissemination of Controlled Unclassified Information shall be allowed as necessary and permissible to any individual(s), organization(s), or grouping(s) of users, provided such access or dissemination is consistent with or in furtherance of a Lawful Government Purpose and in a manner consistent with applicable law, regulations, and Government-wide policies.
Standard Form 901 (11-18) Prescribed by GSA/ISOO | 32 CFR 2002
CUI
Aerial Target Systems 3
A001
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
A
System Safety Hazard Analysis Report (SSHAR)
DI-SAFT-80101C SOW Para 6.4.2
Contractor's format acceptable.
Blocks 8, 12, & 13: Initial report is due 45 days after contract award. Government approval/disapproval within 30 days after receipt. If disapproved, the contractor shall resubmit within 30 days after receipt of the Government comments.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023). Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI-CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
A
X-SAFT
LT
N/A
10/25/2023 10/25/2023
A002
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
A
Safety Assessment Report (SAR)
DI-SAFT-80102C SOW Para 6.4.1
Contractor's format acceptable.
Blocks 8, 12, & 13: SAR reports on modifications which affect the inherent safety of the systems shall be prepared as required by applicable Sub-ESM. Government approval/disapproval within 30 days after receipt. If disapproved, the contractor shall resubmit within 30 days after receipt of the Government comments. The contractor may submit revisions to existing documents in lieu of developing new documents.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023). Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI-CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
A
X-SAFT
LT
10/25/2023 10/25/202310/25/2023 10/25/2023
A003
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
A
Health Hazard Assessment Report (HHAR)
DI-SAFT-80106C SOW Para 6.4.3
Contractor's format acceptable.
Blocks 8, 12, & 13: Report shall be delivered 45 days after contract award. Government approval/disapproval within 30 days DAR. If disapproved, resubmittals within 30 days.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
A
X-SAFT
LT
A004
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
A
Status Report
DI-MGMT-80368A SOW Para 15
Contractor's format acceptable.
Blocks 10, 12, & 13: Initial report is due 45 days after contract award. Government approval/disapproval within 30 days after receipt. If disapproved, the contractor shall resubmit within 30 days after receipt of the Government comments.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS REQ
A
X-MGMT
LT
A005
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
A
Technical Report – Study/Services
DI-MISC-80508B SOW Para 3.4.1, 7.1, 9.2.1.1, 9.2.1.2, 13
Contractor Format acceptable.
Blocks 8, 10, 12, & 13: Report is due as designated in statement of work (SOW). Government review/comment period will be 60 days. Resubmission is due 15 days after receipt of Government comments.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS REQ
A
X-MISC
LT
A006
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
A
Test Plan
DI-NDTI-80566A SOW Para 4.4
Contractor's format acceptable.
Blocks 10, 12, & 13: Submission is due NL T 60 days prior to the test and all other submissions will be directed by each Sub-ESM. Government approval/disapproval within 30 days after disapproved, the contractor shall resubmit within 30 the Government comments. If disapproved, the contractor shall resubmit within 30 days after receipt of the Government comments.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
Block 16
A
LT
N/A
X-NDTI
A007
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
A
Engineering Change Proposal (ECP)
DI-SESS-80639E SOW Para 8.6
Blocks 8, 10, 12, & 13: As required to document the product baseline. Submit ECP for review as generated.
Government approval/disapproval within 60 days after receipt. If disapproved, contractor resubmittals with 30
DAR.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
A
X
LT
A008
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
A
Notice of Revision (NOR)
DI-SESS-80642E SOW Para 8.6
Blocks 8, 10, 12, & 13: As required to document the product baseline. Submit NLT 30 days after generation.
Government approval/disapproval within 30 days after receipt. If disapproved, contractor resubmittals with 30
DAR.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
A
X
LT
A009
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
A
Test/Inspection Report
DI-NDTI-80809B NOT 2 SOW Para 4.4
Contractor's format acceptable.
Blocks 8, 10, 12, & 13: Reports shall be submitted within 30 days of completion of testing. Government approval/disapproval within 20 days of receipt.
Resubmittals within 14 days, if required.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
Block 16
A
X-NDTI
LT
A010
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-SESS-80858D SOW Para 8.1
Contractor's format acceptable.
Blocks 8, 10, 12, & 13: Plan shall be submitted 60 days after contract award. Government approval/disapproval within 30 DAR. If disapproved, contractor resubmittals within 30 DAR.
The contractor may submit revisions to existing documents in lieu of developing new documents.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023). Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI-CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
Supplier Configuration Management Plan
A
X-SESS
LT
A011
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-MISC-80711A SOW Para 9.1
Contractor's format acceptable.
Blocks 8, 10, 12, & 13: As required to document the Cybersecurity Artifacts. Submit NLT 30 days after generation. Government approval/disapproval within 30 days after receipt. If disapproved, contractor resubmittals with 30 DAR.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
Scientific and Technical Reports
A
X-MISC
LT
A012
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-SESS-81000F SOW Para 8.4
Blocks 8, 10, 12, & 13: As required to document the product baseline or ECP. Government approval/disapproval period will be 30 days.
Resubmissions are due 15 days after Government review, if required. Updates required if document is modified.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
Product Drawings/Models and Associated Lists
A
X
DD
A013
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-SESS-81001E NOT 1 SOW Para 8.4
Contractor's format acceptable.
Block 8, 12, & 13: As required to document the product baseline. To be provided as part of the product baseline or ECP. *DD 250 required when originals are delivered.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
Conceptual Design Drawings/Models
N/A
X
LT
A014
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-SESS-81002F NOT 1 SOW Para 8.4
Contractor's format acceptable.
Block 8, 12, & 13: As required to document the product baseline. To be provided as part of the product baseline or ECP. *DD 250 required when originals are delivered.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
Developmental Design Drawings/ Models and Associated Lists
N/A
X
LT
A015
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-SESS-81003F SOW Para 8.4
Contractor's format acceptable.
Block 8, 12, & 13: As required to document the product baseline. To be provided as part of the product baseline or ECP. *DD 250 required when originals are delivered.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
Commercial Drawings/Models and Associated Lists
N/A
X
LT
A016
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-SESS-81004F SOW Para 8.4
Contractor's format acceptable.
Block 8, 12, & 13: As required to document the product baseline. To be provided as part of the product baseline or ECP. *DD 250 required when originals are delivered.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
Special Inspection Equipment (SIE) Drawings/Models and Associated Lists
N/A
X
LT
A017
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-SESS-81248B SOW Para 8.4
Contractor's format acceptable.
Block 12 & 13: As required to document the product baseline. To be provided as part of the product baseline or ECP. *DD 250 required when originals are delivered.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS REQ
Interface Control Document (ICD)
N/A
X
LT
A018
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-MISC-81397D SOW Para 5.1
Blocks 8, 10, 12, & 13: Initial report or update of existing report is due 45 days after contract award. Government approval/disapproval period will be 30 days.
Resubmission is due 15 days after Government review.
Plan is to updated continuously throughout the contract period, as required, but at least annually.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
Hazardous Material Management Program (MHHP) Report
A
X-MISC
LT
A019
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-MGMT-81398D SOW Para 5.1
Blocks 8, 10, 12, & 13: Initial report or update of existing report is due 45 days after contract award. Government approval/disapproval period will be 30 days.
Resubmission is due 15 days after Government review.
Plan is to updated continuously throughout the contract period, as required, but at least annually.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
Hazardous Material Management Program (MHHP) Plan
A
X-MGMT
LT
A020
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-MGMT-81453B SOW Para 13.2
Contractor's format acceptable.
Blocks 12 & 13: Reproduction of the data shall be provided within 1 day after the request of the government.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS REQ
Data Accession List (DAL)
N/A
X-MGMT
LT
A021
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-SAFT-81563 NOT 2 SOW Para 6.2.2
Contractor Format acceptable.
Blocks 10, 12, & 13: Initial report shall be made immediately by email or telephone to SFAE-STRI-CT2- S. A written report shall follow and is due NLT 30 days after the accident/incident.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS REQ
Accident/Incident Report
A
X-SAFT
DD
A022
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-SAFT-81626 SOW Para 6.2
Blocks 8, 10, 12, & 13: Initial plan or update of existing plan is due 45 days after contract award. Government approval/comment period will be 30 days. Resubmission is due 15 days after Government review. Plan is to updated continuously throughout the contract period, as required.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
System Safety Program Plan (SSPP)
A
X-SAFT
LT
A023
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-SDMP-81748 NOT 1 SOW Para 4.2
Contractor's format acceptable.
Blocks 8, 10, 12, & 13: Parts Management Plan shall be delivered within 30 days after contract award.
Government approval/disapproval within 30 DAR. If disapproved, contractor resubmittals within 30 DAR. The contractor may submit revisions to existing documents in lieu of developing new documents.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS REQ
Parts Management Plan
A
LT
N/A
X-SDMP
A024
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
A
D See Blk 16 See Block 16
See Block 16
DI-QCIC-81794A SOW Para 4.1
Contractor Format acceptable.
Blocks 8, 10, 12, & 13: Initial plan is due 60 days after contract award. Government approval/disapproval will be 60 days.
Resubmission is due 30 days after Government review. Plan is to updated continuously throughout the contract period, as changes/updates occur. The contractor may submit revisions to existing documents in lieu of developing new documents.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023). Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI-CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
Quality Assurance Program Plan (QAPP)
A
LT
N/A
X-QCIC
B001
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
B
Operations Security (OPSEC) Plan
DI-MGMT-80934C NOT 1 SOW Para 7.6.9
Blocks 8, 10, 12, & 13: Operations Security (OPSEC) Plan shall be delivered within 90 days of task order award. Government approval/disapproval with 30 DAR.
If disapproved, contractor resubmittals within 30 DAR.
The contractor may submit revisions to existing documents in lieu of developing new documents.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
Block 16
A
X-MGMT
N/A
DD
B002
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
B
Configuration Audit Summary Report
DI-SESS-81022E SOW Para 8.8
Contractor's format acceptable.
Blocks 8, 10, 12, & 13: Report due NL T 30 days after audit. Government approval/disapproval within 30 DAR.
If disapproved, contractor resubmittals within 30 DAR.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS REQ
A N/A
LT
X-SESS
B003
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
B
Report, Record of Meeting/Minutes
DI-ADMN-81505 SOW Para 12
Contractor Format acceptable.
Blocks 10, 12, & 13: A record of meeting minutes shall be delivered NLT 7 days after meeting.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS GEN
N/A
X-ADMN
N/A
LT
B004
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
B
Configuration Audit Plan
DI-SESS-81646C SOW Para 8.7
Contractor's format acceptable.
Blocks 8, 12, & 13: Audit plan shall be delivered 60 days after contract award. Government approval/disapproval within 30 days after receipt. If disapproved, contractor resubmittals within 30 days after receipt. The contractor may submit revisions to existing documents, in lieu of developing new documents.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS REQ
A N/A
LT
X-SESS
B005
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
B
Contractor's Progress, Status and Management Report
DI-MGMT-81928A NOT 1 SOW Para 13.1
Contractor format acceptable.
Blocks 8, 10, 11, 12, & 13:
Subsequent report due 15 days after end of Month. If more than one engineering, logistical and technical support task is active during a reporting period, the report shall address each task separately.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS REQ
A
X-MGMT
See Block 16
B006
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
B
DOD Risk Management Framework (RMF) Package Deliverables
DI-MGMT-82001A SOW Para 9.1, 9.1.1
Contractor format acceptable.
Blocks 8, 12, & 13: As required to produce the Risk Management Framework (RMF).
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023).
Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI- CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
AS REQ
A
X-MGMT
N/A
B007
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S 1 11
1 11
D See Blk 16 See Block 16
See Block 16
B
Government Furnished Property Inventory and Forecasting Report
DI-MGMT-81947B NOT 1 SOW Para 11.1
Contractor Acquired Property (CAP) shall be delivered electronically in a spreadsheet using Microsoft Office Excel.
Blocks 8, 10, 12, & 13: Initial submission will be 30 days from contract award.
Block 13: Subsequent submissions due every 30 days from previous submission. Final submission will be within 90 days of contract completion/termination and shall include recommendations for disposition.
The CAP Report shall consist of the following data elements at a minimum: Detailed Purchase Order which describes Government Property classification (i.e.,Equipment, Material, Special Test Equipment and Special Tooling) Name, Description, Quantity received, balance-on-hand, Unit Acquisition Cost, serial number, Unit of Measure, Accountable Contract Number, and Location.
Block 9:
Controlled by: US Army Controlled by: Threat Systems Management Office CUI Category: CTI, Distribution Statement D POC: Christopher McCravy, 256-957-1438
Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only (Controlled Technical Information, 20 March 2023). Other requests for this document shall be referred to Threat Systems Management Office, ATTN SFAE-STRI-CT2-S, Bldg. 4497, Redstone Arsenal, 35898.
Block 14: It is required that the information be delivered in either Microsoft Office 2016 or later via an electronic data interchange (EDI) media via e-mail in Microsoft Office.
Email for SFAE-STRI-CT2-S is Christopher.L.Mccravy.civ@army.mil.
*Electronic transmittal letter only:
Darsey.l.wegrzyn.civ@army.mil
MTHLY
A
X-MGMT
ASREQ
B008
SFAE-STRI-CT2-S
SFAE-STRI-CT2-S
1 11
2 22
See Block 16
See Block 16
B
Small Business Utilization Report
DI-MGMT-82041B Section G of contract
1. Block 4 (Format): The report shall be in contractor format.
2. Block 7: The contractor shall initiate a zero cost receiving report in Wide Area Work Flow (WAWF) immediately after submitting the data in accordance with Block 14. A WAWF receiving report is required for every data item submission (initial and subsequent submissions) to the Government.
3. Block 10-13: A semi-annual report shall be submitted during contract performance for the periods ending 31 March and 30 September. Reports are due 30 days after the close of each reporting period, unless otherwise specified. A summary report is also required for each contract within 30 days of contract completion. Reports are required when due, regardless of whether there has been any activity since inception of the contract or the previous reporting period.
4. Block 14: The reports shall be submitted via email to the Procuring Contracting Officer (PCO) identified in the contract.
5. The Government shall have 60 days for Acceptance or Rejection of each submission.
6. If a submission is rejected by the Government, the contractor shall address the comments, and submit an updated report within 30 days.
MTHLY
X-MGMT
ASREQ
LT
D
N/A
10/25/2023 10/25/2023
Small Business Participation
SFAE-STRI-CT2-SSFAE-STRI-CT2-S
ACC-ORL-OSBP
1 1 1
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| ATS 3 Form 1423 CDRLs_26 Jul 2023_B.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
Fillable_field:
Controlled By: Army Controlled By: Threat Systems Management Office CUI Category(ies): Procurement and Acquisition Limited Dissemination Control: FEDCON POC: Christopher McCravy, 256-957-1438 christopher.l.mccravy.civ@army.mil
| 2023-10-25T08:25:51-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:26:10-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:26:39-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:26:59-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:27:37-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:27:55-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:28:34-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:28:53-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:31:31-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:31:53-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:32:13-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:32:34-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:32:52-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:33:16-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:33:37-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:34:06-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:34:29-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:35:21-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:35:49-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:36:20-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:36:48-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:37:15-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:37:49-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:38:30-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:39:03-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:42:16-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:42:57-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:43:34-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:44:18-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:45:19-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:46:13-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-25T08:47:02-0500 | |
| JONES.BRENDA.ELLEN.1091862600 |
| 2023-10-26T13:48:11-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T13:49:28-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T13:50:36-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T13:51:44-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T13:52:57-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T13:54:13-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T13:55:29-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T13:56:53-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T13:58:16-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T13:59:47-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:01:14-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:02:43-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:04:18-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:05:58-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:07:45-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:09:38-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:13:30-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:15:35-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:17:58-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:20:21-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:28:14-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:30:43-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:33:35-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:37:05-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:39:43-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:42:24-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:45:13-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:48:19-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:52:22-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:55:29-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T14:58:43-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
| 2023-10-26T15:06:09-0500 | |
| MCCRAVY.CHRISTOPHER.LEE.1298324578 |
File details come from the government source that posted it. Updated .