A&E Services MICC FT Campbell

Closed Solicitation Posted

This opportunity was awarded. See its 3 award notices in the notice history.

Solicitation number
W91248-18-R-0008
Agency
MICC Fort Campbell Mission and Installation Contracting Command, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
541310 Architectural Services
PSC
Not on record
Place of performance
Fort Campbell KY Installation and Fort Sill OK Installation Fort Campbell, Kentucky 422223, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

Added: Jun 14, 2018 10:21 am Amendment 6 is issued on 14 June 2018 to provide a method for firms to submit responses in the instance that file sizes do not allow for conventional email delivery.


If this alternative delivery method is required, offerors shall use the Army AMRDEC SAFE at https://safe.amrdec.army.mil/safe/Welcome.aspx.


1. A CAC is not required to use this site.  When landing at the page, there is an option for "Non-CAC Users."
2. Files submitted through AMRDEC shall be sent to both bradford.a.davis.civ@mail.mil and eric.c.boston.civ@mail.mil.
3. Respondents shall select the "Require CAC for Pick-up (all recipients will need to log in with a CAC to download file(s))" option under email settings.
4. It is also recommended that respondents select the "Notify me when file(s) downloads are STARTED" and "Notify me when file(s) downloads are COMPLETED" options to ensure that the Government is in receipt of the submission.




Submission due date is June 19, 2018, 3:00 p.m. CDT.

All questions shall be submitted no later than Jun 14, 1:00 p.m. CDT.



Update #5 ·

Added: Jun 11, 2018 4:45 pm Amendment 5 is posted on 11 June 2018 to provide Questions and Answers. Attachment "W91248-18-R-0008_Amd_5_QA" is added. Additionally the following documents are attached:



1. SF330 (ARCHITECT-ENGINEER QUALIFICATIONS) (Updated expiration of 31 December 2020)


Submission due date is June 19, 2018, 3:00 p.m. CDT.


All questions shall be submitted no later than Jun 14, 1:00 p.m. CDT.

Update #4 ·

Added: Jun 01, 2018 11:32 am Amendment 4 is posted on 1 June 2018 to provide Questions and Answers.  Attachment "W91248-18-R-0008_Amd_4_QA" is added.  Additionally the following documents are attached:
1. Updated Synopsis document (W91248-18-R-0008_Synopsis_(AE_Services)_Amd_4)
2. SF330 (ARCHITECT-ENGINEER QUALIFICATIONS)





Submission due date is June 19, 2018, 3:00 p.m.


All questions shall be submitted no later than Jun 14, 1:00 p.m.



Update #3 ·

Added: May 29, 2018 2:31 pm Submission due date is exrtended to No Later Than Juen 19, 2018, 3:00 p.m.  Submissions received after this time will be viewed as late and will not be considered .


All questions shall be submitted no later than Jun 14, 1:00 p.m.

Update #2 ·

Added: May 23, 2018 3:40 pm

1.  For Factor 1, Part A, we are told to provide résumés for the listed disciplines, which we assume to include both the primary and secondary disciplines.  However, many of the secondary disciplines listed on pages 3 & 4 of 7 do not lend themselves to providing a specific résumé.  For example, the last item is “Provide scanned digital DGN or DWG copies of existing construction drawings.”  Can you please clarify which, if any, of the secondary disciplines actually require a stand-alone résumé?


1.  RESPONSE: The needed résumés for secondary disciplines are:


                                1. - Interior designer


                                2. - Landscape architect


                                3. - Surveyor


                                6. - Environmental engineer


                                10. - Geotechnical engineer


 


2.  On page 4 of 7, Factor 2, third paragraph, it states: “for each project the Firm must provide a Contractor Performance Assessment Report System (CPARS).”  Subsequently, the submission requirements at the bottom of page 6 of 7, tell us that Tab C consists of “SF330, Part I, Section F, CPARS or PPQs.”  If we do not have a sufficient number of contracts with CPARS evaluations, may we use the USACE/NAVFAC Past Performance Questionnaire (Form PPQ-0) for our Section F projects that do not have a CPARS evaluation?


2. RESPONSE: Yes, the USACE/NAVFAC Past Performance Questionnaire (Form PPQ-0) may be used.


3. On page 1 of 7, at the next to last paragraph, it states: “Work is further detailed in the PWS attached to this notice.”  We cannot locate the PWS.  Can you please provide it?


 


3. Response:  SOW is attached.


 


4. I was reviewing the SF33 requirements for the A&E Services MICC Fort Campbell opportunity, and had a couple of questions that I hope you can clarify.


 


First, for the Primary Disciplines on Page 3, you have requested the Civil Engineer have registration within the Mobile District AOR. Given the geographic locations for this contract (Fort Campbell and Fort Sill), is the Mobile District location still the desired area of registration?


 


4. RESPONSE: Please remove the reference to the Mobile District. 


 


4A. Second, under Secondary Disciplines, there are listed a number of items which seem to be more Technical Competence criteria than personnel disciplines. I am referring to the following:


 


(4) Hydrology and Hydraulics Analysis and Design


(5) Economic and Life Cycle Analysis


(11) Energy Management


(12) Architectural Color Renderings and/or Physical Models


(13) LEED building design, analysis, recommendations, registration, and certification


(14) Drawings of Existing Structures


(15) Drafting/Computer Aided Design and Drafting


(16) Provide scanned digital PDF copies of existing construction document


(17) Provide scanned digital DGN or DWG copies of existing construction drawings


 


4A. RESPONSE: Yes, these are Technical Competence (Capabilities) criteria.


 


5. Do we need to provide separate resumes for personnel to respond to these items?


 


5. RESPONSE: Separate resumes are not needed, but have each A&E firm clearly state that they can and will provide these services when needed.  The A&E firms should give some history of providing these functions.


 


6. Factor 8. Geographic Proximity


 


6. RESPONSE: Firms performing work on Fort Campbell shall have their principal office located within a 100 mile radius from Fort Campbell's main gate - Gate #4.  Firms performing work on Fort Sill shall have their principal office located within a 100 mile radius from Fort Sill's main gate.


 


The location requirement contained herein is set forth in accordance with the provisions of Public Law 92-582 Appendix “A” of the Brooks Act and FAR 36.602-1.a.5.


 


Response Time:  If a critical situation or problem arises, that is essential to the mission of DPW that the key members of the A/E involved with the project such as the DOR; design architect, and/or the design engineers including civil, structural, mechanical, and electrical, be available to meet on Fort Campbell within 150 minutes of being notified by DPW.


 


7.  Regarding Factor 1, Part A, Secondary discipline resumes:  Several of the secondary disciplines listed seem to be more tasks than positions that would require a resume for one person.  For instance “(14) Drawings of Existing Structures” and  “(16) Provide scanned digital PDF copies of existing construction document”  How should we address this?


7. RESPONSE: Several of the items listed under Secondary Disciplines should be listed Technical Competence (Capabilities) criteria (as listed below).  Separate resumes are not needed, but have each A&E firm clearly state that they can and will provide these services when needed.  The A&E firms should give some history of providing these functions.


(4)          Hydrology and Hydraulics Analysis and Design


(5)          Economic and Life Cycle Analysis


(8)          Specification and Technical Writing


(9)          Construction Quality Assurance


(11)        Energy Management


(12)        Architectural Color Renderings and/or Physical Models


(13)        LEED building design, analysis, recommendations, registration, and certification


(14)        Drawings of Existing Structures


(15)        Drafting/Computer Aided Design and Drafting


(16)        Provide scanned digital PDF copies of existing construction document


(17)        Provide scanned digital DGN or DWG copies of existing construction drawings


 


8.  Factor 2, states that a CPARS must be provided for each project.  Is a PPIRS or PPQ acceptable instead?


8. RESPONSE:  PPIRS or PPQ in acceptable.


9.  Factor 2, states that a CPARS must be provided for each project.  If the project is not a government project, what evaluation is acceptable?


9. RESPONSE: Will the A&E firms be working on non-government projects?


10. Under Factor 1 – Professional Qualifications, Part B – The last sentence within this section states, “Only the Key Personnel disciplines requested in this notice will be evaluated.” Does this refer to the nine items listed under “Primary Disciplines”? 


 


10.  RESPONSE:  Remove the statement, “Only the Key Personnel disciplines requested in this notice will be evaluated.” As this is not correct.  Primary and Secondary Personnel will be evaluated.


 


10A. If that’s the case, since the “Secondary Disciplines” will not be evaluated, do we discuss our qualifications for these roles within the Section H of the SF330?


 


10A. RESPONSE: Secondary Disciplines will be evaluated and qualifications shall be stated.


 


11. Question: Do you want personnel resumes the Primary and Secondary disciplines or just the Primary disciplines?


 


11. RESPONSE: Provide resumes for all Primary and Secondary Disciplines.  The statement, "Only the Key Personnel disciplines requested in this notice will be evaluated" is incorrect.


 


12. Factor 1, Part B (Section E, Block 19) states that projects listed on resumes should have been completed within 5 years.  Can a project be used if the resume is for a design discipline and the design portion is complete but construction is still under way?


 


12. RESPONSE: Only list completed projects per Factor 1, Part B (Section E, Block 19).

Update #1 ·

Added: May 07, 2018 4:21 pm The Mission and Installation Contracting Command (MICC) - Fort Campbell, KY is issuing this notice for the procurement of Architect and Engineering (A-E) Services in support of the Directorate of Public Works (DPW), Fort Campbell, KY.

This notice constitutes a special situation in accordance with FAR 5.205(d). Firms wishing to be considered for evaluation in response to this notice shall submit a SF 330, Architect-Engineer Qualifications, as detailed below section, Submission Requirements.

Attachments

Files attached to this notice, newest first
File Type Posted
SF_330_31_Dec_20.pdf PDF
W91248-18-R-0008_Amd_5_QA.docx DOCX document
SF330_(ARCHITECT-ENGINEER_QUALIFICATIONS).pdf PDF
W91248-18-R-0008_Amd_4_QA.docx DOCX document
W91248-18-R-0008_Synopsis_(AE_Services)_Amd_4.docx DOCX document
A&E_Services_Rev_5.docx DOCX document
W91248-18-R-0008_Synopsis_(AE_Services)_.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
A&E Services MICC FT Campbell Latest Award Notice
A&E Services MICC FT Campbell Award Notice
A&E Services MICC FT Campbell Award Notice
A&E Services MICC FT Campbell This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity