W91248-18-R-0008_Amd_5_QA.docx

DOCX document 14 KB Posted

Attached to
A&E Services MICC FT Campbell Federal contract opportunity
Solicitation number
W91248-18-R-0008
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Campbell

View the file

Other files for this federal contract opportunity

Other files attached to A&E Services MICC FT Campbell, newest first.
File Type Posted
SF_330_31_Dec_20.pdf PDF
W91248-18-R-0008_Amd_4_QA.docx DOCX document
W91248-18-R-0008_Synopsis_(AE_Services)_Amd_4.docx DOCX document
SF330_(ARCHITECT-ENGINEER_QUALIFICATIONS).pdf PDF
A&E_Services_Rev_5.docx DOCX document
W91248-18-R-0008_Synopsis_(AE_Services)_.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Question: The SF330 attachment added on June 1, is the 2013 version which expired on 11/30/2017. Is it acceptable to use the gsa.gov site version that has an expiration date of 12/31/2020?

1. Response: Contractors shall uses the Attached SF 33 that has expiration date of 12/31/2020.

2. Question: Is it acceptable to modify the form visually (color and spacing only, no content modification)?

2. Response: It is acceptable to modify the SF330 color and spacing only.

3. Question (from previous Q&A) Factor 1, Part B (Section E, Block 19) states that projects listed on resumes should have been completed within 5 years. Can a project be used if the resume is for a design discipline and the design portion is complete but construction is still under way?

Response (from previous Q&A): Only list completed projects per Factor 1, Part B (Section E, Block 19).

Example projects within Section F and Section E must be completed within 5 years for A-E design services not construction phase services. This includes:

* Design-Build RFPs

* Design-Bid-Build projects (demonstrating that design phase was complete within 5 years)

* Example: Design services: 04/17 – 03/18 Construction Service: 01/19 – 2021(estimated construction completion)

* Condition Assessments, Building Condition Reports, ISRs

3. Response: Yes. That is correct.