The Department of the Air Force Air Combat Command is seeking a contractor to conduct an acoustic study of the Atrium and Auditorium in Building 1000 at Offutt Air Force Base in Nebraska. The study will evaluate the impact of replacing the current carpet flooring with terrazzo flooring and provide mitigation proposals to reduce any resulting noise issues. The contractor must conduct acoustic studies comparing the existing carpet and proposed terrazzo flooring, and address mitigation techniques for the Auditorium's existing audio system and the Atrium's planned audio upgrade. The government will provide the current drawings and proposed audio upgrade design. The final documented study report must be delivered within 30 days of contract award.
This solicitation is unrestricted, with no set-aside designations. The government has not provided any information about potential incumbent contractors or award values. The place of performance is Offutt Air Force Base in Nebraska. The solicitation has a posted date of August 22, 2024 and a due date of September 23, 2024.
Notice text
4 versions
Update #4 · Latest ·
Amendment 1 - 9/12/24
Adding Questions and Answer Document. All Solicitations are still due by 9/22/24, 11:00 AM CST.
Amendment 2 - 9/16/24
Quote due date has been extended to 23 Sept. 2024 at 11:00 AM CST.
Amendment 3 - 9/18/24
The following Attachments have been added to the Solicitation:
-Atrium Pictures (Floor, Walls, Ceiling, Chairs) and Speaker Locations
-Auditorium Pictures (Central Conference Space, Walls, Floors)
-Auditorium Drawings
-AV System Upgrade Design and Specifications
-FL-640P Floorbox Design and Specifications
The quote due date still remains the same (23 Sept. 2024 at 11:00 AM CST).
Conduct an acoustic study of the Atrium and Auditorium of B1000, Offutt AFB NE and provide a final documented report of the study’s findings to the government. The study will be used to determine the affect of replacing the current carpet with terrazzo flooring. The study should include mitigation proposals for reducing noise in the spaces if the carpet is replaced by terrazzo.
Project includes, but not limited to the following work elements. The contractor shall conduct a study of the atrium and auditorium with two different flooring types: existing carpet and proposed terrazzo flooring. The study should include mitigation techniques that can be used in the auditorium when using the existing audio system. The Atrium study should include mitigation techniques that can be used with the proposed audio upgrade design. The Government will provide both the current drawings of the atrium and auditorium as well as the proposed atrium audio upgrade design.
Update #3 ·
Amendment 1 - 9/12/24
Adding Questions and Answer Document. All Solicitations are still due by 9/22/24, 11:00 AM CST.
Amendment 2 - 9/16/24
Quote due date has been extended to 23 Sept. 2024 at 11:00 AM CST.
Conduct an acoustic study of the Atrium and Auditorium of B1000, Offutt AFB NE and provide a final documented report of the study’s findings to the government. The study will be used to determine the affect of replacing the current carpet with terrazzo flooring. The study should include mitigation proposals for reducing noise in the spaces if the carpet is replaced by terrazzo.
Project includes, but not limited to the following work elements. The contractor shall conduct a study of the atrium and auditorium with two different flooring types: existing carpet and proposed terrazzo flooring. The study should include mitigation techniques that can be used in the auditorium when using the existing audio system. The Atrium study should include mitigation techniques that can be used with the proposed audio upgrade design. The Government will provide both the current drawings of the atrium and auditorium as well as the proposed atrium audio upgrade design.
Update #2 ·
Amendment 1 - 9/12/24
Adding Questions and Answer Document. All Solicitations are still due by 9/22/24, 11:00 AM CST.
Conduct an acoustic study of the Atrium and Auditorium of B1000, Offutt AFB NE and provide a final documented report of the study’s findings to the government. The study will be used to determine the affect of replacing the current carpet with terrazzo flooring. The study should include mitigation proposals for reducing noise in the spaces if the carpet is replaced by terrazzo.
Project includes, but not limited to the following work elements. The contractor shall conduct a study of the atrium and auditorium with two different flooring types: existing carpet and proposed terrazzo flooring. The study should include mitigation techniques that can be used in the auditorium when using the existing audio system. The Atrium study should include mitigation techniques that can be used with the proposed audio upgrade design. The Government will provide both the current drawings of the atrium and auditorium as well as the proposed atrium audio upgrade design.
Update #1 ·
Conduct an acoustic study of the Atrium and Auditorium of B1000, Offutt AFB NE and provide a final documented report of the study’s findings to the government. The study will be used to determine the affect of replacing the current carpet with terrazzo flooring. The study should include mitigation proposals for reducing noise in the spaces if the carpet is replaced by terrazzo.
Project includes, but not limited to the following work elements. The contractor shall conduct a study of the atrium and auditorium with two different flooring types: existing carpet and proposed terrazzo flooring. The study should include mitigation techniques that can be used in the auditorium when using the existing audio system. The Atrium study should include mitigation techniques that can be used with the proposed audio upgrade design. The Government will provide both the current drawings of the atrium and auditorium as well as the proposed atrium audio upgrade design.
Files
| File | Type | Posted |
|---|---|---|
| Atrium COB NPN6600 Updated Set 11 2024.pdf | ||
| Atrium 2.jpg | JPG image | |
| AMD - A240406-8X12-FL-LED REV A- NPN STRATCOM.pdf | ||
| Auditorium Drawings.pdf | ||
| Atrium Speaker Locations.pdf | ||
| Atrium 3.jpg | JPG image | |
| FSR FL-640P-8-B Specs and Drawing.pdf | ||
| Auditorium 2.jpg | JPG image | |
| Auditorium 1.jpg | JPG image | |
| Atrium 4.jpg | JPG image | |
| atrium 1.jpg | JPG image | |
| Questions and Answers Acoustic Study Final J431 WWR.docx | DOCX document | |
| Questions and Answers Acoustic Study Final J431 WWR.pdf | ||
| SOW_Atrium_Auditorium_Acoustic_Study.pdf | ||
| Solicitation FA460024Q0083 Final.pdf |
Show all 15
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Acoustic Study | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity