Acoustic Study

Closed Solicitation Posted

Solicitation number
Acoustic_Study_STRATCOM
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Offutt AFB, Nebraska 68113, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Air Combat Command is seeking a contractor to conduct an acoustic study of the Atrium and Auditorium in Building 1000 at Offutt Air Force Base in Nebraska. The study will evaluate the impact of replacing the current carpet flooring with terrazzo flooring and provide mitigation proposals to reduce any resulting noise issues. The contractor must conduct acoustic studies comparing the existing carpet and proposed terrazzo flooring, and address mitigation techniques for the Auditorium's existing audio system and the Atrium's planned audio upgrade. The government will provide the current drawings and proposed audio upgrade design. The final documented study report must be delivered within 30 days of contract award.

This solicitation is unrestricted, with no set-aside designations. The government has not provided any information about potential incumbent contractors or award values. The place of performance is Offutt Air Force Base in Nebraska. The solicitation has a posted date of August 22, 2024 and a due date of September 23, 2024.

Notice text

4 versions

Update #4 · Latest ·

Amendment 1 - 9/12/24

Adding Questions and Answer Document. All Solicitations are still due by 9/22/24, 11:00 AM CST. 

Amendment 2 - 9/16/24

Quote due date has been extended to 23 Sept. 2024 at 11:00 AM CST. 

Amendment 3 - 9/18/24 

The following Attachments have been added to the Solicitation: 

-Atrium Pictures (Floor, Walls, Ceiling, Chairs) and Speaker Locations

-Auditorium Pictures (Central Conference Space, Walls, Floors)  

-Auditorium Drawings

-AV System Upgrade Design and Specifications 

-FL-640P Floorbox Design and Specifications 

The quote due date still remains the same (23 Sept. 2024 at 11:00 AM CST).  

Conduct an acoustic study of the Atrium and Auditorium of B1000, Offutt AFB NE and provide a final documented report of the study’s findings to the government. The study will be used to determine the affect of replacing the current carpet with terrazzo flooring. The study should include mitigation proposals for reducing noise in the spaces if the carpet is replaced by terrazzo.

Project includes, but not limited to the following work elements. The contractor shall conduct a study of the atrium and auditorium with two different flooring types: existing carpet and proposed terrazzo flooring. The study should include mitigation techniques that can be used in the auditorium when using the existing audio system. The Atrium study should include mitigation techniques that can be used with the proposed audio upgrade design. The Government will provide both the current drawings of the atrium and auditorium as well as the proposed atrium audio upgrade design.

Update #3 ·

Amendment 1 - 9/12/24

Adding Questions and Answer Document. All Solicitations are still due by 9/22/24, 11:00 AM CST. 

Amendment 2 - 9/16/24

Quote due date has been extended to 23 Sept. 2024 at 11:00 AM CST.

Conduct an acoustic study of the Atrium and Auditorium of B1000, Offutt AFB NE and provide a final documented report of the study’s findings to the government. The study will be used to determine the affect of replacing the current carpet with terrazzo flooring. The study should include mitigation proposals for reducing noise in the spaces if the carpet is replaced by terrazzo.

Project includes, but not limited to the following work elements. The contractor shall conduct a study of the atrium and auditorium with two different flooring types: existing carpet and proposed terrazzo flooring. The study should include mitigation techniques that can be used in the auditorium when using the existing audio system. The Atrium study should include mitigation techniques that can be used with the proposed audio upgrade design. The Government will provide both the current drawings of the atrium and auditorium as well as the proposed atrium audio upgrade design.

Update #2 ·

Amendment 1 - 9/12/24

Adding Questions and Answer Document. All Solicitations are still due by 9/22/24, 11:00 AM CST. 

Conduct an acoustic study of the Atrium and Auditorium of B1000, Offutt AFB NE and provide a final documented report of the study’s findings to the government. The study will be used to determine the affect of replacing the current carpet with terrazzo flooring. The study should include mitigation proposals for reducing noise in the spaces if the carpet is replaced by terrazzo.

Project includes, but not limited to the following work elements. The contractor shall conduct a study of the atrium and auditorium with two different flooring types: existing carpet and proposed terrazzo flooring. The study should include mitigation techniques that can be used in the auditorium when using the existing audio system. The Atrium study should include mitigation techniques that can be used with the proposed audio upgrade design. The Government will provide both the current drawings of the atrium and auditorium as well as the proposed atrium audio upgrade design.

Update #1 ·

Conduct an acoustic study of the Atrium and Auditorium of B1000, Offutt AFB NE and provide a final documented report of the study’s findings to the government. The study will be used to determine the affect of replacing the current carpet with terrazzo flooring. The study should include mitigation proposals for reducing noise in the spaces if the carpet is replaced by terrazzo.

Project includes, but not limited to the following work elements. The contractor shall conduct a study of the atrium and auditorium with two different flooring types: existing carpet and proposed terrazzo flooring. The study should include mitigation techniques that can be used in the auditorium when using the existing audio system. The Atrium study should include mitigation techniques that can be used with the proposed audio upgrade design. The Government will provide both the current drawings of the atrium and auditorium as well as the proposed atrium audio upgrade design.

Files

File Type Posted
Atrium COB NPN6600 Updated Set 11 2024.pdf PDF
Atrium 2.jpg JPG image
AMD - A240406-8X12-FL-LED REV A- NPN STRATCOM.pdf PDF
Auditorium Drawings.pdf PDF
Atrium Speaker Locations.pdf PDF
Atrium 3.jpg JPG image
FSR FL-640P-8-B Specs and Drawing.pdf PDF
Auditorium 2.jpg JPG image
Auditorium 1.jpg JPG image
Atrium 4.jpg JPG image
atrium 1.jpg JPG image
Questions and Answers Acoustic Study Final J431 WWR.docx DOCX document
Questions and Answers Acoustic Study Final J431 WWR.pdf PDF
SOW_Atrium_Auditorium_Acoustic_Study.pdf PDF
Solicitation FA460024Q0083 Final.pdf PDF
Show all 15

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Acoustic Study Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity