673CS R1 north UPS

Closed Solicitation Posted

Solicitation number
FA500024Q0055
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Jber, Alaska 99505, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Pacific Air Forces is seeking a contractor to replace end-of-life batteries supporting the R1 North ALMR site, which provides critical communications capabilities to the Department of Defense (DoD) and state agencies at Joint Base Elmendorf-Richardson (JBER) in Alaska. The government intends to award a firm-fixed price contract for the contractor to remove and dispose of the current batteries, and provide and install 48 new sealed VRLA batteries. Additional requirements include visually inspecting the Uninterruptible Power Supply (UPS) components, performing cleaning and inspections, and providing detailed reporting on the battery replacement and UPS condition.

This is a 100% small business set-aside with a NAICS code of 811210 - Electronic and Precision Equipment Repair and Maintenance. The place of performance is Building 16322 on Dena'ina Rd at JBER, Alaska. Award will be made to the responsible contractor whose quote is the lowest price and meets the acceptability standards. Quotes are due by 6 September 2024 at 1400 Alaska Standard Time.

Notice text

3 versions

Update #3 · Latest ·

03 Sep 2024- Added Q&A for vendors to ba able to complete their quotes

20 Aug 24 - Added a wiring diagram and investigation report with battery information

The Government intends to Replace end-of-life batteries supporting R1 North ALMR site. R1 North provides line of sight communications capabilities to DOD and state agencies supporting JBER and Anchorage. Services supported include emergency services, base security, range control and base operations. Currently if power is lost services provided could be interrupted and equipment damaged.

The government intends to establish a firm-fixed price contract for the following:


The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and provide one time service of onsite Eltek Uninterruptible Power Supply (UPS). These services shall include any equipment, wiring, or infrastructure to ensure the Contractor's proposed solution is compatible with the Government's current infrastructure without additional Government expense. The Contractor shall follow all Federal Communications Commission (FCC), Public Utility Commission (PUC), Department of Defense (DoD), AF, and industry standards for this requirement.


1.2 SPECIFIC REQUIREMENTS: Listed below is a synopsis, please see PWS for full requirements


1. New Batteries
a. Remove and dispose of current batteries per EPA standards.
b. Provide and install 48 sealed VRLA batteries, utilizing proper torque values (where applicable).


2. Visually inspect conditions and appearance of the following:
a. Connection terminals inter cell/battery connectors, cables and associated hardware.
b. Cell/battery covers, containers, and post seals.
c. Battery racks or cabinets and associated components and hardware.
d. Cell/battery jar or cover, noting any excessive distortion.


3. Perform cleaning of all accessible surfaces as required.


4. Conduct the following Inspections:
a. Inspect all printed circuit board connections for cleanliness, swab contacts if necessary.
b. Inspect all power connections for signs of overheating
c. Inspect all subassemblies, bridges and legs for signs of component defects or stress
d. Inspect all DC capacitors for signs of leakage
e. Inspect all AC capacitors for signs of leakage
f. Inspect and inventory all customer-owned spare parts
g. Inspect for, and perform as required, any open engineering changes


5. Reporting of Battery Update Visit:
a. The technician(s) will issue the customer a report summarizing the work that was performed, condition of the battery and identifying any critical issues before leaving the customer's site.


6. A Field Activity Report containing observations, conditions, and recommendations will be sent to the customer within 5 business days. The field report shall consist of both manufacture and actual parameters for the following areas plus actual service performed:


a. Internal Operating Parameters
i. DC Ground Detection Offset (if applicable)
ii. Inverter leg current average balance (if applicable)
iii. Output filter current average phase balance
iv. Rectifier bridge current average leg balance
v. AC Protection settings are checked
vi. DC Protection settings are checked
vii. Input and Output Frequency and Voltage Bandwidth settings are checked
viii. Verify DC filter capacitance
ix. Verify AC tank and trap filter capacitance
x. Power Supply voltages and waveforms
xi. Update UPS firmware as necessary


b. External Operating Parameters
i. System Input Voltages (all phases)
ii. System Input Currents (all phases)
iii. DC Charging Voltages (float and equalize), record settings, adjust to nominal
iv. Rectifier phase on and walk up Scope of Work
v. Inverter phase on and walk up
vi. Adjust all panel meters to measured values
vii. System Bypass Voltages (all phases)
viii. Manual and UV Transfer Testing, verify uninterrupted transfer waveform (if applicable)


c. Outage simulation, and battery capability testing, and verify charger current limit. Environmental Parameters
i. UPS area ambient temperature and condition of ventilating equipment
ii. General Cleanliness of UPS Power Module
iii. General Cleanliness of UPS area
iv. Replace air filters as applicable and necessary (parts if required are included at no charge under service agreements with full parts coverage, otherwise billable)
v. Clean outside of UPS including control panel/CRT screen

Update #2 ·

20 Aug 24 - Added a wiring diagram and investigation report with battery information

The Government intends to Replace end-of-life batteries supporting R1 North ALMR site. R1 North provides line of sight communications capabilities to DOD and state agencies supporting JBER and Anchorage. Services supported include emergency services, base security, range control and base operations. Currently if power is lost services provided could be interrupted and equipment damaged.

The government intends to establish a firm-fixed price contract for the following:


The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and provide one time service of onsite Eltek Uninterruptible Power Supply (UPS). These services shall include any equipment, wiring, or infrastructure to ensure the Contractor's proposed solution is compatible with the Government's current infrastructure without additional Government expense. The Contractor shall follow all Federal Communications Commission (FCC), Public Utility Commission (PUC), Department of Defense (DoD), AF, and industry standards for this requirement.


1.2 SPECIFIC REQUIREMENTS: Listed below is a synopsis, please see PWS for full requirements


1. New Batteries
a. Remove and dispose of current batteries per EPA standards.
b. Provide and install 48 sealed VRLA batteries, utilizing proper torque values (where applicable).


2. Visually inspect conditions and appearance of the following:
a. Connection terminals inter cell/battery connectors, cables and associated hardware.
b. Cell/battery covers, containers, and post seals.
c. Battery racks or cabinets and associated components and hardware.
d. Cell/battery jar or cover, noting any excessive distortion.


3. Perform cleaning of all accessible surfaces as required.


4. Conduct the following Inspections:
a. Inspect all printed circuit board connections for cleanliness, swab contacts if necessary.
b. Inspect all power connections for signs of overheating
c. Inspect all subassemblies, bridges and legs for signs of component defects or stress
d. Inspect all DC capacitors for signs of leakage
e. Inspect all AC capacitors for signs of leakage
f. Inspect and inventory all customer-owned spare parts
g. Inspect for, and perform as required, any open engineering changes


5. Reporting of Battery Update Visit:
a. The technician(s) will issue the customer a report summarizing the work that was performed, condition of the battery and identifying any critical issues before leaving the customer's site.


6. A Field Activity Report containing observations, conditions, and recommendations will be sent to the customer within 5 business days. The field report shall consist of both manufacture and actual parameters for the following areas plus actual service performed:


a. Internal Operating Parameters
i. DC Ground Detection Offset (if applicable)
ii. Inverter leg current average balance (if applicable)
iii. Output filter current average phase balance
iv. Rectifier bridge current average leg balance
v. AC Protection settings are checked
vi. DC Protection settings are checked
vii. Input and Output Frequency and Voltage Bandwidth settings are checked
viii. Verify DC filter capacitance
ix. Verify AC tank and trap filter capacitance
x. Power Supply voltages and waveforms
xi. Update UPS firmware as necessary


b. External Operating Parameters
i. System Input Voltages (all phases)
ii. System Input Currents (all phases)
iii. DC Charging Voltages (float and equalize), record settings, adjust to nominal
iv. Rectifier phase on and walk up Scope of Work
v. Inverter phase on and walk up
vi. Adjust all panel meters to measured values
vii. System Bypass Voltages (all phases)
viii. Manual and UV Transfer Testing, verify uninterrupted transfer waveform (if applicable)


c. Outage simulation, and battery capability testing, and verify charger current limit. Environmental Parameters
i. UPS area ambient temperature and condition of ventilating equipment
ii. General Cleanliness of UPS Power Module
iii. General Cleanliness of UPS area
iv. Replace air filters as applicable and necessary (parts if required are included at no charge under service agreements with full parts coverage, otherwise billable)
v. Clean outside of UPS including control panel/CRT screen

Update #1 ·

The Government intends to Replace end-of-life batteries supporting R1 North ALMR site. R1 North provides line of sight communications capabilities to DOD and state agencies supporting JBER and Anchorage. Services supported include emergency services, base security, range control and base operations. Currently if power is lost services provided could be interrupted and equipment damaged.

The government intends to establish a firm-fixed price contract for the following:


The contractor shall provide all management, tools, supplies, equipment, and labor necessary to repair and provide one time service of onsite Eltek Uninterruptible Power Supply (UPS). These services shall include any equipment, wiring, or infrastructure to ensure the Contractor's proposed solution is compatible with the Government's current infrastructure without additional Government expense. The Contractor shall follow all Federal Communications Commission (FCC), Public Utility Commission (PUC), Department of Defense (DoD), AF, and industry standards for this requirement.


1.2 SPECIFIC REQUIREMENTS: Listed below is a synopsis, please see PWS for full requirements


1. New Batteries
a. Remove and dispose of current batteries per EPA standards.
b. Provide and install 48 sealed VRLA batteries, utilizing proper torque values (where applicable).


2. Visually inspect conditions and appearance of the following:
a. Connection terminals inter cell/battery connectors, cables and associated hardware.
b. Cell/battery covers, containers, and post seals.
c. Battery racks or cabinets and associated components and hardware.
d. Cell/battery jar or cover, noting any excessive distortion.


3. Perform cleaning of all accessible surfaces as required.


4. Conduct the following Inspections:
a. Inspect all printed circuit board connections for cleanliness, swab contacts if necessary.
b. Inspect all power connections for signs of overheating
c. Inspect all subassemblies, bridges and legs for signs of component defects or stress
d. Inspect all DC capacitors for signs of leakage
e. Inspect all AC capacitors for signs of leakage
f. Inspect and inventory all customer-owned spare parts
g. Inspect for, and perform as required, any open engineering changes


5. Reporting of Battery Update Visit:
a. The technician(s) will issue the customer a report summarizing the work that was performed, condition of the battery and identifying any critical issues before leaving the customer's site.


6. A Field Activity Report containing observations, conditions, and recommendations will be sent to the customer within 5 business days. The field report shall consist of both manufacture and actual parameters for the following areas plus actual service performed:


a. Internal Operating Parameters
i. DC Ground Detection Offset (if applicable)
ii. Inverter leg current average balance (if applicable)
iii. Output filter current average phase balance
iv. Rectifier bridge current average leg balance
v. AC Protection settings are checked
vi. DC Protection settings are checked
vii. Input and Output Frequency and Voltage Bandwidth settings are checked
viii. Verify DC filter capacitance
ix. Verify AC tank and trap filter capacitance
x. Power Supply voltages and waveforms
xi. Update UPS firmware as necessary


b. External Operating Parameters
i. System Input Voltages (all phases)
ii. System Input Currents (all phases)
iii. DC Charging Voltages (float and equalize), record settings, adjust to nominal
iv. Rectifier phase on and walk up Scope of Work
v. Inverter phase on and walk up
vi. Adjust all panel meters to measured values
vii. System Bypass Voltages (all phases)
viii. Manual and UV Transfer Testing, verify uninterrupted transfer waveform (if applicable)


c. Outage simulation, and battery capability testing, and verify charger current limit. Environmental Parameters
i. UPS area ambient temperature and condition of ventilating equipment
ii. General Cleanliness of UPS Power Module
iii. General Cleanliness of UPS area
iv. Replace air filters as applicable and necessary (parts if required are included at no charge under service agreements with full parts coverage, otherwise billable)
v. Clean outside of UPS including control panel/CRT screen

Files

File Type Posted
Q and A MFR.pdf PDF
Investigation R1north_UPS_2024-07-02.pdf PDF
Wiring Diagram LB1738024C1-02.pdf PDF
Combo- Solicittion.pdf PDF
R1 North UPS mx PWS.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
FTG247 Replace UPS at IDT1, Fort Greely, Alaska Fort Greely, Alaska 99731, United States · NAICS 237130 ENDIST Alaska Total Small Business
6135--UPS Battery Replacement VA San Diego Healthcare System San Diego CA 92161 · NAICS 335910 Veterans Integrated Service Network 22 No set-aside
Battery NAICS 335910 Naval Supply Systems Command No set-aside
Battery, storage NAICS 335910 Land and Maritime Total Small Business
Battery power suppl NAICS 335999 Land and Maritime No set-aside