Wiring Diagram LB1738024C1-02.pdf
PDF 145 KB Posted
- Attached to
- 673CS R1 NORTH UPS
- Solicitation number
- FA500024Q0055
About this file
This document is a Performance Work Statement (PWS) for a federal contract opportunity to replace end-of-life batteries supporting the R1 North ALMR site, which provides line of sight communications capabilities to the Department of Defense (DoD) and state agencies.
The key requirements include: 1) Removing and disposing of current batteries per EPA standards, and providing and installing 48 sealed VRLA batteries; 2) Visually inspecting battery connections, covers, racks, and other components; 3) Performing cleaning and inspections of the UPS system; and 4) Providing detailed reporting on the battery update, including internal/external operating parameters and environmental conditions. The contract is a firm-fixed price requirement, and the agency is the Department of the Air Force Pacific Air Forces. The contractor must follow all relevant FCC, PUC, DoD, and industry standards. No award date, pricing terms, or set asides are specified in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A MFR.pdf | ||
| Investigation R1north_UPS_2024-07-02.pdf | ||
| Combo- Solicittion.pdf | ||
| R1 North UPS mx PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .