656-12-222 Replace Windows Bldg 4, 8 & 9
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 36C26326B0035
- Agency
- Veterans Integrated Service Network 23 Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business Sole Source
Opportunity facts
- NAICS code
- 238350 Finish Carpentry Contractors
- PSC
- Y1AA Construction Of Office Buildings
- Place of performance
- Saint Cloud, Minnesota 56303, United States
- Points of contact
-
- Dwayne Brauch dwayne.brauch@va.gov (651) 293-3039
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Integrated Service Network 23 intends to solicit a Service-Disabled Veteran-Owned Small Business sole-source contract for complete window replacement in Buildings 4, 8, and 9 at the St. Cloud VA Health Care System in St. Cloud, Minnesota, with a response deadline of June 8, 2026.
This is a 100% SDVOSB set-aside requiring bidders to be registered and certified in the Veteran Small Business Certification (VetCert) program. The work scope includes removal and safe abatement of lead and asbestos-containing materials from existing wood windows, installation of new frames, sashes, screens, and storm windows, and associated wall patching, painting, ceiling restoration, and trim work in occupied buildings with proper construction barriers. Anticipated trades include general contractors, demolition contractors, abatement contractors, and painting contractors. NAICS 238350 (Finish Carpentry Contractors) applies, with a small business size standard of $19 million. The contract will be awarded as a single firm fixed-price Invitation for Bid. The project magnitude falls between $5 million and $10 million, with a period of performance of 415 calendar days from Notice to Proceed and standard working hours Monday through Friday, 8:00 AM to 4:30 PM, excluding Federal Holidays. Anticipated award date is within 90 calendar days from bid opening. Solicitation documents will be available on SAM.gov. Direct questions in writing to Contracting Officer Dwayne Brauch at dwayne.brauch@va.gov.
Notice text
The Contractor shall furnish all labor, materials, tools and equipment required to repair, remove, replace and completely refurbish all windows in Buildings 4,8 and 9. The contractor shall remove the existing internal and external window trim and wall finishes in order to successfully gain access to and cut out the existing wood windows. Incorporated into the demolition of the windows will be the safe removal of both lead and asbestos containing material as guided by the local and national rules and regulations of lead and asbestos remediation. Additionally, the contractor will be responsible for the complete and satisfactory installation of the new window frames and sashes, screens and storm windows. The window installation shall include the patching and painting of walls, ceiling installation and restoration, trim and millwork installation, and repair of all damaged items in place. This work will be completed in an occupied building; all construction activities shall be completed behind proper construction barriers as described in the specifications. The contractor shall return the worksite to the Veterans Affairs Health Care System after the work is completed, and all of the required work is satisfactorily completed and signed off by the assigned Contracting Officer’s Representative. Refer to the contract specifications and drawings for details All work completed in accordance with the specifications and contract drawings.
Work includes, but is not limited to:
-
-
- Demolition:
- Contractor shall remove from the VA site and dispose of all equipment and materials not scheduled to be reused.
- Contractor shall remove Lead and Asbestos materials associated with windows
- Contractor trades anticipated:
-
- General contractor
- General laborer
- Demolition contractor
- Abatement contractor
- Painting contractor
No VA furnished equipment
New construction consists of but is not limited to windows, doors, general construction and abatement.
Contractor is responsible for the movement, adjustment and storage of all furnishings disturbed during construction.
Contract working hours are 8 am to 4:30 pm Monday through Friday, excluding Federal Holidays. Weekend and night work may be necessary in sensitive areas and shall be approved by the COR.
Phasing will be as listed on the contract documents
The period of performance for this work is four hundred fifteen (415) calendar days from issuance of Notice to Proceed (NTP). There is a 60-day window after the Post Award Conference and prior to the Notice to Proceed for badging-related submission and processing. No additional expense will be allowed regarding badging items henceforth.
Attachments
| File | Type | Posted |
|---|---|---|
| 36C26326B0035.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| 656-12-222 Replace Windows Bldg 4, 8 & 9 | Award Notice | |
| 656-12-222 Replace Windows Bldg 4, 8 & 9 | Solicitation | |
| 656-12-222 Replace Windows Bldg 4, 8 & 9 | Solicitation | |
| 656-12-222 Replace Windows Bldg 4, 8 & 9 | Solicitation | |
| 656-12-222 Replace Windows Bldg 4, 8 & 9 | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity