6530--Ceiling Mounted Patient Lifts 5-North & 5-West

Closed Solicitation Posted

Solicitation number
36C24825Q0622
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
13000 Bruce B. Downs Blvd, Tampa FL 33612

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Health Administration is seeking a turn-key contractor to replace ceiling-mounted patient lifts at James A. Haley Veterans Hospital in Tampa, Florida, specifically for the 5-North and 5-West inpatient units. The solicitation requires installation of new patient lift systems with specific technical requirements, including a minimum lifting capacity of 507 pounds, smooth operational characteristics, and patient weighing capabilities in both kilograms and pounds. Contractors must provide comprehensive services including site evaluation, design, labor, materials, equipment, and installation, with a strong recommendation for thorough pre-proposal site assessment. The evaluation appears to focus primarily on brand name and pricing, with the solicitation (ID: 36C24825Q0622) issued on April 16, 2025, and quotes due by April 23, 2025, at 10:00 AM Eastern Time. The contract specialist for this opportunity is Quentin Ford, who can be contacted at Quentin.Ford@va.gov or 813-861-5858.

The solicitation is specifically set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a product service code of 6530 and NAICS code 339113 for Surgical Appliance and Supplies Manufacturing. The procurement involves installing 19 Liko Ceiling Mounted Patient Lift Motor Packages, 19 LikoScale T400 units, and 8 Liko Ceiling Mount Patient Lift Straight Rail Systems, totaling 35 units with a delivery and installation timeline between 14-120 days after order receipt. The place of performance is 13000 Bruce B Downs Blvd, Tampa, FL 33612, where contractors must ensure new support components are connected directly to building structural elements and navigate existing utility systems. While specific award value is not explicitly stated, the comprehensive nature of the project suggests a significant investment in upgrading patient care infrastructure. Contractors must be certified/registered distributors authorized by the original equipment manufacturer and provide comprehensive documentation complying with relevant technical industry standards.

Notice text

2 versions

Update #2 · Latest ·

STATEMENT OF NEED

Ceiling-Mounted Patient Lifts Replacement for 5-North and 5-West Inpatient Units

GENERAL: James A. Haley Veterans Hospital, 13000 Bruce B. Downs Blvd, Tampa, Florida 33612, has a requirement for ceiling-mounted patient lifts in two inpatient units to replace outdated patient lifts. The patient lifts will be used for patient transfers and repositioning in bed and will be installed in existing rail systems.

BACKGROUND: James A. Haley VA Hospital is soliciting a contractor to furnish all design, site evaluation, labor, materials, equipment, and installation of ceiling-mounted patient care lifts in the existing inpatient units: 5-North and 5-West. Numerous utility systems occupy this space and must be considered when installing new equipment above the ceiling and in the existing patient lift support rails. It is strongly recommended that the contractor perform a thorough site evaluation prior to submitting a proposal.

SCOPE: The Contractor shall provide a technical and cost proposal for turn-key services to install ceiling-mounted patient lifts in accordance with this scope of work. This cost proposal shall be for providing new installation and removal/de-installation of LIKO Brand Name Only patient lift units including but not limited to: lift devices, support material, gate transition pieces and all other associated components required for complete, functional installation for ceiling lift in with scale and hand-control based charged ceiling lift systems. This proposal shall also be for installation of the lift systems including but not limited to any required plans, engineering details and documents, tools, labor, testing, training, cleaning supplies, etc. All new lift systems must have a lifting capacity of no less than 507 lbs. Operation of the system must be smooth with no fast or jerky starts and stops. Operation of the system must allow for adequate lifting height allowing for transfer of patient from bed. All lift systems must have the availability to weigh a patient in kilograms and pounds. Existing hangers, Unistrut, or other support components shall not be utilized to support the lift tracks. If additional supports are needed, new supports must be connected directly to building structural components.

Update #1 ·

Ceiling-Mounted Patient Lifts Replacement for 5-North and 5-West Inpatient Units

GENERAL: James A. Haley Veterans Hospital, 13000 Bruce B. Downs Blvd, Tampa, Florida 33612, has a requirement for ceiling-mounted patient lifts in two inpatient units to replace outdated patient lifts. The patient lifts will be used for patient transfers and repositioning in bed and will be installed in existing rail systems.

BACKGROUND: James A. Haley VA Hospital is soliciting a contractor to furnish all design, site evaluation, labor, materials, equipment, and installation of ceiling-mounted patient care lifts in the existing inpatient units: 5-North and 5-West. Numerous utility systems occupy this space and must be considered when installing new equipment above the ceiling and in the existing patient lift support rails. It is strongly recommended that the contractor perform a thorough site evaluation prior to submitting a proposal.

SCOPE: The Contractor shall provide a technical and cost proposal for turn-key services to install ceiling-mounted patient lifts in accordance with this scope of work. This cost proposal shall be for providing installation of all new and removal/de-installation of all patient lift units including but not limited to: lift devices, support material, gate transition pieces and all other associated components required for complete, functional installation for ceiling lift in with scale and hand-control based charged ceiling lift systems. This proposal shall also be for installation of the lift systems including but not limited to any required plans, engineering details and documents, tools, labor, testing, training, cleaning supplies, etc. All new lift systems must have a lifting capacity of no less than 507 lbs. Operation of the system must be smooth with no fast or jerky starts and stops. Operation of the system must allow for adequate lifting height allowing for transfer of patient from bed. All lift systems must have the availability to weigh a patient in kilograms and pounds. Existing hangers, Unistrut, or other support components shall not be utilized to support the lift tracks. If additional supports are needed, new supports must be connected directly to building structural components.

Files

File Type Posted
36C24825Q0622 0001_1.docx DOCX document
S06 36C24825Q0622 0001.pdf PDF
36C24825Q0622_1.docx DOCX document
S02 36C24825Q0622.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
NTX Elevator Inspection Bonham, Texas 75418, United States · NAICS 541350 Veterans Integrated Service Network 17 Service-Disabled Veteran-Owned Small Business
6730--FY27 Remove/Install Two (2) Commercial-Grade Laser/LED Projectors NAICS 238210 Veterans Integrated Service Network 8 No set-aside
W065--RFQ | sbar approved | bed rental WD WD exempt Department of Veterans Affairs Tucson AZ 85723 · NAICS 532490 Veterans Integrated Service Network 22 Service-Disabled Veteran-Owned Small Business
WTX Elevator Inspections and Load Testing Services Texas 79720, United States · NAICS 238290 Veterans Integrated Service Network 17 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors