The Department of the Air Force Pacific Air Forces seeks excavation, packaging, transportation, and disposal of fuel-contaminated soil and wastewater at Andersen Air Force Base, Guam, with a response deadline of September 17, 2026 at 11:00 A.M. Chamorro Standard Time. This is a 100% small business set-aside under NAICS 562211, Hazardous Waste Treatment and Disposal.
Work is performed at the 36th Logistics Readiness Squadron Petroleum, Oils, and Lubricants Compound near Building 26200 / Pumphouse 1 Generator in Guam. The contractor shall excavate and remove up to 10 cubic yards of fuel-impacted soil, remove up to 1,500 gallons combined of fuel-contaminated wastewater from a Product Recovery Tank and associated Fuel Bowser, field-screen using photoionization detectors and olfactory observation, collect and analyze confirmation samples using USEPA Method 8015 targeting cleanup goals of 500 mg/kg for middle distillates and 2,500 mg/kg for residual oil, and restore the excavation site to match surrounding grade with certified clean backfill. All work must comply with OSHA 29 CFR 1910.120 (HAZWOPER), DOT hazardous materials regulations, and minimize disruption to flight operations.
The contractor provides all labor, equipment, materials, transportation, and disposal; the Government furnishes gate entry facilitation and work area identification. Deliverables include daily field reports with photographs, confirmation sample documentation, waste manifests and disposal certificates, and a final closeout report within ten calendar days of restoration completion. An optional site visit is scheduled for September 11, 2026 at 0800 at Andersen Main Gate Visitor Center, limited to two individuals per contractor. Quotations will be evaluated on technical acceptability (firm fixed-price per job) and price for best value; technically acceptable offers will be evaluated for price reasonableness. Small business size standard is $47.0 million. Quotes must remain valid for a minimum of 90 calendar days. Service Contract Labor Standards wages apply per Wage Determination 2015-5693, Revision 29.
Notice text
3 versions
Update #3 · Latest ·
The Contractor shall provide all labor, supervision, equipment, materials, tools, transportation, packaging, sampling, laboratory analysis, and disposal services necessary to remediate residual petroleum-impacted soil and remove fuel-contaminated wastewater at the 36th Logistics Readiness Squadron (LRS) Petroleum, Oils, and Lubricants (POL) Compound, Andersen Air Force Base (AFB), Guam. The work addresses contamination associated with a fuel release near Building 26200 / Pumphouse 1 Generator and the contents of the Product Recovery Tank at Pumphouse 1.
The objective is to excavate and remove fuel-impacted soils to achieve the applicable cleanup goals, properly package, transport, and dispose of all generated waste (soil and liquid), confirm attainment of cleanup standards through laboratory analysis, and restore the excavated area to match surrounding grade and pre-existing conditions. All work shall be performed in a manner that minimizes disruption to flight operations and base activities.
Amendment 0001 - Updated SOW to = Attachment 1 - Statement of Work (SOW)_14SEP26, edits made in RED TEXT
Section 4.4 "Product Recovery Tank and Fuel Bowser Wastewater Removal"
"The Contractor shall remove up to 900 gallons of fuel-contaminated wastewater / product from the Product Recovery Tank located at Pumphouse 1, additionally 1 Fuel Bowser with 600 gallons of fuel-contaminated wastewater (combined total of approximately 1500 gallons)."
Amendment 0002 - Updated SOW to = Attachment 1 - Statement of Work (SOW)_15SEP26
Section 5.0 - Period of Performance was removed from SOW.
Update #2 ·
The Contractor shall provide all labor, supervision, equipment, materials, tools, transportation, packaging, sampling, laboratory analysis, and disposal services necessary to remediate residual petroleum-impacted soil and remove fuel-contaminated wastewater at the 36th Logistics Readiness Squadron (LRS) Petroleum, Oils, and Lubricants (POL) Compound, Andersen Air Force Base (AFB), Guam. The work addresses contamination associated with a fuel release near Building 26200 / Pumphouse 1 Generator and the contents of the Product Recovery Tank at Pumphouse 1.
The objective is to excavate and remove fuel-impacted soils to achieve the applicable cleanup goals, properly package, transport, and dispose of all generated waste (soil and liquid), confirm attainment of cleanup standards through laboratory analysis, and restore the excavated area to match surrounding grade and pre-existing conditions. All work shall be performed in a manner that minimizes disruption to flight operations and base activities.
Amendment 0001 - Updated SOW to = Attachment 1 - Statement of Work (SOW)_14SEP26, edits made in RED TEXT
Section 4.4 "Product Recovery Tank and Fuel Bowser Wastewater Removal"
"The Contractor shall remove up to 900 gallons of fuel-contaminated wastewater / product from the Product Recovery Tank located at Pumphouse 1, additionally 1 Fuel Bowser with 600 gallons of fuel-contaminated wastewater (combined total of approximately 1500 gallons)."
Update #1 ·
The Contractor shall provide all labor, supervision, equipment, materials, tools, transportation, packaging, sampling, laboratory analysis, and disposal services necessary to remediate residual petroleum-impacted soil and remove fuel-contaminated wastewater at the 36th Logistics Readiness Squadron (LRS) Petroleum, Oils, and Lubricants (POL) Compound, Andersen Air Force Base (AFB), Guam. The work addresses contamination associated with a fuel release near Building 26200 / Pumphouse 1 Generator and the contents of the Product Recovery Tank at Pumphouse 1.
The objective is to excavate and remove fuel-impacted soils to achieve the applicable cleanup goals, properly package, transport, and dispose of all generated waste (soil and liquid), confirm attainment of cleanup standards through laboratory analysis, and restore the excavated area to match surrounding grade and pre-existing conditions. All work shall be performed in a manner that minimizes disruption to flight operations and base activities.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Solicitation: SPE605-26-R-0218 (Guam Post, Camps & Stations (PC&S) PP 1. 8R) | Energy | No set-aside | |
| Grease Trap and Used Cooking Oil Containment Services | Air Force Test Center | Total Small Business | |
| DCDO Septic Tank and Sewage Treatment Maintenance | Pacific Air Forces | No set-aside | |
| SOURCES SOUGHT: Grease, Sand Trap, Oil and Water Separator | Air Combat Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity