22 MXS Porta-Fab Offices Hangar 1126(SB) and 1107
Closed Solicitation Posted
- Solicitation number
- FA462126Q0048
- Agency
-
Air Mobility Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 332311 Prefabricated Metal Building and Component Manufacturing
- PSC
- 5410 Prefabricated And Portable Buildings
- Place of performance
- McConnell AFB, Kansas 67221, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Air Mobility Command seeks design, delivery, build, and installation of two four-wall, single-story modular office structures (12 feet wide by 20 feet long by 9 feet high, 240 square feet each) at McConnell Air Force Base, Kansas, with proposals due September 18 at 12:00 AM CDT. The procurement is set aside for Total Small Business.
Place of performance is McConnell AFB, KS. Unit 1 installs in Hangar 1126 (South Bay) and Unit 2 in Hangar 1107; both mount directly on existing level concrete hangar floor slabs. The period of performance is 120 calendar days from contract award. The contractor shall provide all management, tools, supplies, equipment, and labor for design, delivery, build, and installation.
Technical specifications include 4-inch insulated wall panels with double-layer steel studs and vinyl finish; one commercial walk-in door (36 inches by 84 inches minimum) and two windows per unit; one 8,000 BTU minimum through-wall HVAC unit; six 115-VAC quad receptacles with internal LED ceiling lighting and exterior load center/disconnect switch with secondary conduit to facility electrical panel (within 75 linear feet); internal overhead wet fire sprinkler piping and heads per NFPA 13 standards; and twelve 4-port CAT6 RJ-45 wall jacks with internal plenum-rated CAT6 cabling terminating at external consolidation point. The contractor must provide a Quality Control Plan, standard commercial manufacturer warranty (minimum one year) on all components, and one-year workmanship warranty on installation and structural assembly. Technical support must be available Monday through Friday, 0730–1600 CST during the warranty period. On-site work hours are Monday through Friday, 0730–1630 CST, excluding Federal Holidays, with written Contracting Officer approval required for work outside these hours. All contractor personnel must obtain base access passes through 22 Security Forces Pass and Registration Office at least ten business days prior to arrival and must comply with McConnell AFB security protocols and base regulations. Weekly status reports are due every Friday by 12:00 PM. Five business days' written notice to the Project Manager is required before on-site mobilization. The Government will provide access to existing 115V electrical outlets for small power tools only; it will not furnish equipment, materials, fuel, or personnel. No award value or ceiling is stated. Funds are not presently available; Government obligation is contingent upon appropriated funds availability.
Notice text
3 versions
Update #3 · Latest ·
***Amendment 2***
Added drawings for placment of portable office spaces in each hangar
***Amendment 1***
**Funds are not presently available for this acquisition. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract.**
This announcement constitutes the only solicitation and quotes are being requested.
This solicitation document, which incorporates provisions and clauses for commercial items, are those in effect through the DAF Contracting Compass.
In order to be considered for award, offerors shall return a copy of this solicitation with all representations filled in. Offerors may elect to use their representations in SAM.gov to fill this requirement.
Offers shall be submitted in pdf format and are limited to 10 pages.
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to design, deliver, build, and install two (2) four-wall, single-story modular office structures at McConnell AFB, KS:
Unit 1: Hangar 1126 (South Bay)
Unit 2: Hangar 1107
For full details regarding the scope of work, technical specifications, installation requirements, and delivery schedules, please refer to the attached Statement of Work (SOW) dated 15 Sep 2026 and other documents. The Statement of Work has also been updated to remove section 3.1.2, "Floor Fastening."
Submissions are due no later than 18 September at 12:00am CDT.
Submit questions via email directly to SSgt Dania Duperou at dania.duperou-flores@us.af.mil with TSgt Brian Brammer at brian.brammer@us.af.mil.
Update #2 ·
***Amendment 1***
**Funds are not presently available for this acquisition. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract.**
This announcement constitutes the only solicitation and quotes are being requested.
This solicitation document, which incorporates provisions and clauses for commercial items, are those in effect through the DAF Contracting Compass.
In order to be considered for award, offerors shall return a copy of this solicitation with all representations filled in. Offerors may elect to use their representations in SAM.gov to fill this requirement.
Offers shall be submitted in pdf format and are limited to 10 pages.
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to design, deliver, build, and install two (2) four-wall, single-story modular office structures at McConnell AFB, KS:
Unit 1: Hangar 1126 (South Bay)
Unit 2: Hangar 1107
For full details regarding the scope of work, technical specifications, installation requirements, and delivery schedules, please refer to the attached Statement of Work (SOW) dated 15 Sep 2026 and other documents. The Statement of Work has also been updated to remove section 3.1.2, "Floor Fastening."
Submissions are due no later than 18 September at 12:00am CDT.
Submit questions via email directly to SSgt Dania Duperou at dania.duperou-flores@us.af.mil with TSgt Brian Brammer at brian.brammer@us.af.mil.
Update #1 ·
**Funds are not presently available for this acquisition. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract.**
This announcement constitutes the only solicitation and quotes are being requested.
This solicitation document, which incorporates provisions and clauses for commercial items, are those in effect through the DAF Contracting Compass.
In order to be considered for award, offerors shall return a copy of this solicitation with all representations filled in. Offerors may elect to use their representations in SAM.gov to fill this requirement.
Offers shall be submitted in pdf format and are limited to 10 pages.
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to design, deliver, build, and install two (2) four-wall, single-story modular office structures at McConnell AFB, KS:
Unit 1: Hangar 1126 (South Bay)
Unit 2: Hangar 1107
Both units shall be installed directly upon the existing level concrete hangar floor slab.
For full details regarding the scope of work, technical specifications, installation requirements, and delivery schedules, please refer to the attached Statement of Work (SOW) dated 8 Sep 2026.
Questions are due no later than 14 September at 12:00am CDT.
Submissions are due no later than 16 September at 12:00am CDT.
Submit questions via email directly to SSgt Dania Duperou at dania.duperou-flores@us.af.mil with TSgt Brian Brammer at brian.brammer@us.af.mil.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| PKA Relocatable Facility | Global Strike Command | Total Small Business | |
| Office Furniture Bldg. 2213 | Air Force Sustainment Center | No set-aside |