127EAW21R0054 - Parker Creek Road Maintenance
Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 127EAW21R0054
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Not on record
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Alturas, California 96101, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for road maintenance services on Forest Road 42N31 located in Alturas, California for the United States Department of Agriculture Forest Service. The project consists of resurfacing 7 miles of roadway with a surface course aggregate to a depth of 6 inches, clearing and grubbing along the roadway, and delivering aggregate materials to a stockpile site. Solicitation 127EAW21R0054 is expected to post to beta.sam.gov on July 16, 2021 and will include all necessary specifications, drawings, and information for interested small businesses certified in SAM to submit proposals, which will be evaluated based on the requirements in the solicitation.
The opportunity is set aside for total small business concerns. The predominant NAICS code is 237310 for highway, street, and bridge construction with a size standard of $39.5 million. The estimated value of the contract is between $250,000 to $500,000. Project details include resurfacing 7 miles of Forest Road 42N31 with a minimum aggregate depth of 6 inches, with additional material expected for the first 3.5 miles.
Notice text
Description: THIS IS A PRE-SOLICITATION NOTICE FOR A REQUEST FOR PROPOSAL (RFP). Proposals shall only be requested and accepted from contractors who are a Small Business AND certified in System for Award Management (SAM, https://sam.gov/content/home).
The United States Department of Agriculture (USDA), United States Forest Service (USFS), has a requirement for but not limited to the following:
Parker Creek Road Maintenance Project:
This project consists resurfacing a 7-mile section of Forest Road 42N31 (located off Forest Route 42N05 (5 Road), 13 miles east of Alturas, CA) with ¾” surface course aggregate (grading U) to 6” compaction depth (compaction method B). Surfacing shall begin at intersection with County Road 56 and continue for ¼ mile past the Parker Creek Middle Fork Bridge. Road currently has some surface material present. Final aggregate depth shall be minimum 6”, an additional 4” is expected to be needed for first 3.5 miles and an additional 2” for the remaining 3.5 miles.
Clearing and grubbing 7-mile section of Forest Road 42N31 to specifications (disposal methods (i) and (g)). Clearing and grubbing shall begin at intersection with County Road 56 and continue for 7 miles. Material should be disposed of by chipping/mastication and dispersion outside the prism of the road. Light brushing is needed transitioning into medium brushing.
Deliver aggregate (grading U) in quantity specified in awarded contract to stockpile approximately 1.2 miles from intersection with County Road 56.
Solicitation Number 127EAW21R0054 for this effort will be posted to Beta.Sam.Gov (https://beta.sam.gov/) on or about July 16th, 2021. This solicitation will contain all necessary specifications, drawings and other information necessary submit a proposal for this project.
There is currently no official group site visit scheduled. The solicitation will include site visit information if one is deemed necessary.
Disclosure of the magnitude of construction projects:
The estimated cost of the total project is expected to be between $250,000.00 and $500,000.00.
NAICS Code: 237310 – Highway, Street, and Bridge Construction
Size Standard: $39.5 Million
Point of Contact: Gregory Cunningham, Contracting Officer
Gregory.Cunningham@USDA.gov
(530) 575-7569
Interested firms are encouraged to register via https://beta.sam.gov/ in order to view the formal solicitation when it is released.
Files
| File | Type | Posted |
|---|---|---|
| Pre-Solicitation Notice.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| 127EAW21R0054 - Parker Creek Road Maintenance | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip | — | No set-aside | |
| Access Road Repair National Elk Refuge | — | Total Small Business | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business | |
| Administrative Parking Lot Repairs | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity