127EAW21R0054 - Parker Creek Road Maintenance

Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
127EAW21R0054
Agency
Responses due
Not on record
Set-aside
Total Small Business

Opportunity facts

Place of performance
Alturas, California 96101, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice is for road maintenance services on Forest Road 42N31 located in Alturas, California for the United States Department of Agriculture Forest Service. The project consists of resurfacing 7 miles of roadway with a surface course aggregate to a depth of 6 inches, clearing and grubbing along the roadway, and delivering aggregate materials to a stockpile site. Solicitation 127EAW21R0054 is expected to post to beta.sam.gov on July 16, 2021 and will include all necessary specifications, drawings, and information for interested small businesses certified in SAM to submit proposals, which will be evaluated based on the requirements in the solicitation.

The opportunity is set aside for total small business concerns. The predominant NAICS code is 237310 for highway, street, and bridge construction with a size standard of $39.5 million. The estimated value of the contract is between $250,000 to $500,000. Project details include resurfacing 7 miles of Forest Road 42N31 with a minimum aggregate depth of 6 inches, with additional material expected for the first 3.5 miles.

Notice text

Description: THIS IS A PRE-SOLICITATION NOTICE FOR A REQUEST FOR PROPOSAL (RFP). Proposals shall only be requested and accepted from contractors who are a Small Business AND certified in System for Award Management (SAM, https://sam.gov/content/home).


The United States Department of Agriculture (USDA), United States Forest Service (USFS), has a requirement for but not limited to the following:


Parker Creek Road Maintenance Project:


This project consists resurfacing a 7-mile section of Forest Road 42N31 (located off Forest Route 42N05 (5 Road), 13 miles east of Alturas, CA) with ¾” surface course aggregate (grading U) to 6” compaction depth (compaction method B). Surfacing shall begin at intersection with County Road 56 and continue for ¼ mile past the Parker Creek Middle Fork Bridge. Road currently has some surface material present. Final aggregate depth shall be minimum 6”, an additional 4” is expected to be needed for first 3.5 miles and an additional 2” for the remaining 3.5 miles.


Clearing and grubbing 7-mile section of Forest Road 42N31 to specifications (disposal methods (i) and (g)). Clearing and grubbing shall begin at intersection with County Road 56 and continue for 7 miles. Material should be disposed of by chipping/mastication and dispersion outside the prism of the road. Light brushing is needed transitioning into medium brushing.
Deliver aggregate (grading U) in quantity specified in awarded contract to stockpile approximately 1.2 miles from intersection with County Road 56.


Solicitation Number 127EAW21R0054 for this effort will be posted to Beta.Sam.Gov (https://beta.sam.gov/) on or about July 16th, 2021. This solicitation will contain all necessary specifications, drawings and other information necessary submit a proposal for this project.


There is currently no official group site visit scheduled. The solicitation will include site visit information if one is deemed necessary.
Disclosure of the magnitude of construction projects:

The estimated cost of the total project is expected to be between $250,000.00 and $500,000.00.


NAICS Code: 237310 – Highway, Street, and Bridge Construction
Size Standard: $39.5 Million


Point of Contact: Gregory Cunningham, Contracting Officer
Gregory.Cunningham@USDA.gov
(530) 575-7569


Interested firms are encouraged to register via https://beta.sam.gov/ in order to view the formal solicitation when it is released.

Files

File Type Posted
Pre-Solicitation Notice.pdf PDF

Notice history

Notice Type Posted
127EAW21R0054 - Parker Creek Road Maintenance Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Custer Gallatin National Forest Ashland and Sioux Road Maintenance Billings, Montana, United States · NAICS 237310 Region 6 - Pacific Northwest Region Total Small Business
NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip NAICS 237310 — No set-aside
Access Road Repair National Elk Refuge NAICS 237310 — Total Small Business
Jake Rocks Road Reconstruction Warren, Pennsylvania 16365, United States · NAICS 237310 Forest Service Total Small Business
Administrative Parking Lot Repairs Colorado 80526, United States · NAICS 237310 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors