10 SOPS Operations Console Furniture Requirement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
FA255025Q0005
Agency
Air Force Space Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
337214 Office Furniture (except Wood) Manufacturing
PSC
7110 Office Furniture
Place of performance
Point Mugu Nawc, California 93042, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Space Command is seeking a small business contractor to provide comprehensive modular furniture reconfiguration services for the Delta 8/10 SOPS Operations Center at Naval Base Ventura County in Point Mugu, California. The procurement involves designing, delivering, and installing 10 modular consoles with varying operator capacities, 4 filing cabinets, 4 bookshelves, and 36 ergonomic chairs, while also removing existing furniture. The contract will be awarded on a Lowest Price Technically Acceptable basis, with a focus on creating an ergonomic solution suitable for 24/7 mission-critical operations. Vendors must have an active SAM registration and provide required documentation including CAGE number and UEI. Key dates include a mandatory site visit on January 15, 2025, questions due by January 20, 2025, and quote submissions due by February 7, 2025 at 1:00 PM PST.

The solicitation is a 100% small business set-aside under NAICS code 337214 with a size standard of 1,100 employees. The period of performance is 120 days after receipt of order, with installation scheduled for April 2025. The furniture must meet specific requirements including black and gray color schemes, high-pressure laminate worksurfaces, integrated cable management, and security shields. Some consoles will feature sit-stand capabilities, and all must accommodate multiple 24" monitors and be ADA compliant. The project will be completed at Naval Base Ventura County, specifically in Building 375, with a total of 10 modular consoles to be installed (including configurations of 4-operator, 2-operator, and a 10-operator console). Warranty coverage will range from lifetime on fixed steel components to 2 years on electrical components, ensuring long-term reliability and performance of the installed furniture.

Notice text

3 versions

Update #3 · Latest ·

The contractor shall provide all tools, materials, equipment and personnel necessary to provide modular furniture reconfiguration, disassemble, remove, receive, deliver, and install new furniture, parts and installation in the Delta 8/10 SOPS Operations Center,
building 375, Naval Base Ventura County, Point Mugu, California.

The contractor shall design, deliver, and install 10 modular consoles, 4 filing cabinets, and 4 bookshelves and disassemble and remove existing consoles and replace existing operator consoles and technical furniture with 9 consoles, 4 filing cabinets, and 4 bookshelves.


Solution shall maximize operator ergonomics, be a cohesive configuration designed for 24/7 mission critical operation addressing existing needs and sustainable for future operator and equipment modifications and provide a more efficient work environment with a return on investment that will ensure a future forward solution for many years to come. Furniture shall be cohesive in materials to
ensure maximum longevity.

Please see attachments for additional information and instructions for base access for scheduled site visit on 15 January 2025.

Amendment 1

The purpose of this amendment is to extend the offers due date to 3 February 2025 1:00 PM PST. Also, incorporate the new PWS dated 27 January 2025, and incorporate Attachment 5 - Site Visit QnA. Small changes to the PWS include removal of all monitor arms requirements and clarification on furniture surface material.

Amendment 2

The purpose of this amendment is to extend the offers due date to 7 February 2025 1:00 PM PST. Also, incorporate the new PWS dated 30 January 2025, and incorporate Attachment 5 - Site Visit QnA Revision 2, and Small changes to the PWS include the addition of 1 work chair from 36 to 37, clarification on console surfaces, clarification on monitor arms being allowed for a horizontal track system, and removal of the pencil stop.

 

Update #2 ·

Amendment 1

The purpose of this amendment is to extend the offers due date to 3 February 2025 1:00 PM PST. Also, incorporate the new PWS dated 27 January 2025, and incorporate Attachment 5 - Site Visit QnA. Small changes to the PWS include removal of all monitor arms requirements and clarification on furniture surface material.

The contractor shall provide all tools, materials, equipment and personnel necessary to provide modular furniture reconfiguration, disassemble, remove, receive, deliver, and install new furniture, parts and installation in the Delta 8/10 SOPS Operations Center,
building 375, Naval Base Ventura County, Point Mugu, California.

The contractor shall design, deliver, and install 10 modular consoles, 4 filing cabinets, and 4 bookshelves and disassemble and remove existing consoles and replace existing operator consoles and technical furniture with 9 consoles, 4 filing cabinets, and 4 bookshelves.


Solution shall maximize operator ergonomics, be a cohesive configuration designed for 24/7 mission critical operation addressing existing needs and sustainable for future operator and equipment modifications and provide a more efficient work environment with a return on investment that will ensure a future forward solution for many years to come. Furniture shall be cohesive in materials to
ensure maximum longevity.

Please see attachments for additional information and instructions for base access for scheduled site visit on 15 January 2025.

Update #1 ·

The contractor shall provide all tools, materials, equipment and personnel necessary to provide modular furniture reconfiguration, disassemble, remove, receive, deliver, and install new furniture, parts and installation in the Delta 8/10 SOPS Operations Center,
building 375, Naval Base Ventura County, Point Mugu, California.

The contractor shall design, deliver, and install 10 modular consoles, 4 filing cabinets, and 4 bookshelves and disassemble and remove existing consoles and replace existing operator consoles and technical furniture with 9 consoles, 4 filing cabinets, and 4 bookshelves.


Solution shall maximize operator ergonomics, be a cohesive configuration designed for 24/7 mission critical operation addressing existing needs and sustainable for future operator and equipment modifications and provide a more efficient work environment with a return on investment that will ensure a future forward solution for many years to come. Furniture shall be cohesive in materials to
ensure maximum longevity.

Please see attachments for additional information and instructions for base access for scheduled site visit on 15 January 2025.

Attachments

Show all 11

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
10 SOPS Operations Console Furniture Requirement Award Award Notice
10 SOPS Operations Console Furniture Requirement This notice · Latest solicitation Solicitation
10 SOPS Operations Console Furniture Requirement Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity