100%
Skip to main content
Platform
GovTribe AI
AI-powered insights to accelerate your government contracting workflow.
MCP Server
Connect GovTribe to your AI tools.
Beacon
Find and connect with key government decision-makers.
Profiles
Federal Agencies
Federal Contract Vehicles
Federal Grant Programs
Major Defense Acquisition Programs
NAICS Categories
PSC Categories
States
Jurisdictions
NIGP Categories
UNSPSC Categories
Vendors
Enrichment By Clearbit
Reports
New Entrants
Funding Analysis
Vehicle Analysis
Groups
Capture
Pipelines
Pursuits
Alerts
Teaming
Data
Awards
Forecasts
Federal Opportunities
State & Local Opportunities
Files
Prime and Subcontractors
Activity
Search
Exports
Solutions
Use Case
Opportunity Identification
Capture Management
Competitive Intelligence
Teaming & Partner Identification
Proposal Management
Strategic Leadership
Go-to-Market Strategy
Industry
Federal Contractors
State & Local Contractors
Grant Seekers
Government Agencies
Research & Consulting
Pricing
More
About Us
Features
Get A Demo
Sign Up
Blog
User Guide
Data Model
GovTribe for Agents
Login
Contact sales
Try for free
Login
Contact sales
Try for free
All Jurisdictions
Long Island City
Type
Place
Child
Overview
Details
Contacts
Contract Opportunities
3
Government Files
9
State
Kansas
Additional Information
Not listed
No description provided
5
1
Name
Description
State
DueDate
PostedDate
2025 Water System Improvements
The City of Lenora, Kansas is requesting bids on 2025 Water System Improvements including waterline replacements with associated valves and fittings, fire hydrant reconnections, and water service installations at various locations throughout the city, with proposals due August 13, 2026. The scope encompasses critical water infrastructure upgrades to the city's water distribution system. Contractors must demonstrate experience with waterline replacement projects and possess appropriate licensing and bonding capabilities. Work will be coordinated with city water department personnel and must minimize disruption to existing service. The project specifications include detailed requirements for materials, installation standards, and compliance with applicable codes and regulations for water system infrastructure. Site familiarization is recommended prior to bid submission to ensure accurate cost estimation across the various locations and installation requirements involved. Funding derives from the city's water utility budget and capital improvement funds, with work sequenced according to city priorities and seasonal considerations.
Kansas
8/13/26, 1:00 AM
7/10/26, 1:00 AM
8-Bay Storage Shed Kit
The Kansas Department of Transportation, in conjunction with the Kansas Department of Administration's Office of Procurement and Contracts, is soliciting bids for the procurement and delivery of one pre-engineered 8-bay wood frame storage shed kit to be delivered to 210 Century Road in Lyons, Kansas. The shed must measure 40 feet wide by 121 feet long with a 14-foot clear height, be enclosed on three sides with an open length side, and be designed to accommodate 14-foot-wide by 12-foot-high doorways, with all materials necessary for assembly included in the delivery. The Request for Quote (RFQ) event (EVT0010748) opened on March 23, 2026, at 2:46 PM CDT and closes on April 14, 2026, at 2:00 PM CST, with a delivery deadline of September 30, 2027. Vendors not initially invited must notify the procurement officer of their intent to bid at least 24 hours prior to the closing date, and all bids must be submitted in hard copy by mail or email to procurement@ks.gov; faxed bids are not acceptable. The building must comply with the 2006 International Building Code and be structurally certified by a Professional Engineer registered in Kansas, and bidders must provide a mandatory four-hour training session conducted by a competent technician to KDOT personnel covering construction and preventive maintenance procedures before the first delivery. Required warranties include a ten-year protection against chalk or fade on steel panels, a twenty-year paint system adherence warranty, and a fifty-year rot and insect damage protection for treated wood columns in soil contact. Bidders may claim eligibility for the Kansas Bidder Preference Program or the Disabled Veteran Owned Business preference program if applicable, with supporting documentation required. All bidders and their subcontractors must submit a current Tax Clearance Certificate from the Kansas Department of Revenue, along with completed Boycott of Israel, Sexual Harassment, Immigration Reform and Control, Bidder Registration, and Procurement equipment certification forms. Acceptable manufacturers listed as guides include Morton Building Systems, American Building Products, Bel-Wood Buildings, Chief Series, Idaho Timber Corporation, Lester Building Inc., and Wick Buildings, though bids on comparable brands will be considered. Pricing must be submitted in U.S. dollars on the provided cost sheet with delivery terms specified as FOB Destination, Prepaid and Allowed, including all delivery charges and applicable federal, state, and local taxes (except Kansas sales/use and federal excise taxes), and the State of Kansas is exempt from sales and excise taxes. Political subdivisions are permitted to utilize this contract under the same conditions as the State of Kansas, and the State reserves the right to accept or reject any bid responses and to waive minor deviations that do not hinder the intent of the request. No specific budget range or award value is provided in the solicitation documents.
Kansas
4/14/26, 3:00 PM
3/23/26, 3:46 PM
Milling & HMA Overlay - Osage County
The Kansas Department of Transportation (KDOT) is soliciting bids for milling and hot mix asphalt overlay work on US-75 in Osage County, with proposals due October 21, 2026 at 1:00 p.m. local time. Contractors must be prequalified with KDOT and hold a current Tax Clearance Certificate from the Kansas Department of Revenue at contract award; subcontractors likewise must maintain current Tax Clearance Certificates before approval. The project spans 7.012 miles on US-75 from the Osage/Coffey County line north to 1,042 feet south of Jordan Road and includes approximately 14,995 tons of SR-12.5A HMA overlay (PG 70-28), 7,897 tons of SR-12.5A HMA overlay for shoulders (PG 64-22), 214,086 square yards of milling, 1,040 stations of milled rumble strips, 147,172 linear feet of pavement markings, and quality control testing for HMA. The contract requires completion of restricted traffic work within 30 days and full project completion within 40 contract working days. Earliest start date is April 3, 2027; latest start date is June 7, 2027. Contractors must execute the contract within ten business days of award notification. The funding source is STATE funds. Proposals must be submitted electronically through Bidx.com; proposals will be opened and read at 3:00 p.m. on October 21, 2026 at the Eisenhower State Office Building in Topeka. The bid documents establish set prices for mobilization, traffic control, flagger services, maintenance and restoration of haul roads, and asphalt cores. Contractors may accept or reject special provisions covering fuel price adjustments, asphalt material price adjustments, and emulsified asphalt price adjustments. Environmental and safety requirements include stormwater pollution management, work zone traffic control, and compliance with the Migratory Bird Treaty Act.
Kansas
10/21/26, 1:00 AM
9/22/26, 1:00 AM