This document package includes specifications, drawings, and wage rates for a federal construction project to replace sewage and storm lift stations and piping at the Jacksonville Air Route Traffic Control Center in Hilliard, Florida. The Federal Aviation Administration Enroute Construction Branch in Atlanta is soliciting offers for the project set aside for small businesses with a NAICS code of 237110 and size standard of $45 million. The price range for the requirement is $500,000 to $1 million with payment and performance bonds required. A mandatory site visit is scheduled for March 26 and all attendees must register in advance and bring photo ID for facility access. Questions are due by April 5 and offers are due by April 30 via email. The drawings will be updated with signed versions.
This summarizes the key details including the type of federal construction project, location, soliciting agency, NAICS code and size standard, mandatory site visit details, question and offer due dates, and pricing and bond terms.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
VICINITY MAP
HILLIARD, FLORIDA
PROJECT
LOCATION
GEORGIA
GEORGIA
FLORIDA
FLORIDA
MA
RY
S
RI
VE
R
NASSAU
RIVER
RT 301 115
A
AIA
I 2
RT 90
RT
RT 90
AI
A
ST
RT 23
RT 1
CALLAHAN
DUVAL
JACKSONVILLE
BRYCEVILLE
HILLIARD
FOLKSTON
NASSAU
RIVER
ST.
JOHNS
RIVER
ST. JOHNS
JACKSONVILLE
INTERNATIONAL
AIRPORT
ATLANTIC
OCEAN
FERNANDINA
BEACHI 95
I 95I 10
I 10
JACKSONVILLE ARTCC (ZJX)
HILLIARD, FL
REPLACE SEWAGE AND STORM WATER
LIFT STATIONS AND PIPING
100% DESIGN
IS
SU
ED
F
OR
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
ZJX-1509594-G001
ARTCC
REPLACE SEWAGE AND STORM WATER
LIFT STATIONS AND PIPING
COVER SHEET
FL
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text N
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
Y
___A012 _3___
___A010 _A___
1__ ___A010_____
A__ ___A012_____
_E1 ___A012_____
8_____
FIN_FLR_________
EL._89'-6"______
___C-C
FLOOR_EL._10.50'__
Sb_
L1
_ J
_ J
(15)
VFD
3P
DRAWING LIST
STANDARD ABBREVIATIONS
S
T
U
N
O
R
V
W
X
P
D
E
FA
B
C
G
K
L
M
H
I
J
GENERAL LEGEND PLUMBING LEGEND ELECTRICAL LEGEND
AHU____
200____
V
SS
BRANCH CONNECTION
TO BOTTOM OF PIPE
BALL VALVE WITH NORMAL
POSITION OPEN/CLOSED
SANITARY VENT
OR PIPING BELOW GROUND
BRANCH CONNECTION
TO TOP OF PIPE
SANITARY SEWER/WASTE
OR PIPING ABOVE GROUND
FD
SIZE TYPE
PH PHASE
PHC PREHEAT COIL
PI PRESSURE INDICATOR
POC POINT OF CONNECTION
PRV PRESSURE REDUCING VALVE
PS PRESSURE SENSOR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
R RADIUS
RA RETURN AIR
RCP REFLECTED CEILING PLAN
REC RECEPTACLE
REF REFERENCE
REINF REINFORCING
REQ'D REQUIRED
REV REVISION OR REVERSE
RGS RIGID GALVANIZED STEEL
RHC REHEAT COIL
RPM REVOLUTIONS PER MINUTE
RV REFRIGERANT VENT
SA SUPPLY AIR
SAP SOUND ABSORBING PANEL
SCH SCHEDULE
SD SMOKE DAMPER
SF SUPPLY FAN
SIM SIMILAR
SPEC SPECIFICATIONS
SS SANITARY SEWER
STD STANDARD
STR STRUCTURE
T THERMOSTAT
TEMP TEMPERATURE
TI TEMPERATURE INDICATOR
TOD TOP OF DUCT
TOP TOP OF PIPE
TRANS TRANSVERSE
TS TEMPERATURE SENSOR
TYP TYPICAL
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
V VENT OR VOLTS
VAV VARIABLE AIR VOLUME TERMINAL
VCT VINYL COMPOSITE TILE
VD VOLUME DAMPER
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VIF VERIFY IN FIELD
VS VIBRATION SENSOR
W WATTS
W/ WITH
WB WET BUILD TEMPERATURE
WC WATER COLUMN
W/O WITHOUT
WWF WELDED WIRE FABRIC
XFER TRANSFER
XFMR TRANSFORMER
Y YARD HYDRANT
FCU FAN COIL UNIT
FCV FLOW CONTROL VALVE
FD FIRE DAMPER OR FLOOR DRAIN
FD/SD FIRE/SMOKE DAMPER
FFE FINISHED FLOOR ELEVATION
FLG FLANGE
FM FLOW METER/SENSOR
FPM FEET PER MINUTE
FT FEET
FW FIRE WATER
G NATURAL GAS
GA GAUGE
GALV GALVANIZED
GFI GROUND FAULT INTERRUPTER
GND GROUND
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GV GATE VALVE
HB HOSE BIBB
HC HEATING COIL
HP HORSE POWER
HR HOUR
HS HUMIDITY SENSOR
HTE HEAT TRACE ELEMENT
HU HUMIDIFIER
HW DOMESTIC HOT WATER
HWC HW CIRCULATION LOOP
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
HZ HERTZ
ID INSIDE DIAMETER
IN INCH
INV INVERT
IW INDUSTRIAL WATER
JB JUNCTION BOX
KVA KILOVOLT AMPERE
KW KILOWATTS
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LWT LEAVING WATER TEMPERATURE
LFMC LIQUIDTIGHT FLEX METAL COND.
MAX MAXIMUM
MBH 1000 BTU PER HOUR
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MFG MANUFACTURER
MIN MINIMUM
NO NORMALLY CLOSED
IC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER
A AMP
AC ALTERNATING CURRENT
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFM AIR FLOW METER/SENSOR
AHU AIR HANDLING UNIT
AO ANALOG OUTPUT
APROX APPROXIMATELY
ARCH ARCHITECT/ARCHITECTURAL
ASSY ASSEMBLY
AUX AUXILIARY
AWG AMERICAN WIRE GAUGE
BF BLIND FLANGE
BFP BACK FLOW PREVENTER
BFV BUTTERFLY VALVE
BKR BREAKER
BLDG BUILDING
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BOTT BOTTOM
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTUH BTU PER HOUR
BTW BETWEEN
BV BALL VALVE
BWV BACK WATER VALVE
CC COOLING COIL
CD CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CIP CAST IN PLACE
CIRC CIRCULATING
CKT CIRCUIT
CL CENTER LINE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
CONT CONTINUOUS
COR CONTRACTING OFFICERS
REPRESENTATIVE
CTR CENTER OR COOLING TOWER
WATER RETURN
CTS COOLING TOWER WATER SUPPLY
CU CONDENSING UNIT
CW DOMESTIC COLD WATER
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
D DRAIN
DB DRY BULB TEMPERATURE
DBL DOUBLE
DC DIRECT CURRENT
DDC DIRECT DIGITAL CONTROL
DI DUCTILE IRON
DIA DIAMETER
DISC DISCONNECT
DN DOWN
DO DIGITAL OUTPUT
DP DIFFERENTIAL PRESSURE
DPS DP SENSOR
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
ELEV ELEVATION
ELEC ELECTRIC/ELECTRICAL
EMT ELECTRICAL METAL TUBING
EWT ENTERING WATER TEMPERATURE
DRAWING NO. REV. DATE DESCRIPTION
ZJX-1509594-G001
ZJX-1509594-G002
ZJX-1509594-G003
ZJX-1509594-M101
ZJX-1509594-M102
ZJX-1509594-M201
ZJX-1509594-M202
ZJX-1509594-M601
ZJX-1509594-E101
ZJX-1509594-E102
COVER SHEET AND VICINITY MAP
DRAWING INDEX, LEGEND AND ABBREVIATIONS
CONSTRUCTION STAGING PLAN
ADMINISTRATION WING LIFT STATION LOCATION PLAN
AUTOMATION WING LIFT STATION LOCATION PLAN
ADMINISTRATION WING LIFT STATION ELEVATIONS
AUTOMATION WING LIFT STATION ELEVATIONS
LIFT STATION PUMP SCHEDULE AND POINTS LIST
MCC-1A & 1B ONE-LINE DIAGRAM
PANEL SCHEDULES
AAV
OR
MOTOR OPERATED CONTROL VALVE
(VALVE TYPE VARIES)
M
DARKEN ARROW INDICATES
ELEVATION SHOWN
INTERIOR ELEVATION
DESIGNATION
ELEVATION NUMBER
SHEET ON WHICH
ELEVATION IS DRAWN
ELEVATION REFERENCE
ELEVATION DESIGNATION
SECTION CUT
SHEET WHICH
SECTION IS CUT
DETAIL DESIGNATION
SECTION DESIGNATION
SHEET ON WHICH
DETAIL IS DRAWN
SHEET ON WHICH
DETAIL IS DRAWN
DETAIL REFERENCE
SECTION TITLE
REFERENCE
SECTION DESIGNATION
SHEET ON WHICH DETAIL
IS DRAWN OR SCHEDULE
DETAIL TITLE
REFERENCE
DETAIL NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
DEMOLITION BY
CONTRACTOR, UON
NEW WORK, UON
EXISTING WORK, UON
OUTLINE OF OBJECT
ABOVE OR BEYOND
DUST PARTITION
MATCH LINE SYMBOL
ROOM NUMBER
NORTH ARROW
(TRUE NORTH)
GRAPHIC SCALE
ELEVATION
SYMBOL (PLAN)
ELEVATION SYMBOL
BREAK LINES
COLUMN LINE GRID DESIGNATION
UNION
STRAINER WITH BLOWDOWN VALVE
BALANCING VALVE
ISOLATION VALVE
CHECK VALVE
TEMPERATURE INDICATOR
PUMP
PIPING TO BE DEMOLISHED
NEW PIPING
EXPANSION JOINT
FLUID FLOW DIRECTION
AIR ELIMINATOR
TEST COCK (PETE'S PLUG)
PRESSURE INDICATOR WITH COCK
AUTOMATIC AIR VENT
MANUAL AIR VENT
PIPE TURNING UP
PIPE TURNING DOWN
THERMOWELL WITH TEMPERATURE
INDICATOR
ECCENTRIC REDUCER
CAPPED PIPE/OUTLET
SEGMENTED BALL VALVE
PLUG VALVE
BALL VALVE
FLOOR DRAIN
CAPPED PIPE/OUTLET
CONCENTRIC REDUCER
PIPE TURNING DOWN
PIPE TURNING UP
NUMBER
EQUIPMENT DESIGNATION
SYMBOL
DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL
4' 0 4' 8'
SCALE: 1/4" = 1'-0"
CONDUIT UP
CONDUIT DOWN
HOMERUN TO PANELBOARD. LETTERS INDICATE PANEL
DESIGNATION AND NUMBER INDICATE THE CIRCUIT LOCATION
IN THE PANEL. NUMBERS SEPARATED BY COMMAS INDICATE
MULTIPLE POLE BREAKERS.
SAME AS BRANCH CIRCUIT USING 3/4" LFMC CONDUIT, UON
SAME AS BRANCH CIRCUIT- EXCEPT CONCEALED IN OR ABOVE
CEILING OR WALL SPACE
CROSS MARKS DENOTE NUMBER OF WIRES WHEN THERE ARE
MORE THAN 3 IN A CONDUIT
BRANCH CIRCUIT- EXPOSED, 3/4" C, WITH 2 #12 WIRES PLUS
1 #12 GROUND, UON
MOUNTING HEIGHTS SHOWN WITH SYMBOL TO CENTER OF
DEVICE (UON)
SURFACE MOUNTED 208Y/120 VOLT PANELBOARD
SURFACE MOUNTED 480Y/277 VOLT PANELBOARD
JUNCTION BOX, CEILING MOUNTED EXPOSED WITH BLANK
COVER PLATED (UON)
JUNCTION BOX, WALL MOUNTED EXPOSED WITH BLANK
COVER PLATED (UON)
VARIABLE FREQUENCY DRIVE FOR AHU UNIT
FUSIBLE DISCONNECT SWITCH:
600V, 3-POLE, 3OA SWITCH, 30A FUSES, IN NEMA 1
ENCLOSURE
60" A.F.F. TO DISCONNECT HANDLE, U.O.N.
30 = SWITCH SIZE
(15)= FUSE SIZE
NON-FUSIBLE DISCONNECT SWITCH:
600V, 3-POLE, 3OA SWITCH, IN NEMA 1 ENCLOSURE
60" A.F.F. TO DISCONNECT HANDLE, U.O.N.
30 = SWITCH SIZE
3P = FUSE SIZE
SINGLE POLE SWITCH OUTLET. LOWERCASE SUBSCRIPT, WHEN
USED, INDICATES SWITCH LEG, 48" AFF (UON)
EMERGENCY LIGHTING UNITS, WALL MOUNTED, WITH
BATTERY PACK
SURFACE/SUSPENDED FIXTURE - CAPTIAL LETTERS INDICATE
FIXTURE TYPE
1/22/2024 1/22/2024 1/22/2024
1/22/2024 1/22/2024 1/22/2024 1/22/2024 1/22/2024
1/22/2024 1/22/2024
100% 100% 100%
100% 100% 100% 100% 100%
100% 100%
IS
SU
ED
F
OR
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
ZJX-1509594-G002
ARTCC
REPLACE SEWAGE AND STORM WATER
LIFT STATIONS AND PIPING
INDEX, LEGENDS, AND ABBREVIATIONS
FL
100% DESIGN
NORTH ARROW
(PLAN NORTH)
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
NO
AutoCAD SHX Text
DP-1
AutoCAD SHX Text +90"
S
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
NOT TO SCALE
SITE PLAN
CONTROL WING
KIN
GS FERRY R
OAD
POWER
SERVICE
BUILDING
AUXILIARY
SUPPORT
BUILDING
NCO
BLDG.
GUARDHOUSE
COUNTY ROAD NO S-108
ADMINISTRATION WING
AUTOMATION WING
VISITOR PARKING
MAIN ENTRANCE
CONTRACTOR STAGING AREA
CONSTRUCTION TRAILER
CONSTRUCTION CONTRACTOR PARKING AREA
AREAS OF WORK
GENERAL CONSTRUCTION SEQUENCE
1. DEMOLISH #1 PUMP, MOTOR, PIPING, VALVES. INSTALL BLIND FLANGE ON PIPING AND
INSULATE WIRING REMOVED FROM MOTOR.
2. INSTALL TEMPORARY DROP-IN SUBMERSIBLE PUMP, REMOVE BLIND FLANGE AND
INSTALL TEMPORARY PIPING BETWEEN EXISTING PIPING AND SUBMERSIBLE PUMP.
3. BEGIN 48 HOUR CONTINUOUS PROVING PERIOD FOR DROP-IN PUMP.
4. DEMOLISH #2 PUMP, MOTOR, PIPING, VALVES. DEMOLISH EXISTING MOTOR
CONTROLLER.
5. DEMOLISH SUMP BASIN COVER.
6. CLEAN BASIN (VAC TRUCK, PRESSURE WASH, ETC.)
7. INSTALL NEW SUMP BASIN COVER.
8. INSTALL NEW WIRING AND MOTOR CONTROLLER.
9. INSTALL NEW PUMP #2 AND ASSOCIATED PIPING, VALVES, AND MOTOR. PUMP #2 48
HOUR PROVING PERIOD BEGINS.
10. REMOVE DROP-IN SUBMERSIBLE PUMP.
11. INSTALL NEW PUMP #1 AND ASSOCIATED PIPING, VALVES, AND MOTOR. INSTALL LEVEL
SENSOR. PUMP #1 48 HOUR PROVING PERIOD BEGINS.
12. MOVE TO NEXT SUMP PIT FOLLOWING SUCCESSFUL PROVING.
IS
SU
ED
F
OR
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
ZJX-1509594-G003
ARTCC
REPLACE SEWAGE AND STORM WATER
LIFT STATIONS AND PIPING
SITE STAGING PLAN
FL
100% DESIGN
AutoCAD SHX Text N
AutoCAD SHX Text A.1
AutoCAD SHX Text B.1
AutoCAD SHX Text C.2
AutoCAD SHX Text C.3
AutoCAD SHX Text C.4
AutoCAD SHX Text A.3
AutoCAD SHX Text A.2
AutoCAD SHX Text A.4
AutoCAD SHX Text A.5
AutoCAD SHX Text C.5
AutoCAD SHX Text VEHICLES, PEDESTRIAN AND DELIVERIES TO SITE SHALL BE THROUGH MAIN ENTRANCE SECURITY GATE.
AutoCAD SHX Text PARKING SHALL BE LIMITED TO CONSTRUCTION STAGING AREA. EXISTING PARKING SPACES AT ARTCC ARE OFF-LIMITS FOR PARKING.
AutoCAD SHX Text
A. CONSTRUCTION ACCESSCONSTRUCTION ACCESS
AutoCAD SHX Text A.6
AutoCAD SHX Text THE FOLLOWING NOTES AND ACCOMPANYING "CONSTRUCTION STAGING PLAN" GRAPHICALLY REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO MODIFY OR REPLACE DIVISION 1 REQUIREMENTS. CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA SHALL BE COORDINATED WITH SITE PERSONNEL AND COR, IN CONJUNCTION WITH OTHER ON GOING PROJECTS. AT THE SITE AND SHALL BE DETERMINED AT THE PRECONSTRUCTION CONFERENCE.
AutoCAD SHX Text
CONSTRUCTION STAGING PLAN NOTES:
AutoCAD SHX Text VEHICLES, PEDESTRIAN AND DELIVERIES TO SITE SHALL BE THROUGH MAIN ENTRANCE SECURITY GATE. PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES ON SITE PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN AND DIRECT PERSONS NEAR CONSTRUCTION AREAS. KEEP LOADING DOCK AND CAFETERIA ACCESSIBLE AT ALL TIMES FOR FAA DELIVERIES. DELIVERIES SHALL BE SCHEDULED AND APPROVED IN ADVANCE WITH COR. COORDINATE DELIVERIES WITH THE COR. THE CONTRACTOR SHALL PROVIDE ADEQUATE ILLUMINATION FOR THE STAGING AREA PER OSHA REGULATIONS. THE CONTRACTOR IS ALSO RESPONSIBLE FOR SNOW REMOVAL FROM STAGING AREA. FAA PERSONNEL ACCESS TO OPERATIONAL EQUIPMENT MUST NOT BE IMPEDED BY ANY ACTIVITY.
AutoCAD SHX Text
B. CONTRACTOR PARKINGCONTRACTOR PARKING
AutoCAD SHX Text AN ADVANCE LIST AND WEEKLY LOG OF PERSONNEL SHALL BE PROVIDED TO COR. FAA RESERVES THE RIGHT NOT TO ACCEPT WORKERS. TEMPORARY SECURITY BADGES SHALL BE ISSUED TO CONSTRUCTION PERSONNEL. SUPERVISORY PERSONNEL SHALL BE RESPONSIBLE FOR CONDUCT OF THEIR PERSONNEL WHILE IN THE BUILDING. VEHICLES SHALL BE MARKED. SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL SHALL REMAIN IN CONSTRUCTION AREAS. FAA ESCORTS OR PICTURE BADGED CONTRACTOR DESIGNATED ESCORTS SHALL BE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING WITHIN THE BUILDING. COORDINATE WORK WITHIN THE BUILDING IN ADVANCE WITH COR. ESCORTS OUTSIDE BUILDING MAY BE REQUIRED. USE GREAT CARE AND CAUTION WHILE WORKING IN THIS FACILITY. WORK SHALL BE COORDINATED WITH COR. DISRUPTION OF THIS FACILITY SHALL NOT BE PERMITTED. EXISTING FAA AIR TRAFFIC CONTROL EQUIPMENT SHALL REMAIN OPERATIONAL THROUGHOUT THE DURATION OF THIS CONTRACT. PROTECTION OF ANY AND ALL EQUIPMENT FROM PHYSICAL OR ELECTRICAL DAMAGE IS OF UTMOST IMPORTANCE. INCIDENTAL OR ACCIDENTAL NEGLIGENCE RESULTING IN A LOSS OR DISRUPTION OF OPERATIONS SHALL BE REPORTED TO THE COR IMMEDIATELY.
AutoCAD SHX Text C.1
AutoCAD SHX Text
C. FAA SECURITY REQUIREMENTSFAA SECURITY REQUIREMENTS
AutoCAD SHX Text
D. CONSTRUCTION MATERIAL STORAGECONSTRUCTION MATERIAL STORAGE
AutoCAD SHX Text D.1
AutoCAD SHX Text STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE SHALL BE LIMITED TO THE CONSTRUCTION STAGING AREA. THE CONSTRUCTION STAGING AREA SHALL BE SURROUNDED BY A SURFACE FENCE. AVOID DISTURBANCE OF UNDERGROUND UTILITIES IN THE AREA. MATERIALS SHALL BE NEATLY STORED AND PROTECTED. LIGHTING SHALL BE PROVIDED AT THE DISCRETION OF COR. STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE SHALL BE LIMITED TO THE CONSTRUCTION STAGING AREA. THE CONSTRUCTION STAGING AREA SHALL BE SURROUNDED BY A FENCE. MATERIALS SHALL BE NEATLY STORED AND PROTECTED. LIGHTING SHALL BE PROVIDED AT THE DISCRETION OF COR. NO DIGGING WITHOUT PRIOR PERMISSION FROM COR. BURIED CABLES (UNDERGROUND UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE.
AutoCAD SHX Text
E. CONSTRUCTION DEBRISCONSTRUCTION DEBRIS
AutoCAD SHX Text E.1
AutoCAD SHX Text DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE PROVIDED BY THE CONTRACTOR WITHIN THE CONSTRUCTION STAGING AREA. AREAS AROUND DUMPSTERS SHALL BE KEPT CLEAN AND FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION. DEBRIS SHALL BE REMOVED DAILY.
AutoCAD SHX Text
F. NOT USEDNOT USED
AutoCAD SHX Text
G. CONSTRUCTION OFFICECONSTRUCTION OFFICE
AutoCAD SHX Text G.1
AutoCAD SHX Text TRAILERS FOR OFFICE, MATERIALS AND EQUIPMENT STORAGE SHALL BE LOCATED WEST OF THE AUTOMATION WING. POINT OF CONNECTION SHALL BE DETERMINED AT PRECONSTRUCTION CONFERENCE. HOOK-UPS SHALL BE THE RESPONSIBILITY OF CONTRACTOR.
AutoCAD SHX Text
H. CONSTRUCTION TOILET FACILITIESCONSTRUCTION TOILET FACILITIES
AutoCAD SHX Text H.1
AutoCAD SHX Text
SEE DIVISION 1 SPECIFICATIONS
AutoCAD SHX Text
I. DEMOLITION AND CONSTRUCTION HOURSDEMOLITION AND CONSTRUCTION HOURS
AutoCAD SHX Text I.1
AutoCAD SHX Text AIR TRAFFIC CONTROL FUNCTION OF THIS FACILITY SHALL NOT BE INTERFERED WITH. DEMOLITION AND CONSTRUCTION NOISE SHALL BE MINIMIZED BETWEEN 6:00 AM TO 11:00 PM. FAA HAS AND MAINTAINS EQUIPMENT THAT IS CRITICAL TO ITS OPERATION THROUGHOUT THIS FACILITY. COORDINATE WITH COR LOCATION OF CRITICAL EQUIPMENT THAT MAY BE AFFECTED BY THE WORK AND PROCEDURES TO PROTECT THIS AND OTHER FAA/GOVERNMENT EQUIPMENT. WORK ON CRITICAL EQUIPMENT SHALL BE ACCOMPLISHED DURING OFF-HOURS OF 11:00 PM TO 6:00 AM OR AS APPROVED BY COR. NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES SHALL BE SCHEDULED, COORDINATED AND APPROVED IN WRITING BY COR WITH A MINIMUM OF 15 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF THE WORK. CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING SHALL BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY COR. SCHEDULE, COORDINATE AND HAVE APPROVAL BY COR IN WRITING, A MINIMUM OF 15 WORKING DAYS BEFORE THE PERFORMANCE OF THE WORK.
AutoCAD SHX Text I.2
AutoCAD SHX Text I.3
AutoCAD SHX Text I.4
AutoCAD SHX Text
J. NOT USEDNOT USED
AutoCAD SHX Text
K. NOT USEDNOT USED
AutoCAD SHX Text
L. PARKING LOT AND DRIVEWAY REPAIRPARKING LOT AND DRIVEWAY REPAIR
AutoCAD SHX Text UPON COMPLETION OF WORK, REPAIR SURFACES AFFECTED BY THE WORK TO ORIGINAL CONDITION. DISTURBED LAWNS AND LANDSCAPING SHALL BE RESTORED TO ORIGINAL CONDITION TO THE SATISFACTION OF COR.
AutoCAD SHX Text L.1
AutoCAD SHX Text L.1
AutoCAD SHX Text
M. EQUIPMENT PROTECTIONEQUIPMENT PROTECTION
AutoCAD SHX Text M.1
AutoCAD SHX Text PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, FROM DAMAGE, INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT, WATER, DEBRIS AND DUST, INCLUDING CORE DRILLING. SHUTDOWNS AND SWITCHOVERS OF MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE ACCOMPLISHED DURING OFF-HOURS AS INDICATED IN NOTE I.2 THIS SHEET UNDER DEMOLITION AND CONSTRUCTION HOURS. ONLY FAA MAY OPERATE MECHANICAL VALVES, COORDINATE SHUTTING OFF VALVES WITH COR. PREPARATORY WORK SHALL BE COMPLETED PRIOR TO SHUTDOWN AND SWITCHOVER. SCHEDULE, COORDINATE AND HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF WORK.ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. REQUEST PERMISSION OF FAA IN ADVANCE AND IN WRITING FOR EACH CASE OF BREAKER OPERATION. DO NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME. ARTCC IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. IT WILL BE NECESSARY TO COORDINATE CONSTRUCTION ACTIVITY SO AS NOT TO INTERFERE WITH FUNCTIONS OF THE ARTCC. NO WELDING EQUIPMENT SHALL BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING SHALL NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY COR. VENTILATION PLAN MUST BE SUBMITTED TO FAA COR PRIOR TO ON SITE WELDING ACTIVITIES. A HOT WORK PERMIT IS REQUIRED FOR ANY ONSITE WELDING ACTIVITIES.
AutoCAD SHX Text M.2
AutoCAD SHX Text M.3
M.4
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
ADMINISTRATION WING LIFT STATION LOCATION PLAN
M101
8' 0 8' 16'
SCALE: 1/8" = 1'-0"
DEMOLISHED MATERIAL MUST BE REMOVED FROM THE BUILDING VIA THIS AREAWAY. USE THIS AREAWAY TO
BRING INSTALLATION MATERIALS INTO THE BUILDING.
DEMOLISH AND PROVIDE 4" PIPING. CONNECT TO EXISTING PIPING WITH FLANGED CONNECTION 6" AWAY FROM
WALL PENETRATION. INSTALL AT 1/8" PER FOOT SLOPED DOWNWARD TOWARD LIFT STATION.
DDCP-17 (BOILER/PUMP PANEL). SEE M601 FOR POINTS TO BE ADDED AT THIS PANEL.
DDCP-25 (AHU-330). SEE M601 FOR POINTS TO BE ADDED AT THIS PANEL.
DEMOLISH EXISTING P-1/2 MOTOR CONTROL PANEL.
PROVIDE AND INSTALL NEW P-1/2 MOTOR CONTROL PANEL IN THIS LOCATION.
EXISTING SEP-32A&B MOTOR CONTROL PANEL TO REMAIN.
EXISTING POWER FOR SEP-32A&B FED FROM MCC-1A AND MCC-1B. SEE DRAWING E101 FOR MORE INFORMATION.
EXISTING POWER FOR P-1&2 FED FROM PANEL "U". SEE DRAWING E102 FOR MORE INFORMATION.
1&2 M201
3&4 M201
P 1&2
SEP
32A&B
IS
SU
ED
F
OR
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
ZJX-1509594-M101
ARTCC
REPLACE SEWAGE AND STORM WATER
LIFT STATIONS AND PIPING
ADMIN WING LIFT STATION LOCATION PLAN
FL
100% DESIGN
GENERAL NOTES
1. COORDINATE ALL DEMOLITION AND INSTALLATION ACTIVITIES WITH COR.
2. ONLY ONE STORM WATER OR SEWAGE PUMP MAY BE TAKEN OUT OF SERVICE PRIOR TO TEMPORARY PUMP
SUCCESSFULLY COMPLETING A 48 HOUR PROVING PERIOD.
3. NEW PUMPS MUST COMPLETE A PROVING PERIOD OF AT LEAST 48 HOURS FOLLOWING INSTALLATION BEFORE
THE SECOND PUMP MAY BE TAKEN OUT OF SERVICE.
4. SCHEDULE SHUT DOWN OF SEWAGE PUMPS TO AVOID PERIODS OF HEAVY USAGE, SUCH AS SHIFT CHANGES AND BREAK TIMES. SCHEDULE SHUT DOWN OF STORM WATER PUMPS TO AVOID INCLEMENT WEATHER.
5. CLEAN DEMOLISHED PUMP EQUIPMENT AND PROTECT FLOORING TO SATISFACTION OF COR PRIOR TO
REMOVING DEMOLISHED MATERIAL
NOTES
PANEL U
MCC-1A
MCC-1B
AutoCAD SHX Text K
AutoCAD SHX Text F
AutoCAD SHX Text C-1
AutoCAD SHX Text A-1
AutoCAD SHX Text A-2
AutoCAD SHX Text A-3
AutoCAD SHX Text A-4
AutoCAD SHX Text A-5
AutoCAD SHX Text A-6
AutoCAD SHX Text B115
AutoCAD SHX Text B114
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B108
AutoCAD SHX Text B117
AutoCAD SHX Text B113
AutoCAD SHX Text
CHILLER ROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CCMS AREA
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
ENVIRONMENTAL WORK AREA
AutoCAD SHX Text
MECHANICAL EQUIPMENT ROOM
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text B103C
AutoCAD SHX Text B103D
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
LOCKER ROOM
AutoCAD SHX Text B112B
AutoCAD SHX Text B113A
AutoCAD SHX Text
LIFT STATION
AutoCAD SHX Text
AutoCAD SHX Text
BOILER ROOM
AutoCAD SHX Text
AREAWAY
AutoCAD SHX Text B116
AutoCAD SHX Text B118
AutoCAD SHX Text
ENVIRONMENTAL WORK AREA
AutoCAD SHX Text B112
AutoCAD SHX Text
MOTOR CONTROL
AutoCAD SHX Text
LIFT
AutoCAD SHX Text
STATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
AUTOMATION WING LIFT STATION LOCATION PLAN
M102
8' 0 8' 16'
SCALE: 1/8" = 1'-0"
3&4 M202
RW
1&2
1&2 M202
SEW
1&2
IS
SU
ED
F
OR
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
ZJX-1509594-M102
ARTCC
REPLACE SEWAGE AND STORM WATER
LIFT STATIONS AND PIPING
AUTOMATION WING LIFT STATION LOCATION PLAN
FL
100% DESIGN
GENERAL NOTES
1. COORDINATE ALL DEMOLITION AND INSTALLATION ACTIVITIES WITH COR.
2. ONLY ONE STORM WATER OR SEWAGE PUMP MAY BE TAKEN OUT OF SERVICE PRIOR TO TEMPORARY PUMP
SUCCESSFULLY COMPLETING A 48 HOUR PROVING PERIOD.
3. NEW PUMPS MUST COMPLETE A PROVING PERIOD OF AT LEAST 48 HOURS FOLLOWING INSTALLATION BEFORE
THE SECOND PUMP MAY BE TAKEN OUT OF SERVICE.
4. SCHEDULE SHUT DOWN OF SEWAGE PUMPS TO AVOID PERIODS OF HEAVY USAGE, SUCH AS SHIFT CHANGES AND BREAK TIMES. SCHEDULE SHUT DOWN OF STORM WATER PUMPS TO AVOID INCLEMENT WEATHER.
5. CLEAN DEMOLISHED PUMP EQUIPMENT AND PROTECT FLOORING TO SATISFACTION OF COR PRIOR TO
REMOVING DEMOLISHED MATERIAL
NOTES
1 DEMOLISHED MATERIAL FOR AUTOMATION WING LIFT STATIONS MUST BE REMOVED FROM THE BUILDING VIA THIS
AREAWAY. USE THIS AREAWAY TO BRING INSTALLATION MATERIALS INTO THE BUILDING.
DDCP-23 LOCATED ABOVE ON FIRST FLOOR. SEE M601 FOR POINTS TO BE ADDED AT THIS PANEL.
EXISTING 1" CONDUIT UP TO DDCP-23.
DEMOLISH EXISTING MOTOR CONTROL PANEL. PROVIDE AND INSTALL NEW MOTOR CONTROL PANEL.
EXISTING POWER FEEDS TO SEW-1&2 AND RW-1&2 FROM PANELS E-12-AA AND E-12-AB. SEE DRAWING E-102 FOR
ADDITIONAL DETAIL.
PNL E-12-AA
PNL E-12-AB
AutoCAD SHX Text
AutoCAD SHX Text D-D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L-L
AutoCAD SHX Text J-J
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
AREAWAY
AutoCAD SHX Text 14A
AutoCAD SHX Text
STAIR-D
AutoCAD SHX Text
STAIR-B
AutoCAD SHX Text
PUMP ROOM
AutoCAD SHX Text
SUMP ROOM
AutoCAD SHX Text B136
AutoCAD SHX Text B139
AutoCAD SHX Text 12A
AutoCAD SHX Text
ELECTRICAL DISTRIBUTION ROOM
AutoCAD SHX Text 13A
MECHANICAL EQUIPMENT ROOM
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
NOT TO SCALE
P-1 & P-2 SEWAGE PUMP INSTALLATION
M201
NOT TO SCALE
SEP-32A & SEP-32B SEWAGE PUMP INSTALLATION
M201
NOT TO SCALE
SEP-32A & SEP-32B SEWAGE PUMP DEMOLITION
M201
NOT TO SCALE
P-1 & P-2 SEWAGE PUMP DEMOLITION
M201
IS
SU
ED
F
OR
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
ZJX-1509594-M201
ARTCC
REPLACE SEWAGE AND STORM WATER
LIFT STATIONS AND PIPING
ADMIN WING LIFT STATION ELEVATIONS
FL
100% DESIGN
GENERAL NOTES
1. COORDINATE ALL DEMOLITION AND INSTALLATION ACTIVITIES WITH COR.
2. ONLY ONE STORM WATER OR SEWAGE PUMP MAY BE TAKEN OUT OF SERVICE PRIOR TO TEMPORARY PUMP
SUCCESSFULLY COMPLETING A 48 HOUR PROVING PERIOD.
3. NEW PUMPS MUST COMPLETE A PROVING PERIOD OF AT LEAST 48 HOURS FOLLOWING INSTALLATION BEFORE
THE SECOND PUMP MAY BE TAKEN OUT OF SERVICE.
4. SCHEDULE SHUT DOWN OF SEWAGE PUMPS TO AVOID PERIODS OF HEAVY USAGE, SUCH AS SHIFT CHANGES AND BREAK TIMES. SCHEDULE SHUT DOWN OF STORM WATER PUMPS TO AVOID INCLEMENT WEATHER.
5. CLEAN DEMOLISHED PUMP EQUIPMENT AND PROTECT FLOORING TO SATISFACTION OF COR PRIOR TO
REMOVING DEMOLISHED MATERIAL
NOTES
DEMOLISH LEVEL SWITCH, FLOAT, AND HARDWARE.
DEMOLISH EXISTING PUMP, MOTOR, HARDWARE, AND ADAPTERS.
DEMOLISH EXISTING CHECK VALVE AND ISOLATION VALVE UP TO FLANGE AT LIMIT OF DEMOLITION.
DEMOLISH EXISTING COVER. SUMP BASIN TO REMAIN.
INLET PIPING TO REMAIN. REMOVE AS REQUIRED TO DEMOLISH EXISTING COVER. IF THE REMOVED PIPING IS NOT ABLE TO BE REINSTALLED ONCE THE NEW COVER IS INSTALLED, INSTALL NEW SUMP INLET PIPING THAT EXTENDS 3" BELOW
TOP OF COVER.
PROVIDE AND INSTALL LEVEL SWITCH, FLOAT, AND HARDWARE.
PROVIDE AND INSTALL NEW PUMP, MOTOR, HARDWARE, AND ADAPTERS.
PROVIDE AND INSTALL CHECK VALVE, ISOLATION VALVE, AND OUTLET PIPING AS NEEDED TO CONNECT TO EXISTING
PIPING.
PROVIDE AND INSTALL NEW COVER. ENSURE THAT NEW COVER IS COMPATIBLE WITH EXISTING SUMP BASIN AND INLET
PIPING LOCATIONS.
PROVIDE AND INSTALL ULTRASONIC LEVEL SENSOR AND INTEGRATE WITH BUILDING DDCP SYSTEM. SEE POINTS
SCHEDULE ON P601.
AutoCAD SHX Text
FLOOR LEVEL
AutoCAD SHX Text
FLOOR LEVEL
AutoCAD SHX Text
FLOOR LEVEL
FLOOR LEVEL
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
NOT TO SCALE
SEW-1 & SEW-2 SEWAGE PUMP INSTALLATION
M202
NOT TO SCALE
RW-1 & RW-2 RAIN WATER PUMP INSTALLATION
M202
NOT TO SCALE
RW-1 & RW-2 STORM WATER PUMP DEMOLITION
M202
NOT TO SCALE
SEW-1 & SEW-2 SEWAGE PUMP DEMOLITION
M202
3 8
2 7
11 12
4 95
IS
SU
ED
F
OR
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
ZJX-1509594-M202
ARTCC
REPLACE SEWAGE AND STORM WATER
LIFT STATIONS AND PIPING
AUTOMATION WING LIFT STATION ELEVATIONS
FL
100% DESIGN
GENERAL NOTES
1. COORDINATE ALL DEMOLITION AND INSTALLATION ACTIVITIES WITH COR.
2. ONLY ONE STORM WATER OR SEWAGE PUMP MAY BE TAKEN OUT OF SERVICE PRIOR TO TEMPORARY PUMP
SUCCESSFULLY COMPLETING A 48 HOUR PROVING PERIOD.
3. NEW PUMPS MUST COMPLETE A PROVING PERIOD OF AT LEAST 48 HOURS FOLLOWING INSTALLATION BEFORE
THE SECOND PUMP MAY BE TAKEN OUT OF SERVICE.
4. SCHEDULE SHUT DOWN OF SEWAGE PUMPS TO AVOID PERIODS OF HEAVY USAGE, SUCH AS SHIFT CHANGES AND BREAK TIMES. SCHEDULE SHUT DOWN OF STORM WATER PUMPS TO AVOID INCLEMENT WEATHER.
5. CLEAN DEMOLISHED PUMP EQUIPMENT AND PROTECT FLOORING TO SATISFACTION OF COR PRIOR TO
REMOVING DEMOLISHED MATERIAL
NOTES
DEMOLISH LEVEL SWITCH, FLOAT, AND HARDWARE.
DEMOLISH EXISTING PUMP, MOTOR, HARDWARE, AND ADAPTERS.
DEMOLISH EXISTING CHECK VALVE AND ISOLATION VALVE UP TO FLANGE AT LIMIT OF DEMOLITION.
DEMOLISH EXISTING COVER. SUMP BASIN TO REMAIN.
INLET PIPING TO REMAIN. REMOVE AS REQUIRED TO DEMOLISH EXISTING COVER. IF THE REMOVED PIPING IS NOT ABLE TO BE REINSTALLED ONCE THE NEW COVER IS INSTALLED, INSTALL NEW SUMP INLET PIPING THAT EXTENDS 3" BELOW
TOP OF COVER.
PROVIDE AND INSTALL LEVEL SWITCH, FLOAT, AND HARDWARE.
PROVIDE AND INSTALL NEW PUMP, MOTOR, HARDWARE, AND ADAPTERS.
PROVIDE AND INSTALL CHECK VALVE, ISOLATION VALVE, AND OUTLET PIPING AS NEEDED TO CONNECT TO EXISTING
PIPING.
PROVIDE AND INSTALL NEW COVER. ENSURE THAT NEW COVER IS COMPATIBLE WITH EXISTING SUMP BASIN AND INLET
PIPING LOCATIONS.
PROVIDE AND INSTALL ULTRASONIC LEVEL SENSOR AND INTEGRATE WITH BUILDING DDCP SYSTEM. SEE POINTS
SCHEDULE ON P601.
DEMOLISH PRIMARY FLOAT SWITCH AND EMERGENCY FLOAT SWITCH.
PROVIDE AND INSTALL NEW PRIMARY AND EMERGENCY FLOAT SWITCHES.
AutoCAD SHX Text
FLOOR LEVEL
AutoCAD SHX Text
FLOOR LEVEL
AutoCAD SHX Text
FLOOR LEVEL
FLOOR LEVEL
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
ZJX-1509594-M601
ARTCC
REPLACE SEWAGE AND STORM WATER
LIFT STATIONS AND PIPING
LIST STATION PUMP SCHEDULE AND POINTS LIST
FL
100% DESIGN
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
DEMOLISH EXISTING BRANCH CIRCUIT WIRING AND CIRCUIT BREAKER. EXISTING CONDUIT TO REMAIN.
PROVIDE AND INSTALL NEW CIRCUIT BREAKER, AMP RATING AS INDICATED ON PANELBOARD SCHEDULE, TO FEED NEW EQUIPMENT. BREAKER SHALL MATCH EXISTING PANELBOARD MANUFACTURER TYPE AND AIC RATINGS
NOTES
1 2
1 2
1 2
IS
SU
ED
F
O R
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
ZJX-1509594-E102
ARTCC
REPLACE SEWAGE AND STORM WATER
LIFT STATIONS AND PIPING
PANEL SCHEDULES
FL
100% DESIGN
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
MCC-1A ONE-LINE
NTSE101
MCC-1B ONE-LINE
NTSE101
DEMOLISH EXISTING BRANCH CIRCUIT WIRING AND CIRCUIT BREAKER. EXISTING CONDUIT TO REMAIN.
PROVIDE AND INSTALL NEW CIRCUIT BREAKER, AMP RATING AS INDICATED ON PANELBOARD SCHEDULE, TO FEED NEW EQUIPMENT. BREAKER SHALL MATCH EXISTING PANELBOARD MANUFACTURER TYPE AND AIC RATINGS
NOTES
IS
SU
ED
F
O R
ED
M
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
DO NOT SIGN
ZJX-1509594-E101
ARTCC
REPLACE SEWAGE AND STORM WATER
LIFT STATIONS AND PIPING
MCC-1A & 1B ONE-LINE DIAGRAMS
FL
100% DESIGN
File details come from the government source that posted it. Updated .