This document is an amendment to a solicitation for the Replace Sewage and Storm Water Lift Stations and Piping at the Jacksonville ARTCC in Hilliard, FL. The key details are:

The proposal due date has been extended to July 9, 2024 at 5:00 p.m. Eastern Time. The RFI questions and answers are provided. The work includes replacing the sewage and storm lift gate stations and piping at the facility. This is a small business set-aside with a NAICS code of 237110. The price range is $500,000 to $1,000,000 and payment/performance bonds are required. A site visit is scheduled for March 26, 2024. All RFIs must be submitted at least 5 days prior to the proposal due date. Offers are due via email by the amended due date, unless further amended.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 1

0003 03/11/2024

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1701 COLUMBIA AVENUE

COLLEGE PARK GA 30337

AAQ510ATL-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x

697DCK-24-R-00196

copies to the issuing office.

03/11/2024

(x)

Amendment 0003 is issued for the following changes:

1. The proposal due date is extended until July 9, 2024 at 5:00 p.m. Eastern Time.

2. The attached RFI questions and answers are hereby provided.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Susan J. Newcomb

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Replace Sewage/Storm Water Li� Sta�on Project RFIs and Answers

1. Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals? Or can one individual triple hat and perform all 3 roles?

The Superintendent and QC manager can be the same person, however, the Site Safety Health

Officer needs to be someone who's primary job is to be the site safety person and has to be

30hr OSHA trained.

2. Are there any phasing requirements? Can mul�ple pumps be tagged out to perform work at the same �me?

A general construc�on sequence is established for all work inside of the building on drawing ZJX-1509594-G003, which outlines that work must be completed on one li� sta�on prior to beginning work on the next li� sta�on.

Work in the electrical manholes outside does not fall under this general sequence, but coordina�on with the facility’s other ongoing projects and available construc�on administra�on personnel may limit the number of simultaneous pump replacements.

3. Can the period of performance be extended a�er award once the material/equipment lead �mes are confirmed due to current market condi�ons for the equipment for this project?The period of performance starts once the No�ce to Proceed is issued not the award date. The NTP will be issued once material/equipment is either ordered or a delivery date has been established.