XXXX-cost-schedule~1.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Camp Washoe Gas Upgrade
- Solicitation number
- 43ADG-S4017
- Issued by
- Nevada
About this file
This is a cost schedule template for a state and local contract opportunity with the Nevada Army National Guard involving the Camp Washoe Gas Upgrade project. The project encompasses trenching and restoration of polyethylene gas supply lines at the Nevada Army National Guard's Camp Washoe facility located in Nevada. The cost schedule template contains 16 line items for vendors to complete with proposed pricing, along with a separate line for estimated annual travel costs. Vendors are responsible for ensuring all calculations are accurate and complete the shaded areas with their proposed pricing based on the Line Description and term, unit Price, Estimated Usage, and Extended cost columns.
The template allows for travel to be billed as a billable cost under the contract at then-current General Services Administration (GSA) rates as referenced on gsa.gov. The vendor must calculate the estimated project value based on the completed line items and travel cost estimates. The spreadsheet format requires vendors to input unit pricing and usage estimates, with the system calculating extended costs for each line item to arrive at a total estimated project value for this gas upgrade initiative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Certification-regarding-lobbying~6.pdf | ||
| XXXX-site-visit-registration-20XX-XX-XX~1.pdf | ||
| Standard-form-contract~3.docx | DOCX document | |
| GEA_16~1.PDF | ||
| Camp Washoe Google Maps.pdf | ||
| Terms-and-conditions-for-services~5.pdf | ||
| Quote Instructions.pdf | ||
| Request for Proposal~1.pdf | ||
| SOW CW Gas Service Upgrade.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost schedule
| XXXX cost schedule | |||||
| Vendor | |||||
| Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct. | |||||
| Line | Description and term | Type | Price | Est. Usage | Extended |
| 1 | $ - 0 | ||||
| 2 | $ - 0 | ||||
| 3 | $ - 0 | ||||
| 4 | $ - 0 | ||||
| 5 | $ - 0 | ||||
| 6 | $ - 0 | ||||
| 7 | $ - 0 | ||||
| 8 | $ - 0 | ||||
| 9 | $ - 0 | ||||
| 10 | $ - 0 | ||||
| 11 | $ - 0 | ||||
| 12 | $ - 0 | ||||
| 13 | $ - 0 | ||||
| 14 | $ - 0 | ||||
| 15 | $ - 0 | ||||
| 16 | Estimated travel costs | per year | 4 | $ - 0 | |
| Estimated project value | $ - 0 | ||||
| Travel is allowed as a billable costs of this contract, at then current GSA rates. | |||||
| gsa.gov |
&"Times New Roman,Italic"&10Page &P of &N http://www.gsa.gov/
File details come from the government source that posted it. Updated .