This is a scope of work document for the City of Douglas, Georgia's renovation project of WW2 Hangar #3 (South Hangar), managed by the joint venture of Harper & Company Builders, Inc. and Charles E. Lewis Construction Co., Inc. The project encompasses comprehensive roofing and building envelope renovations including removal and replacement of existing eave and rake flashing, installation of new galvalume PBR roof sheets with hat channel support systems and vinyl-backed batt insulation, replacement of gutters and downspouts at radiused roof areas, repair of a leaning pocket enclosure at the northeast corner, and replacement of a missing door header roof-to-wall flashing. Additional scope includes removal and replacement of damaged EPDM and shingle roofing systems down to original decking, installation of TPO roofing systems with polyisocyanurate insulation and required flashings, exterior pressure washing, surface preparation, caulking, and painting of all existing exterior surfaces excluding roof panels. Competitive sealed proposals from qualified subcontractors are due Thursday, June 18, 2026, at 2:00 PM at City of Douglas City Hall, 302 S. Madison Ave., Douglas, Georgia.

The solicitation targets subcontractors qualified in three specific proposal packages: 7A for pre-engineered metal building roofing and trim, 7B for TPO roofing and trim, and 9A for painting and caulking. The project is part of a larger FY26 renovation initiative that includes both Hangar #2 (North Hangar) and Hangar #3 (South Hangar). All removed materials must be disposed of off-site, and work must comply with OSHA fall protection standards and manufacturer specifications for all roofing systems. The document includes detailed specifications for flashing installations, insulation requirements, material gauges, and fastening methods across multiple roof areas and configurations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

E

S

W

Notes:

1) Dispose of all removed material off-site (Typical)

2) Provide fall protection per OSHA standards.

3) Make every effort to ensure materials and tools are not dropped through existing roof to remain onto existing equipment and workers underneath existing roof.

Remove/Dispose of existing eave/rake flashing at existing radiused roof area.

Install new eave/rake flashing, gutters, downspouts at radiused roof area.

Remove/Dispose of existing PBR roof panels and steel backup plates over radiused roof.

Original roof sheets to remain.

Install 0'-8" long, 16 ga, 1 1/2" tall hat channel spaced at 3'-0" oc on top of existing original roof sheets to remain. Fasten 0'-8" hat channel, perpendicular, through existing original roof sheets, into existing steel purlins above barrel trusses. Attach each hat channel to purlin with 4 each self-tapping screws.

Install continuous 20 ga, 1 1/2" tall hat channel on top of 0'-8" hat channel, directly above existing steel purlins.

Install 3" vinyl backed batt roof insulation between new retrofit roof sheets and exisitng original roof sheets to remain.

Install new 26 ga, 3'-0" wide, galvalume, PBR roof sheets over existing radiused roof.

Painting:

1) Pressure wash existing building.

2) Prep exterior surfaces for new paint.

3) Caulk/Paint all existing exterior surfaces

4) Do not paint existing/new roof panels.

Remove/replace roof to wall flashing at existing chimney.

Remove/Replace existing gutters/ downspouts at lower TPO roof

Dispose of existing shingle roof down to wood deck and mechanically install a coverboard and fully adhered 60 mil TPO roof system.

Remove/Replace existing roofing trim.

Tear off existing damaged EPDM roof and OSB plywood decking down to original PBR roof panel.

Funish and install loose laid flue filled insulation and mechanically fasten a 1" polyisocyanurate insulation Over the insulation, install a 60 mil TPO Rhino Bond roof system per manufacturer's instructions to include all required flashings.

Remove/Replace existing roof trim.

Hangar #3 (South Hangar)

At Northeast corner, repair existing pocket enclosure that is leaning.

Jeffrey Harper Line

Jeffrey Harper Line

Jeffrey Harper Line

Jeffrey Harper Line

Jeffrey Harper Line

Jeffrey Harper Line

Jeffrey Harper Line

Jeffrey Harper Line

Replace existing missing door header roof to wall flashing.

Hangar #3 (South Hangar)

Hangar #3 (South Hangar)

Install new gutters/downspouts at radiused roof eaves.

Downspouts shall discharge horizontally onto lower roofs.

Both eaves, typical.

Tear off existing damaged EPDM roof and OSB plywood decking down to origianl PBR roof panel.

Furnish and install loose laid flue filled insulation and mechanically fasten a 1" polyisocanurate insulation.

Over the insulation, install a 60 mil TPO Rhino bond roof system per manufacturers instructions to include all required flashings.

Remove/Replace existing roof associated roof trim.

Dispose of existing shingle roof down to wood deck and mechanically install a coverboard and fully adhered 60 mil TPO roof system.

Remove/Replace existing roofing trim.

Remove / Replace existing gutters / downspouts at lower TPO roof

Jeffrey Harper Line

Jeffrey Harper Line

Jeffrey Harper Line

Install new gutters/downpouts at radiused roof eaves.

Downspouts shall discharge horizontally onto lower roofs.

Both radiused roof eaves, typical

Remove/Replace roof to wall flashing at chimney

Jeffrey Harper Line

Jeffrey Harper Line

Jeffrey Harper Cross-Out

Jeffrey Harper Inserted Text

N E

SW

ES

South Hangar Page 1
South Hangar Page 2
South Hangar

File details come from the government source that posted it. Updated .