Addendum No. 2 to MassDOT Worcester Pedestrian and Bicycle Improvements Contract
This is Addendum No. 2 to the contract documents for the Massachusetts Department of Transportation's pedestrian and bicycle improvements project on Pleasant Street in Worcester, Federal Aid Project No. STP/HPP-0033(047)X. The addendum, issued July 17, 2026, transmits revisions to multiple contract documents including the Table of Contents (Document 00010), Notice to Contractors (Document 00104), Supplemental Specifications (Document 00715), Required Contract Provisions for Federal-Aid Construction Contracts (Document 00760), and Price Adjustment for Structural Steel and Reinforcing Steel (Document 00813). The project involves approximately 1.4 miles of roadway improvements including mill and overlay work, buffered bicycle lanes, new sidewalk construction (4,075 linear feet), three rectangular rapid flashing beacon assemblies, granite curbing (1,378 linear feet), drainage improvements including four new catch basins and 126 drainage-structure adjustments, tree trimming (1,430 linear feet), traffic control elements including over 28,000 linear feet of pavement markings, and utility coordination. The proposal opening date is Tuesday, July 28, 2026, at 2:00 p.m., and bidders must acknowledge receipt of Addendum No. 2 in their proposal submission. The estimated contract value is $3.925 million, with work restricted to 7:30 a.m. to 4:00 p.m., Monday through Friday, with no lane closures during peak hours.
The addendum makes substantial revisions to technical specifications covering milled rumble strips (Types A through D), traffic signal detection systems including vehicle and pedestrian detectors, power pedestals for electrical distribution, connected work zone notification systems with location markers and connected arrow boards, and preformed expansion joint fillers for concrete applications. Price adjustments apply to unfabricated structural steel and reinforcing steel based on the U.S. Department of Labor Bureau of Labor Statistics Producer Price Index, with adjustments only made when variances exceed 5% from base prices established at bid opening. The base steel price index for this contract is 370.1, with specific base prices listed for various steel types ranging from $0.52 per pound for AREA 140 LB rail to $4.61 per pound for Type 316 stainless steel. Prevailing wage rates apply to the project, with labor participation goals of 15.3% for minorities and 6.9% for women. The project is subject to environmental compliance requirements including protection for northern long-eared bats and tricolored bats, with tree removal prohibited from June 1 through August 15, and falls within the Asian Longhorned Beetle Eradication Program Regulated Boundary, with associated ALB compliance costs required to be included in bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 610535 - Notice to Contractors.pdf | ||
| A00808-610535.pdf | ||
| A00820-610535.pdf | ||
| WORCESTER-610535-134928-A-1.pdf | ||
| A00809-610535.pdf | ||
| A00861-610535.pdf | ||
| 610535 - Plan Holders List 7-27-2026.pdf | ||
| Link to Bid Opening 7-28-2026~1.pdf | ||
| A00801-610535.pdf | ||
| BIDS OPENED - Tuesday - July 28-2026.pdf | ||
| 610535 Bid Items List.txt | TXT text file | |
| A00860-610535.pdf | ||
| A00816-610535.pdf | ||
| A00811-610535.pdf | ||
| 610535 - Plan Holders List 7-15-2026.pdf | ||
| 610535 - Bid Tabulations.pdf | ||
| A00802-610535~1.pdf | ||
| A00862-610535.pdf | ||
| A00870-610535.pdf | ||
| A00875-610535.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot
July 17, 2026
610535-134928
ADDENDUM NO. 2
To Prospective Bidders and Others on:
WORCESTER
Federal Aid Project No. STP/HPP-0033(047)X
Pedestrian and Bicycle Improvements on Pleasant Street
THIS PROPOSAL TO BE OPENED AND READ: TUESDAY, JULY 28, 2026, at 2:00 P.M.
Transmitting revisions to the Contract Documents as follows:
DOCUMENT 00010: Revised page 1.
DOCUMENT 00104: Revised page 3.
DOCUMENT 00715: Deleted document in its entirety inserted new document (20 pages).
DOCUMENT 00760: Deleted document in its entirety inserted new document (12 pages).
DOCUMENT 00813: Deleted document in its entirety inserted new document (4 pages).
DOCUMENT B00420: Revised page 14.
Please take note of the above, substitute the revised pages for the originals, delete the documents indicated and insert the new documents in proper order, and acknowledge Addendum No. 2 in your Expedite Proposal file before submitting your bid.
Very truly yours, Eric M. Cardone, P.E.
Construction Contracts Engineer
JPB
cc: Adetoyin A. Olaoye, Project Manager
THIS PAGE INTENTIONALLY LEFT BLANK
Massachusetts Department Of Transportation Highway Division Proposal No. 610535-134928
00010 - 1
DOCUMENT 00010 TABLE OF CONTENTS
DOCUMENT 00010
TABLE OF CONTENTS ........................................................................................................... 00010-1 through 2
DOCUMENT 00104
NOTICE TO CONTRACTORS ................................................................................................ 00104- 1 through 4
DOCUMENT 00210
REQUIREMENTS OF MASSACHUSETTS GENERAL
LAWS CHAPTER 30 SECTION 39R; CHAPTER 30, SECTION 39O ................................... 00210-1 through 4
DOCUMENT 00331
LOCUS MAP ............................................................................................................................. 00331-1 through 2
DOCUMENT 00439
CONTRACTOR PROJECT EVALUATION FORM ................................................................ 00439-1 through 2
DOCUMENT 00440
SUBCONTRACTOR PROJECT EVALUATION FORM ........................................................ 00440-1 through 2
DOCUMENT 00710
GENERAL CONTRACT PROVISIONS ................................................................................... 00710-1 through 2
DOCUMENT 00715
SUPPLEMENTAL SPECIFICATIONS .................................................................................. 00715-1 through 20
DOCUMENT 00760
REQUIRED CONTRACT PROVISIONS FOR FEDERAL-AID
CONSTRUCTION CONTRACTS ........................................................................................... 00760-1 through 12
DOCUMENT 00811
MONTHLY PRICE ADJUSTMENT FOR HOT MIX ASPHALT
(HMA) MIXTURES ................................................................................................................... 00811-1 through 2
DOCUMENT 00812
MONTHLY PRICE ADJUSTMENT FOR DIESEL FUEL AND GASOLINE ........................ 00812-1 through 2
DOCUMENT 00813
PRICE ADJUSTMENT FOR STRUCTURAL STEEL
AND REINFORCING STEEL .................................................................................................. 00813-1 through 4
DOCUMENT 00814
PRICE ADJUSTMENT FOR PORTLAND CEMENT CONCRETE MIXES .......................... 00814-1 through 2
DOCUMENT 00820
THE COMMONWEALTH OF MASSACHUSETTS
SUPPLEMENTAL EQUAL EMPLOYMENT OPPORTUNITY,
NON-DISCRIMINATION AND AFFIRMATIVE ACTION PROGRAM ............................... 00820-1 through 6
DOCUMENT 00821
ELECTRONIC REPORTING REQUIREMENTS
CIVIL RIGHTS PROGRAM AND CERTIFIED PAYROLL ................................................... 00821-1 through 2
DOCUMENT 00859
CONTRACTOR/SUBCONTRACTOR CERTIFICATION FORM .......................................... 00859-1 through 2
DOCUMENT 00860
COMMONWEALTH OF MASSACHUSETTS PUBLIC EMPLOYMENT LAWS ................ 00860-1 through 2
DOCUMENT 00861
STATE PREVAILING WAGE RATES .................................................................................. 00861-1 through 34
Addendum No. 2, July 17, 2026
00104 - 3
NOTICE TO CONTRACTORS (Continued)
PRICE ADJUSTMENTS
This Contract contains price adjustments for hot mix asphalt and Portland cement mixtures, diesel fuel, and gasoline. For reference the base prices are as follows: liquid asphalt $712.50 per ton, Portland cement $452.13 per ton, diesel fuel $3.911 per gallon, and gasoline $3.136 per gallon, and Steel Base Price Index 370.1. MassDOT posts the Price Adjustments on their Highway Division’s website at https://www.mass.gov/massdot-contract-price-adjustments
This Contract contains Price Adjustments for steel. See Document 00813 - PRICE ADJUSTMENT FOR STRUCTURAL STEEL AND REINFORCING STEEL for their application and base prices.
MassDOT projects are subject to the rules and regulations of the Architectural Access Board (521 CMR 1.00 et seq.)
Prospective bidders and interested parties can access this information and more via the internet at
WWW.COMMBUYS.COM.
BY: Phillip Eng, Interim MassDOT Secretary Jonathan L. Gulliver, Undersecretary and Highway Administrator
SATURDAY, JUNE 27, 2026
Massachusetts Department of Transportation Highway Division
00715 - 1
DOCUMENT 00715
| SUPPLEMENTAL | SPECIFICATIONS | |
| JUNE | 30, | 2026 |
| The | 2026 | Standard | Specifications | for | Highways | and | Bridges | are | amended | by | the | following | modifications, |
| additions | and | deletions. | These | Supplemental | Specifications | prevail | over | those | published | in | the | Standard |
Specifications.
| The | Specifications | Committee | has | issued | these | Supplemental | Specifications | for | inclusion | into | each | |||
| proposal | until | such | time | as | they | are | updated | or | incorporated | into | the | next | Standard | Specifications. |
Contractors are cautioned that these Supplemental Specifications are dated and will change as they are updated.
DIVISION I
GENERAL REQUIREMENTS AND COVENANTS
| SECTION | 5.00: | CONTROL | OF | WORK | |||||||||||
| Subsection | 5.03: | Conformity | with | Plans | and | Specifications | |||||||||
| Change | the | MGL | reference | in | the | first | sentence | to | Chapter | 30, | Section | 39I | (from | Section | 39L). |
DIVISION II
CONSTRUCTION DETAILS
SECTION 200: DRAINAGE
SUBSECTION 227: DRAINAGE SYSTEM SEDIMENT
| Subsection | 227.30, | Method | of | Measurement | |
| Change | the | subsection | number | to | 227.80 |
| Subsection | 227.31, | Basis | of | Payment | |
| Change | the | subsection | number | to | 227.81 |
| Subsection | 227.31, | Payment | Items | ||
| Change | the | subsection | number | to | 227.82 |
| SECTION | 400: | SUB‐BASE, | BASE | COURSE, | SHOULDERS, |
| PAVEMENT | AND | BERMS |
SUBSECTION 430: CEMENT CONCRETE BASE COURSE
| Subsection | 430.40: | General | ||||||
| Change | Applied | Crack | Sealer | to | Hot | Applied | Crack | Sealer. |
00715 - 2
SUBSECTION 476: CEMENT CONCRETE PAVEMENT
| Subsection | 476.20: | Materials | ||||||||||||||
| Delete | Preformed | Bituminous | Joint | Filler | for | Concrete | ‐ | M3.05.5 | and | add | the | following | in | M | number | sequence: |
Preformed Expansion Joint Filler M9.14.0
SUBSECTION 477: MILLED RUMBLE STRIPS
| Subsection | 477: | Milled | Rumble | Strips | |
| Replace | this | subsection | with | the | following: |
DESCRIPTION
477.20: General
| The | work | consists | of | constructing | rumble | strips | on | roadways | by | milling | grooves | into | finished | surfaces. | Milled | |||||
| Rumble | Strips | are | categorized | as | Type | A, | Type | B, | Type | C, | or | Type | D. | Type | A | are | rectangular | milled | grooves | at |
| regular | intervals | in | the | paved | surface, | Type | B | rumble | strips | are | rectangular | grooves | at | regular | intervals | with | ||||
| designed | gaps | between | intervals | to | accommodate | bicyclists, | and | Type | C | and | Type | D | rumble | strips | form | |||||
| continuous | grooves | in | the | paved | surface | in | the | form | of | a | vertical | sinusoidal | wave | pattern. |
CONSTRUCTION METHODS
477.61: Equipment
The equipment shall self‐align with the slope of the roadway surface and/or any irregularities in the roadway surface.
| The | Contractor | shall | demonstrate | to | the | Engineer | the | ability | to | achieve | the | desired | groove | without | tearing | or |
| snagging | the | roadway | surface | prior | to | beginning | the | work. |
477.62: Installation of Rumble Strips
Rumble strips shall be installed in accordance with the locations, dimensions, and Type shown on the plans.
| Type | A | and | Type | B | rumble | strips | shall | be | installed | after | the | longitudinal | pavement | markings | they | supplement | ||||
| (typically | edge | lines | or | channelizing | lines) | are | in | place. | Installation | of | any | diagonal | or | chevron | pavement | |||||
| markings | that | cross | the | Type | A | or | Type | B | rumble | strips | shall | only | occur | after | the | rumble | strips | are | in | place. |
| Type | C | rumble | strips | shall | be | installed | after | the | location | of | the | longitudinal | pavement | markings | they |
| supplement | (typically | center | lines) | has | been | laid | out, | but | before | the | pavement | markings | are | installed. | The |
| pavement | markings | shall | only | be | installed | after | the | Type | C | rumble | strips | are | in | place. |
| Type | D | rumble | strips | shall | be | installed | after | the | longitudinal | pavement | markings | they | supplement | (typically |
| center | lines) | are | in | place. |
477.63: Control of the Work Area
| At | the | end | of | each | working | day, | all | equipment | shall | be | moved | to | a | location | where | it | does | not | present | a | hazard |
| to | traffic. | The | pavement | shall | be | cleaned | by | sweeping | and | the | work | area | shall | be | reopened | to | traffic. |
Pavement millings shall become the property of the Contractor and shall be removed and disposed of off‐site.
COMPENSATION
477.80: Method of Measurement
| Milled | Rumble | Strip | (Type | A), | Milled | Rumble | Strip | (Type | C), | and | Milled | Rumble | Strip | (Type | D) | will | be | |
| measured | by | the | total | length | of | installed | rumble | strip. | Milled | Rumble | Strip | (Type | B) | will | be | measured | by | the |
| total | length | of | installed | rumble | strip | excluding | the | designed | gaps. | Breaks | at | castings, | bridge | decks, | ||||
| intersections | or | other | breaks | will | not | be | measured | for | payment | for | all | types. |
00715 - 3
477.81: Basis of Payment
| Payment | for | Milled | Rumble | Strip | (Type | A), | Milled | Rumble | Strip | (Type | B), | Milled | Rumble | Strip | (Type | C), | and | ||
| Milled | Rumble | Strip | (Type | D) | will | be | made | at | the | contract | unit | price | per | foot | of | rumble | strips, | complete | in |
| place. | Such | payment | will | be | full | compensation | for | furnishing | all | equipment | and | labor | for | satisfactorily | |||||
| performing | the | work | including | cleanup | and | disposal | of | excess | materials. |
477.82: Payment Items
Item number Description Unit
477. Milled Rumble Strip (Type A) Foot
477.1 Milled Rumble Strip (Type B) Foot
477.2 Milled Rumble Strip (Type C) Foot
477.3 Milled Rumble Strip (Type D) Foot
SUBSECTION 482: SAWCUTTING
| Subsection | 482.80: | Method | of | Measurement | |
| Replace | this | subsection | with | the | following: |
Sawcutting, when included in the Contract as its own bid item, will be measured for payment by the foot along the cut line, regardless of depth.
SECTION 600: HIGHWAY GUARD, FENCES AND WALLS
SUBSECTION 628: IMPACT ATTENUATORS
| Subsection | 628.82: | Payment | Items | ||
| Replace | this | subsection | with | the | following: |
Item number Description Unit
628.302 Permanent Impact Attenuator, Non‐Redirective, TL‐2 Each
628.303 Permanent Impact Attenuator, Non‐Redirective, TL‐3 Each
628.304 Temporary Impact Attenuator, Non‐Redirective, TL‐2 Each
628.305 Temporary Impact Attenuator, Non‐Redirective, TL‐3 Each
628.312 Permanent Impact Attenuator, Redirective, TL‐2 Each
628.313 Permanent Impact Attenuator, Redirective, TL‐3 Each
628.314 Temporary Impact Attenuator, Redirective, TL‐2 Each
628.315 Temporary Impact Attenuator, Redirective, TL‐3 Each
628.322 Permanent Impact Attenuator, Low‐Maintenance, TL‐2 Each
628.323 Permanent Impact Attenuator, Low‐Maintenance, TL‐3 Each
00715 - 4
SECTION 800: TRAFFIC CONTROL DEVICES
SUBSECTION 813: WIRING, GROUNDING AND SERVICE CONNECTIONS
| Subsection | 813.20: | General | |||
| Replace | this | subsection | with | the | following: |
| This | work | shall | consist | of | furnishing | and | installing | wire | and | cable | of | the | type | and | size | indicated | for | traffic |
| signals | and | other | traffic | control | devices, | ITS | systems, | highway | lighting | and | related | electrical | systems, | |||||
| equipment | grounding | systems, | new | ground | electrodes | or | connections | to | existing | ground | electrodes, | power | ||||||
| pedestals, | and | all | materials | and | equipment | necessary | to | deliver | power | to | such | systems. |
| Service | points | shown | on | the | plans | are | approximate | only. | The | Contractor | shall | determine | exact | locations | for |
| both | overhead | and | underground | service | access | points. | The | Contractor | shall | determine | riser | elevations | or | ||
| connections/routing | to | manhole | facilities | from | the | serving | utility, | and | arrange | to | complete | the | service |
connections.
All work under this Subsection shall comply with the MEC and the National Electrical Safety Code.
| Subsection | 813.41: | Grounding | and | Bonding | Conductions |
| Replace | this | subsection | with | the | following: |
| Grounding | and | bonding | conductors | shall | conform | to | M8.16.10: | Type | 10 | Grounding | and | Bonding | Conductors |
| (Solid | or | Stranded, | Insulated | or | Bare). |
| Subsection | 813.42: | Ground | Rods | ||
| Replace | this | subsection | with | the | following: |
| Ground | rods | shall | consist | of | driven | rod(s) | conforming | to | M8.17.0: | Ground | Rod | or | other | devices | approved | for |
| the | purpose. |
| Subsection | 813.44: | Power | Pedestal | ||
| Add | this | subsection | in | numerical | order: |
| A | Power | Pedestals | shall | consist | of | a | side‐of‐post | mounted | lockable | load | center | enclosure, | a | load | center | with |
| circuit | breakers, | an | exterior‐mounted | electrical | meter, | signal | post | and | base, | equipment | bonding, | ground | ||||
| rod(s) | conforming | to | 813.42: | Ground | Rods, | and | a | cement | concrete | foundation. | The | enclosure, | lock, | circuit | ||
| breakers, | signal | post | and | base, | and | foundation | shall | all | be | included | in | the | Shop | Drawing | submission. |
| The | enclosure | shall | be | rated | to | meet | or | exceed | NEMA | 3R | and | be | suitable | for | post‐mounting | and | shall | be | sized |
| appropriately | to | house | the | load | center. | The | enclosure | shall | be | capable | of | being | secured | with | an | integrated | |||
| locking | mechanism | or | by | a | Contractor‐supplied | padlock; | regardless | of | locking | mechanism, | it | shall | be | ||||||
| operated | with | a | #2 | key. |
| The | circuit | breakers | shall | be | designed | for | single‐phase, | 3‐wire, | 120/240 | VAC. | Circuit | breakers | shall | provide | a | ||
| means | to | manually | operate | a | circuit | and/or | automatically | open | a | circuit | that | is | in | overload | or | short | circuit |
| conditions. | All | circuit | breakers | shall | be | UL | listed | and | have | CSA | certification. |
| The | enclosure | shall | be | furnished | with | a | meter | socket | installed. | The | meter | socket | shall | be | approved | by | the |
| servicing | electrical | utility. |
| The | signal | post | and | base | shall | conform | to | M10.05.1: | Signal | Posts | and | Bases | and | the | Plans. | The | Contractor | |
| shall | supply | a | square | aluminum | base | with | a | natural | or | anodized | finish | and | a | Schedule | 80 | aluminum | post | with |
| a | brushed | or | spun | finish, | unless | otherwise | indicated | in | the | Plans. |
| The | Contractor | shall | supply | mounting | equipment | recommended | by | the | enclosure | manufacturer | to | side‐ |
| mount | the | cabinet | to | the | post. |
Bonding for the Power Pedestal shall utilize a #8 AWG or larger ASTM‐B3 wire.
00715 - 5
| The | cement | concrete | foundation | shall | conform | to | the | Plans | and | M4.02.0: | Concrete | Produced | by | Stationary |
| and | Truck | Mixers, | M4.03.0: | Concrete | Produced | by | Volumetric | Mixers, | M4.06.1: | Conventional | Concrete, | |||
| M4.09.0: | Precast, | Prestressed, | and | Prefabricated | Concrete | Products, | M4.11.0: | Evaporation | Reducing | |||||
| Materials, | and | M4.12.0: | Curing | Materials, | as | applicable. |
| Subsection | 813.64: | Power | Pedestal | ||
| Add | this | subsection | in | numerical | order: |
No work shall commence until Shop Drawings have been approved.
| The | Power | Pedestal | Cabinet | shall | be | mounted | side‐of‐post | to | the | Signal | Post, | per | the | manufacturer's |
| recommendations. | The | Power | Pedestal | Cabinet | should | be | installed | directly | below | the | meter | socket, | per | the |
| Plans. | If | dissimilar | metals | are | present, | they | shall | be | electrically | insulated | to | prevent | galvanic | corrosion. |
| The | Contractor | shall | supply | the | appropriate | type | (single | pole | or | double | pole) | and | number | of | circuit | breakers | |
| included | within | the | Power | Pedestal | Cabinet | to | provide | the | recommended | AC | power | to | each | device | receiving | ||
| power | from | the | Cabinet. | The | circuit | breakers | shall | be | clearly | labeled | as | to | which | device | they | are | powering |
| (e.g. | RRFB‐1, | RRFB‐2, | Warning | Beacon, | Speed | Feedback | Sign, | etc.). |
| The | Power | Pedestal | shall | be | grounded | and | bonded | per | 813.61: | Equipment | Grounding | and | Bonding | and |
| 813.62: | Grounding | Electrodes. |
| Subsection | 813.80.E: | Power | Pedestal | ||
| Add | this | subsection | in | numerical | order: |
Power Pedestals will be measured by the number of Power Pedestals each furnished and installed.
| Subsection | 813.81.E: | Power | Pedestal | ||
| Add | this | subsection | in | numerical | order: |
| Power | Pedestals | will | be | paid | for | at | the | contract | unit | price | for | each | installed | in | place. | This | includes | all | labor |
| and | materials | required | for | a | working | system. |
All costs associated with grounding and bonding of Power Pedestals shall be considered incidental to the item.
| All | costs | associated | with | providing | service | connections | to | Power | Pedestals | shall | be | paid | for | under | their |
| respective | pay | items. |
| Subsection | 813.82: | Payment | Items | ||||||||||||||
| Change | the | unit | of | measure | for | items | 813.80 | and | 813.81 | to | Each | and | add | the | following | pay | item: |
| Subsection | 815.82: | Payment | Items | |||||||||||
| Delete | payment | items | 818.90 | to | 818.94, | 819.39, | 819.832, | 819.52, | 819.53, | 819.60 | to | 819.64, | 819.70, | 819.71, |
| 819.72, | 819.800, | 819.801, | 819.802, | 819.803,:819.810, | 819.811, | 819.820, | 819.821, | 819.850, | 819.851, | 819.852. |
Add the following payment item:
813.90 Power Pedestal Each
00715 - 6
SUBSECTION 819: TRAFFIC SIGNAL DETECTION
| Subsection | 819: | Traffic | Signal | Detection |
| Add | this | subsection: |
DESCRIPTION
819.20: General
| Work | under | this | Subsection | consists | of | furnishing | and | installing | detection | devices | for | vehicles, | bicycles, |
| pedestrians, | and | other | road | users. |
MATERIALS
819.40: General
Materials shall meet the requirements specified in the following Subsections of Division III, Materials:
Material Section
Vehicle Detection Systems M10.08.0
Passive Stop Line Detectors M10.08.1
Passive Advanced Detectors M10.08.2
Pedestrian Detectors M10.09.0
Pedestrian Pushbutton Assembly M10.09.1
APS Pushbutton Assembly M10.09.2
The Contractor shall furnish Vehicle Detection Systems (VDS) and Pedestrian Detectors that are listed on the
QTCE.
| Any | software, | firmware, | cables, | or | adapters | required | to | program, | adjust, | fine‐tune, | or | monitor | VDS | or | |
| Pedestrian | Detectors | shall | be | provided | by | the | Contractor. | VDS | and | Pedestrian | Detectors | shall | have | the | latest |
| versions | of | software | and/or | firmware | installed | prior | to | inspection. | Manufacturer | updates | to | software | and/or | ||
| firmware | shall | be | included | at | no | cost | for | the | life | of | the | products. |
819.40.A: Vehicle Detection Systems
| A | VDS | shall | consist | of | one | or | more | Internet | Protocol | (IP) | ‐based | detector/sensor | assemblies | and | a | cabinet |
| interface | device | that | is | installed | in | a | Traffic | Signal | Controller | Cabinet | or | similar | device. |
| Stop | Line | VDS | shall | be | capable | of | providing | motor | vehicle | and | bicycle | detection | at | all | locations | shown | on | the |
| Plans. | The | Contractor | may | furnish | a | VDS | that | utilizes | a | single | detector/sensor | or | multiple, | as | long | as | all | stop |
| line | motor | vehicle | and | bicycle | detection | zones | are | encompassed | and | the | traffic | signal | or | other | device | utilizing | ||
| the | detection | can | operate | per | the | Plans. | All | Passive | Stop | Line | Detectors | required | to | provide | stop | line | ||
| detection | at | an | intersection | shall | be | included | in | the | cost | of | a | single | Stop | Line | Vehicle | Detection | System. |
| If | the | Contractor | furnishes | a | Stop | Line | VDS | that | does | not | utilize | an | integrated | video | monitoring | system, | a |
| separate | video | monitoring | system | per | 819.41: | Video | Monitoring | System | shall | be | furnished | and | installed | at | no | ||
| additional | cost. |
| Advanced | VDS | shall | be | capable | of | providing | motor | vehicle | detection | on | a | single | approach, | at | the | location | |
| shown | on | the | Plans. | The | Contractor | Shall | furnish | Passive | Advanced | Detectors | that | utilize, | and | are | compatible | ||
| with, | the | same | interface | device | installed | in | the | Traffic | Signal | Controller | Cabinet, | or | similar | device, | as | the | Stop |
| Line | VDS. |
00715 - 7
All VDSs shall be furnished with manufacturer‐supplied mounting hardware.
| If | multiple | VDSs | over | multiple | locations | are | supplied | under | a | single | contract, | all | components | furnished | by | the |
| Contractor | shall | be | of | the | same | make | and | model. |
819.40.B: Pedestrian Detectors
| Pedestrian | Pushbutton | Assembly | and | Accessible | Pedestrian | Signal | (APS) | Pushbutton | Assembly | shall | both | |||||
| include | a | pushbutton, | sign, | housing, | manufacturer‐specified | mounting | hardware, | and | wiring. | The | Contractor | |||||
| shall | review | the | Contract | Documents | to | determine | if | one | or | more | in‐cabinet | control | units | are | required | to |
| meet | the | pedestrian | detector | type | and | operational | requirements. | In‐cabinet | control | units | shall | be | considered | |||
| incidental | to | the | cost | of | the | item. |
| The | Contractor | shall | provide | a | pushbutton | housing | that | conforms | to | the | shape | of | the | pole | it | is | mounted | to | or |
| shall | furnish | and | install | a | manufacturer‐supplied | saddle | to | provide | a | flush, | secure | fit, | at | no | additional | cost. |
| An | APS | Pushbutton | Assembly | shall | include | a | pedestrian | pushbutton | sign | that | conforms | to | the | Plans. | If | the |
| sign | is | not | integral | to | the | housing, | separate | mounting | equipment | shall | be | furnished | and | installed | by | the |
| Contractor. | All | costs | associated | with | the | sign | and | mounting | equipment | shall | be | considered | incidental | to | the | |
| cost | of | the | item. |
819.41: Video Monitoring System
| When | required | by | 819.40.A: | Vehicle | Detection | Systems, | the | Contractor | shall | furnish | and | install | a | Video | |
| Monitoring | System. | The | Video | Monitoring | System | shall | consist | of | one | or | more | IP‐based | 4K, | 1080p, | H.264 |
| dome‐type | CCTV | cameras; | mounting | hardware, | including | but | not | limited | to: | brackets, | bands, | straps, | posts, | ||
| plates, | and | pole | mount | adapters; | power | distribution | and | conditioning | equipment | including | surge | ||||
| suppression; | and | all | necessary | cabling | and | wiring. |
| All | equipment | provided | for | the | Video | Monitoring | System | shall | be | commercial, | off‐the‐shelf | products. | Custom | ||
| equipment | designed | specifically | for | the | Contract | will | not | be | accepted. | All | cabling | and | wiring | shall | be |
| recommended | by | the | manufacturer | and | rated | for | outdoor | use. | Any | special | wiring | or | connectors | required | by |
| the | manufacturer | shall | be | identified | in | the | Shop | Drawings. |
| The | Video | Monitoring | System | shall | conform | to | National | Electrical | Manufactures | Association | (NEMA) | ||||
| standards, | Underwriters’ | Laboratory | (UL), | and | Military | Standards | (MIL), | as | applicable. | All | components | of | the | ||
| Video | Monitoring | System | shall | be | new | and | still | under | production | by | the | manufacturer. | Obsolete, | no | longer |
| produced, | and/or | no | longer | supported | components | will | not | be | accepted. |
The Video Monitoring System shall be capable of operating in temperatures ranging from ‐29Ԭ to +165Ԭ.
The camera shall meet or exceed the requirements found in Table 819.41‐1:
Table 819.41‐1: Minimum Camera Requirements
Feature Requirement
Zoom Ratio The minimum zoom ratio shall be 30x Optical and 12x Digital
Camera Type The camera shall be an IP‐type CCTV camera.
| Auto | Focus | The | camera | shall | include | auto | focus | with | a | selection | for | manual | override | of |
| auto | focus. |
Lens Aperture Ratio Typical: F/1.6 to F/4.7 (wide to telephoto)
On‐Screen Direction The CCTV camera shall display on‐screen azimuth indications.
| Privacy | Zones | The | CCTV | camera | shall | be | programmable | to | blank | out | up | to | 8, | four‐sided | areas |
| to | electronically | block | portions | of | the | camera’s | field | of | view | from | being |
00715 - 8
Feature Requirement
| displayed. | These | privacy | zones | shall | move | and | adjust | sizing | synchronously |
| with | camera | movements | and | degree | of | lens | zooming. |
| On‐Screen | Labels, | Text |
| and | Titles |
| The | CCTV | camera | shall | display | a | minimum | of | 20 | programmable | characters | for |
| on‐screen | camera | ID, | preset | position, | sector, | and | alarm | titles. |
| On‐Screen | Labels, | Text |
| and | Title | Positioning |
| The | position | of | the | on‐screen | text | shall | be | adjustable | to | appear | at | selectable |
| positions | on | the | CCTV | camera | screen | image. |
| Number | of | Pixels | The | camera | shall | provide | a | minimum | of | 1280H | x | 720V | effective | pixels. | The |
| camera | shall | be | capable | of | being | configured | to | operate | at | all | standard | lower | |||
| resolutions | down | to | 320H | x | 180V | effective | pixels. |
Image Sensor Size The camera shall include an image sensor of 1/1.8 in., nominal.
Lens Focal Length The camera shall include a zoom lens of 4.3 mm to 129 mm, minimum focal length.
| Color | and | Black | & | White |
| Image | Selection |
| The | camera | shall | have | Color | and | Black | & | White | video | image | display | modes | |
| incorporating | both | automatic | and | manual | override | image | mode | selection. | The | ||||
| camera | shall | transition | automatically | to | a | Black | & | White | mode | (when | in | ||
| automatic | mode) | when | the | luminance | level | reaches | a | user | predefined | ||||
| threshold. | At | all | times | the | camera | shall | provide | a | full | motion | video | output | at |
| 30 | frames | per | second. |
| Image | Stabilization | The | CCTV | camera | shall | incorporate | electronic | image | stabilization | to | reduce |
| the | effects | of | vibration | and | wind | gusts | on | the | displayed | video | image. |
| Automatic | Iris | The | camera | shall | include | both | automatic | iris | control | and | an | override | for |
| manual | iris | adjustments. |
Wide Dynamic Range The CCTV camera’s wide dynamic range shall be 120 dB.
CCTV Camera Optical Sensitivity
| The | camera’s | sensitivity | shall | be | sufficient | to | provide | a | clear, | usable | color | |||
| video | image | display | with | a | scene | illumination | of | ≤ | 0.1 | lux | at | an | aperture | of |
| F1.6, | nominal. |
Power Input The power input for the CCTV camera and dome shall be PoE+.
Alarms No alarm contacts shall be wired.
| The | Contractor | shall | mount | the | camera | at | a | location | that | optimizes | line‐of‐sight | for | all | approaches. | The | view | |||
| of | each | approach | shall | have | a | clear | line | of | sight, | free | from | obstructions | from | trees, | overhead | wires, | buildings, | ||
| and/or | other | obstructions. | If | the | Contractor | is | unable | to | provide | a | clear | line | of | sight | for | all | approaches | to | the |
| satisfaction | of | the | Engineer, | a | second | camera, | including | mounting | hardware, | cabling, | and | wiring, | shall | be | |||||
| furnished | and | installed | on | a | different | traffic | signal | structure | at | no | additional | cost. |
The Contractor shall be responsible for the following items prior to installation:
| Ensure | that | all | components | are | assembled | and | factory‐tested | prior | to | delivery | to | the | project | site. |
| Fully | configure | the | camera | settings, | including | but | not | limited | to: | camera | resolution, | camera | address, |
| default | settings, | and | pre‐set | and | home | positions, | per | the | direction | of | the | Engineer. | ||
| Coordinate | with | the | Engineer | to | set | the | camera | address | number | to | provide | unique | identification | that |
is compatible with the CCTV camera addressing schema utilized by the Department.
The Contractor shall deliver the camera(s) fully assembled to the project site.
00715 - 9
| The | Contractor | shall | provide | up | to | 3 | hard | copy | sets | of | operating | manuals, | service | manuals, | and | maintenance | ||
| instructions | for | all | components | of | the | system. | At | the | request | of | the | Engineer, | the | number | of | copies | may | be |
| reduced | if | the | manuals | are | provided | in | file | format. |
819.42: Material Warranties
| All | components | of | Vehicle | Detection | Systems, | including | Video | Monitoring | Systems, | and | Pedestrian | Detectors | |
| shall | include | a | minimum | two‐year | manufacturer’s | replacement | warranty | that | will | commence | upon | ||
| acceptance | by | the | Engineer. | The | warranty | shall | cover | any | manufacturing | defects | of | the | products. |
Construction Methods
819.60: General
| The | Contractor | shall | use | discretion | in | installing | the | detectors/sensors | at | locations | that | optimize | the | ||||||
| performance | of | the | VDS | and | to | eliminate | false | calls. | The | Contractor | shall | notify | the | Engineer | if | the | size | or | |
| location | of | the | detection | zones | differs | from | what | is | shown | in | the | Plans. | At | the | direction | of | the | Engineer, | the |
| Contractor | will | be | required | to | readjust | the | location | of | the | detection | zones | and/or | modify | the | detection | ||||
| channels | if | false | calls | are | observed | or | the | traffic | signal | system | is | not | operating | per | the | Plans | due | to | the |
| performance | of | the | VDS; | this | work | shall | be | considered | incidental | to | the | cost | of | the | item. |
| The | Contractor | shall | use | manufacturer‐specified | mounting | hardware | for | all | detectors/sensors. | If | mounted | to | ||||
| mast | arms | or | strain | poles, | any | addition | weight | or | wind | loading | from | the | detector/sensor | shall | be | accounted |
| for | in | the | structural | calculations. |
| The | Contractor | shall | install | the | cabinet | interface | device | in | the | traffic | signal | controller | cabinet. | The | cabinet | ||
| interface | device | shall | be | connected | to | the | Field | Monitoring | Unit | (FMU) | or | an | ethernet | switch | in | the | traffic |
| signal | controller | cabinet. | All | communication | between | devices | shall | be | IP‐based. | Use | of | external | |||||
| communications | that | are | not | routed | through | the | FMU | is | prohibited. |
| The | Contractor | shall | furnish | and | install | low | voltage | power | cabling | surge | protection | equipment | required | for |
| all | data | and | power | lines | associated | with | VDS, | Video | Monitoring | Systems, | and/or | Pedestrian | Detection | |
| Systems | entering | the | traffic | signal | controller | cabinet. |
| The | Contractor | shall | install | the | manufacturer‐specified | cable | between | the | detectors/sensors | to | the | cabinet | ||||
| interface | device | in | the | traffic | signal | controller | cabinet | via | traffic | signal | structures, | conduit, | and/or | pullboxes. | ||
| This | shall | include | all | connectors, | sealing | tape, | and | incidental | work | to | complete | the | connection(s). | All | ||
| equipment | installation | and | wiring | shall | be | installed | in | a | neat | and | orderly | manner | and | per | the | manufacturer’s |
specifications.
| The | VDS | shall | be | powered | through | one | of | the | power | outlets | available | on | the | FMU. | The | VDS | shall | be | capable | of |
| being | powered | down | and | remotely | restarted | through | remote | control | of | the | power | outlet | on | the | FMU. |
| Under | the | supervision | of | the | Engineer, | the | Contractor | shall | install | the | VDS | software | that | allows | visual |
| confirmation | of | the | detection | zones | on | Department | computers. |
The Contractor shall install Pedestrian Detectors at the location(s) and mounting height shown on the Plans.
| The | Contractor | shall | mount | and | orient | the | APS | Pushbutton | Assembly | in | a | manner | so | that | the | vibrotactile |
| arrow | is | aligned | parallel | to | the | crosswalk. |
| Prior | to | acceptance, | the | Contractor | shall | furnish | all | passwords | for | Vehicle | Detection | Systems | and | Pedestrian |
| Detectors | to | the | Engineer. | The | use | of | default | passwords | is | prohibited. |
00715 - 10
819.61: Programming APS Pushbuttons
| Each | APS | Pushbutton | shall | have | an | audible | walk | indication | during | the | associated | walk | interval. | The | duration | ||||
| of | the | audible | walk | indication | shall | match | the | duration | of | the | walk | interval | unless | the | pedestrian | signal | is | ||
| programmed | to | rest | in | walk. | If | programmed | to | rest | in | walk, | the | audible | walk | indication | shall | be | limited | to | 7 |
| seconds | in | length | but | may | be | recalled | by | a | subsequent | button | press | during | the | walk | interval. |
| The | APS | Pushbutton | locator | tone | and | audible | walk | indication | shall | be | programmed | to | broadcast | at | volume | 5 | |
| dBA | louder | than | ambient | sound, | except | when | audible | beaconing | is | provided | in | response | to | an | extended | ||
| pushbutton | press. | The | broadcast | volume | shall | be | programmed | to | not | exceed | 100 | dBA | at | 3 | ft. | from | the |
| emitter, | regardless | of | ambient | noise | conditions. |
The locator tone shall have a duration of 0.15 seconds or less and shall repeat at 1‐second intervals.
The locator tone shall be active during all signal intervals, except for the following conditions:
| When | the | audible | walk | indication | is | being | broadcast. | ||||||||||||
| If | the | signal | is | programmed | to | rest | in | walk, | the | locator | tone | shall | resume | 7 | seconds | after | the | start | of |
| the | walk | interval. | ||||||||||||||
| The | locator | tone | shall | be | disabled | if | the | traffic | control | signal | or | pedestrian | hybrid | beacon | is | operating |
in an emergency or fault flashing mode.
| The | locator | tone | shall | be | active | during | the | flashing | yellow | and | alternating | flashing | red | intervals | of | a |
| pedestrian | hybrid | beacon | phasing | sequence. |
| Upon | button | press, | the | locator | tone | at | that | pushbutton | shall | be | interrupted | and | a | speech | message | of | “Wait” |
| shall | be | broadcast. |
| The | normal | status | of | the | pilot | light | shall | be | dark. | The | pilot | light | shall | illuminate | upon | button | press | and | stay |
| illuminated | until | the | start | of | the | walk | interval, | when | it | shall | return | to | dark. | If | the | associated | pedestrian | phase | |
| is | set | to | pedestrian | recall, | the | pilot | light | shall | stay | illuminated | for | all | intervals | except | for | the | walk | interval. |
| The | audible | walk | indication | shall | an | audible | tone | unless | a | speech | message | is | called | for | in | the | Plans. | The |
| audible | tone | shall | repeat | at | 8 | to | 10 | ticks | per | second, | in | multiple | frequencies, | with | the | dominant | component | at |
| 880 | Hz. |
If a speech message is used, the following shall apply:
| For | exclusive | pedestrian | phases, | during | the | walk | interval | the | speech | message | shall | be: | “walk | sign | is |
| on | for | all | crossings.” | This | message | shall | be | broadcast | a | single | instance. |
| *For | concurrent | pedestrian | phases, | during | the | walk | interval | the | speech | message | shall | be: | “[STREET | ||
| NAME]. | Walk | sign | is | on | for | [STREET | NAME].” | This | message | shall | be | broadcast | a | single | instance. |
| If | the | signal | is | programmed | to | rest | in | walk, | the | concurrent | pedestrian | speech | message | shall | be |
| repeated | upon | each | subsequent | button | press. |
*Note: See Plans for Street Name information.
The vibrotactile arrow shall vibrate during the walk interval.
| The | Contractor | shall | include | a | fault | relay | that | will | default | to | placing | a | constant | pedestrian | call | from | any |
| pushbutton | assembly | that | fails | to | communicate | back | to | the | in‐cabinet | control | unit. |
| The | Contractor | shall | connect | the | in‐cabinet | control | unit | to | the | Field | Monitoring | Unit | (FMU) | via | an | open |
| ethernet | port. |
00715 - 11
819.62: VDS Testing and Evaluation
| After | the | VDS | is | installed, | but | prior | to | acceptance, | the | Contractor | shall | conduct | an | evaluation | of | the | system | in |
| the | presence | of | the | Engineer. | The | purpose | of | the | evaluation | is | to | certify | the | system | is | operating | per | the |
| requirements | of | M10.08.0: | Vehicle | Detection | Systems, | M10.08.1: | Passive | Stop | Line | Detectors, | and | M10.08.2: | ||||||
| Passive | Advanced | Detectors, | as | applicable. | The | Contractor | shall | submit | their | testing | and | evaluation | plan | as | a | |||
| part | of | the | Shop | Drawing | submittal. |
| The | testing | and | evaluation | shall | take | place | for | a | minimum | of | 30 | minutes | under | moderate | live | traffic |
| conditions. | Testing | shall | not | be | conducted | during | inclement | weather. |
| If | the | Engineer | determines | that | the | system | does | not | meet | the | operational | requirements, | the | Contractor | will | |||
| be | required | to | adjust | the | location, | orientation, | and/or | number | of | detector/sensors. | The | Contractor | may | also | ||||
| adjust | the | location | of | the | detection | zones | at | this | time. | Upon | completion | of | this | work, | the | system | shall | be |
| reevaluated | in | the | presence | of | the | Engineer. | This | process | shall | be | repeated | until | the | operational | ||||
| requirements | are | met. |
| All | costs | associated | with | testing | and | evaluation | of | the | VDS, | including | the | repositioning | or | addition | of | new |
| materials, | shall | be | considered | incidental | to | the | item. |
Compensation
819.80: Method of Measurement
Stop Line Vehicle Detection Systems will be measured as each system furnished and installed.
Advanced Vehicle Detection Systems will be measured as each system furnished and installed.
Pedestrian Pushbuttons and APS Pushbuttons will be measured as each pushbutton furnished and installed.
819.81: Basis of Payment
| Stop | Line | Vehicle | Detection | Systems | will | be | paid | for | each | system | installed | at | an | intersection. | For | the | purposes |
| of | this | work, | an | intersection | shall | be | defined | as | all | roadway, | path, | and/or | trail | approaches | controlled | by | a |
| single | traffic | signal | controller. | Where | a | Video | Monitoring | System | is | required | per | 819.40: | General, | it | shall | be | |
| included | in | the | cost | of | Item | 819.840. |
Advanced Vehicle Detection System will be paid for each system installed on an intersection approach.
| Pedestrian | Pushbutton | and | APS | Pushbutton | will | be | paid | for | each | pushbutton | assembly | installed. | The |
| pedestrian | sign | mounted | directly | above | the | pushbutton | shall | be | considered | incidental | to | the | item. |
| The | unit | cost | of | each | vehicle | detection | system | or | pushbutton | item | shall | include | all | wiring, | cabling, | mounting |
| hardware, | software, | firmware, | video | monitoring | system | (if | required), | testing, | calibrating, | Department | ||||||
| Acceptance, | training, | and | all | other | labor | and | materials | required | for | the | system(s) | to | operate | per | the | Plans. |
819.82: Payment Items
Item number Description Unit
819.840 Stop Line Vehicle Detection System Each
819.845 Advanced Vehicle Detection System Each
819.850 Pedestrian Pushbutton Each
819.855 APS Pushbutton Each
00715 - 12
| SUBSECTION | 850: | TRAFFIC | CONTROLS | FOR | CONSTRUCTION | AND |
| MAINTENANCE | OPERATIONS |
| Subsection | 850.25: | Arrow | Board |
| Subsection | 850.45: | Arrow | Board |
| Subsection | 850.65: | Arrow | Board |
| Delete | these | subsections. |
| Subsection | 850.80: | Method | of | Measurement | |||||||
| Delete | the | 7th | paragraph | beginning | with | “Arrow | Board | will | be | measured | …” |
| Subsection | 850.81: | Basis | of | Payment | ||||||||
| Delete | the | 7th | paragraph | beginning | with | “Arrow | Board | will | be | paid | for | …” |
| Subsection | 850.82: | Payment | Items | ||||||||||||
| Revise | description | and | unit | of | item | 852. | to | Safety | Signing | for | Traffic | Management | / | Square | Foot. |
| Delete | item | number | 856. |
| SUBSECTION | 856: | CONNECTED | WORK | ZONE | NOTIFICATION | SYSTEM | AND |
| ASSOCIATED | DEVICES |
| Subsection | 856: | Connected | Work | Zone | Notification | System | and | Associated | Devices |
| Add | this | new | subsection. |
DESCRIPTION
856.20: General
| The | Connected | Work | Zone | Notification | System | (CWZNS) | is | a | system | of | field | devices | that | transmit | real‐time | |
| location‐based | data | about | work | zones. | CWZNS | field | device | data | is | provided | in | a | Work | Zone | Data | Exchange |
| (WZDx) | Device | Feed | in | accordance | with | the | United | States | Department | of | Transportation | (USDOT) | WZDx | |||
| Specification. | The | Device | Feed | is | consumed | by | the | MassDOT | Work | Zone | Manager | (WZM) | application. |
| The | Contractor | shall | be | responsible | for | furnishing, | installing, | repositioning, | operating, | maintaining, | and |
| removing | these | CWZNS | devices. |
MATERIALS
856.40: General
Materials shall meet the requirements specified in the following Subsections of Division III, Materials:
Material Section
Connected Work Zone Notification System Devices M10.18.0
Location Marker M10.18.1
Connected Arrow Board M10.18.2
| End | Location | Markers | shall | conform | to | M10.18.1: | Location | Marker | and | include | power | and | communication |
| status | lights | and | an | on/off | switch. |
856.41: Arrow Board
| Arrow | Boards | shall | consist | of | a | matrix | of | yellow | elements | that | may | be | illuminated | in | flashing | or | sequential |
| patterns, | on | a | non‐reflective, | black | background. | The | light | output | from | the | Arrow | Board | shall | meet | the | ||
| minimum | legibility | distance, | per | the | MUTCD. | The | elements | shall | be | capable | of | at | least | 50% | dimming | from | full |
| brilliance | to | avoid | nighttime | glare. | Arrow | Boards | that | are | continuously | operational | in | both | daylight | and | |||
| nighttime | conditions | shall | automatically | adjust | the | light | output | based | upon | ambient | light | conditions. |
The mounting height of the Arrow Board, when in operation, shall be per the Plans.
00715 - 13
The minimum dimensions and number of elements for Arrow Boards shall be per Table 856.41‐1.
Table 856.41‐1: Arrow Board Dimensions and Elements
| Item | Numbers | |
| MUTCD | Type Minimum | Dimensions |
| (width | by | height) |
| Minimum | Number | of |
Elements
| 856.060, | 856.160 | ||||
| B | 60 | in. | by | 30 | in. 13 |
| 856.096, | 856.196 | ||||
| C | 96 | in. | by | 48 | in. 15 |
Arrow Boards shall be capable of the following operating modes, per the MUTCD:
| Four | Corners | Flashing | Caution | |
| Alternating | Diamond | Caution | ||
| Flashing | Arrow | (left | or | right) |
| Sequential | Chevron | (left | or | right) |
| Flashing | Double | Arrow |
| Arrow | Boards | that | are | categorized | as | “Connected | Arrow | Boards” | (Items | 856.160 | and | 856.196) | shall | meet | the |
| requirements | of | M10.18.2: | Connected | Arrow | Board | in | addition | to | the | requirements | of | an | Arrow | Board | |
| described | in | this | Subsection. |
856.42: Shop Drawings
| Within | 30 | days | of | the | Notice | to | Proceed, | the | Contractor | shall | submit | to | the | Engineer | for | review | and | approval |
| cut | sheets | for | each | model | of | CWZNS | device | to | be | used. | The | cut | sheets | shall | document | device | specifications, | |
| including | details | of | how | the | CWZNS | device | will | communicate. | Work | that | requires | the | use | of | CWZNS | devices | ||
| shall | not | commence | until | the | submission | has | been | approved. |
CONSTRUCTION METHODS
856.60: General
| At | least | 15 | days | prior | to | deploying | CWZNS | devices, | the | Contractor | shall | visit | the | site | to | verify | cellular |
| coverage. | If | the | devices | the | Contractor | plans | to | deploy | do | not | have | coverage, | the | Contractor | shall | swap | out |
| the | cellular | modem, | SIM | card, | or | both | to | a | carrier | that | provides | coverage. | If | no | adequate | cellular | coverage |
| exists | from | 4G | LTE | or | 5G | providers, | the | Contractor | shall | immediately | notify | the | Engineer. |
The Contractor shall install CWZNS devices at the locations shown on the Plans.
| Per | the | WZDx | Specification | Device | Feed, | an | End | Location | Marker | shall | have | a | single | MarkedLocation | with | the |
| “type” | property | as | “work‐zone‐end”. |
| The | Contractor | shall | install | and | power | on | the | End | Location | Marker | coinciding | with | the | deployment | of | the | ||
| temporary | traffic | control | setup | that | calls | for | its | use. | The | Contractor | shall | power | down | and | remove | the | ||
| Location | Marker | at | the | conclusion | of | the | removal | of | the | temporary | traffic | control | setup. | If | the | location | of | the |
| work | moves | during | a | work | shift, | the | Contractor | shall | power | down | the | Location | Marker, | relocate | it, | and | then | |
| power | it | back | on. |
| The | operating | mode | for | the | Arrow | Board | or | Connected | Arrow | Board | shall | be | per | the | Plans. | When | activated, |
| the | minimum | element | on‐time | shall | be | 50% | for | the | flashing | mode, | with | equal | intervals | of | 25% | for | each |
| sequential | phase. | The | flashing | rate | shall | be | not | less | than | 25 | or | more | than | 40 | flashes | per | minute. |
| If | a | Connected | Arrow | Board | is | being | used | to | transmit | its | location | without | utilizing | other | arrow | board |
| functions, | such | as | operating | a | Flashing | Arrow, | the | arrow | board | shall | remain | dark | and | removed | from | the |
| roadway | or | protected | from | approaching | traffic | while | the | data | is | being | transmitted. |
| The | Contractor | shall | be | responsible | for | remediating | any | CWZNS | device | that | is | not | operating | as | specified, | at |
| no | additional | cost | to | the | Department. |
00715 - 14
| CWZNS | devices | that | are | lost, | stolen, | vandalized, | damaged, | destroyed, | or | deemed | unacceptable | while | their | use | |||
| is | required | on | the | project | shall | be | replaced | by | the | Contractor | at | no | additional | cost | to | the | Department. |
COMPENSATION
856.80: Method of Measurement
| Arrow | Boards | and | Connected | Arrow | Boards | will | be | measured | by | the | Day. | Each | period | of | up | to | 24 | hours | |
| during | which | an | Arrow | Board | or | Connected | Arrow | Board | is | in | use | will | be | measured | as | one | day, | regardless | of |
| the | number | of | times | that | the | unit | is | positioned, | repositioned, | removed, | or | returned | to | service. |
| End | Location | Markers | will | be | measured | by | the | Day. | Each | period | of | up | to | 24 | hours | during | which | a | End | |
| Location | Marker | is | in | use | will | be | measured | as | one | day, | regardless | of | the | number | of | times | that | the | unit | is |
| positioned, | repositioned, | removed, | or | returned | to | service. |
856.81: Basis of Payment
| Arrow | Boards | and | Connected | Arrow | Boards | will | be | paid | for | at | the | contract | unit | price | per | day | which | shall |
| include | full | compensation | for | labor | and | materials, | positioning, | repositioning, | and | removing | or | returning | to |
service.
| End | Location | Markers | will | be | paid | for | at | the | contract | unit | price | per | day | which | shall | include | full | compensation |
| for | labor | and | materials, | positioning, | repositioning, | and | removing | or | returning | to | service. |
| If | an | End | Location | Marker | is | attached | to | another | traffic | control | device | that | is | not | otherwise | called | for | in | the |
| Plans | or | Specifications, | that | ancillary | device | shall | be | considered | incidental | to | the | cost | of | the | End | Location |
Marker.
| Licenses, | fees, | communication | costs, | power | costs, | and | access | to | real‐time | and | recorded | data | associated | with | |
| the | Device | Feed | for | CWZNS | devices | shall | be | considered | incidental | to | the | cost | of | the | item. |
The Department will not pay for CWZNS devices that fail to operate as specified.
856.82: Payment Items
Item number Description Unit
856.060 Arrow Board (Type B) Day
856.096 Arrow Board (Type C) Day
856.160 Connected Arrow Board (Type B) Day
856.196 Connected Arrow Board (Type C) Day
856.201 End Location Marker Day
SECTION 900: STRUCTURES
SUBSECTION 901: CEMENT CONCRETE
| Subsection | 901.20: | Materials | |||||||||||||||
| Delete | Asphaltic | Materials | – | M3, | Preformed | Bituminous | Fiber | Joint | Filler | – | M3.05.3 | and | add | the | following | in | M |
| number | sequence: |
Preformed Expansion Joint Filler M9.14.0
00715 - 15
SUBSECTION 983: REVETMENT
| Subsection | 983.40: | General | |||||||||||||
| Delete | Preformed | Bituminous | Fiber | Joint | Filler | – | M3.05.3 | and | add | the | following | in | M | number | sequence: |
Preformed Expansion Joint Filler M9.14.0
DIVISION III
MATERIALS SPECIFICATIONS
SECTION M3: ASPHALTIC MATERIALS
| Subsection | M3.05.5: | Preformed | Bituminous | Joint | Filler | for | Concrete |
| Delete | this | subsection. |
SECTION M9: MISCELLANEOUS MATERIALS
| Subsection | M9.14.0: | Preformed | Expansion | Joint | Filler |
| Replace | this | subsection | with | the | following: |
| Preformed | expansion | joint | filler | for | concrete | applications | and | structural | construction | shall | meet | the | ||||
| requirements | specified | herein. | The | Contractor | shall | provide | certified | test | data | which | documents | compliance | ||||
| with | the | required | physical | properties. | The | certified | test | data | shall | be | submitted | to | the | Engineer | for | approval. |
Table M9.14.0‐1: Types of Preformed Expansion Joint Filler
Speciϐication Type and Description
| AASHTO | M | 153 | |||
| Type | I | – | Sponge | Rubber | |
| Type | II | – | Cork | ||
| Type | III | – | Self‐Expanding | Cork | |
| Type | IV | – | Polyurethane‐Bonded | Recycled | Rubber |
| AASHTO | M | 213 | ||||||||
| Type | I | – | Asphalt‐Saturated | Cellulosic | Fiber | |||||
| Type | II | – | Asphalt | Binder‐Cork | with | Asphalt‐Saturated | or | Glass | Fiber | Felt |
| Type | III | – | Polyurethane‐Bonded | Recycled | Rubber |
| ASTM | D1752 | |||
| Type | IV | – | Recycled | PVC |
| ASTM | D7174 | |||||||
| Type | I | – | Closed‐Cell | Polyethylene | or | Blended | Polyethylene | Foam |
| ASTM | D8139 | ||||
| Type | I | – | Closed‐Cell | Polypropylene | Foam |
| Subsection | M9.14.2: | Closed | Cell | Foam | Joint | Filler |
| Delete | this | subsection: |
M10.03.1: Field Monitoring Unit
| All | Field | Monitoring | Units | (FMU) | shall | be | compatible | with | the | MassDOT | Critical | Operations | Multi‐ |
| jurisdictional | Modular | System | (MCOMMS), | cloud‐based | management | system. |
| Subsection | M9.14.2: | Closed | Cell | Foam | Joint | Filler |
| Delete | this | subsection: |
00715 - 16
SECTION M10: TRAFFIC CONTROL DEVICES
| Subsection | M10.03.1: | Field | Monitoring | Unit |
| Add | these | new | subsections: |
M10.03.1: Field Monitoring Unit
| All | Field | Monitoring | Units | (FMU) | shall | be | compatible | with | the | MassDOT | Critical | Operations | Multi‐ |
| jurisdictional | Modular | System | (MCOMMS), | cloud‐based | management | system. |
| FMUs | shall | be | capable | of | operating | independently | from | the | brand | of | traffic | signal | controller, | vehicle | and |
| pedestrian | detection | systems, | battery | backup | system | (BBS), | and | any | other | Ethernet‐based, | web | accessible | |||
| device | present | in | the | traffic | signal | controller | cabinet. |
M10.03.1.A: Hardware
| The | FMU | shall | communicate | via | an | Ethernet | port | with | an | RJ45 | connector | and | have | an | integrated | Ethernet |
| switch | with | a | minimum | of | four | ports. |
| The | FMU | shall | be | powered | via | standard | 120 | VAC | input | power. | The | FMU | shall | include | an | integrated | battery | |
| and | battery | charging/monitoring | circuit | that | will | allow | the | FMU | to | fully | function | even | if | all | other | electrical | ||
| service | to | the | cabinet | has | been | interrupted. | The | battery | shall | continue | to | supply | the | FMU | with | power | for | a |
| minimum | of | 5 | hours | on | a | single | charge. |
| The | FMU | shall | have | an | integrated | GPS | that | will | allow | for | automated | telemetry | without | additional | ||||
| configuration. | The | GPS | shall | be | capable | of | providing | a | time | sync | pulse | to | the | internal | clock | of | a | connected |
| traffic | signal | controller. | The | FMU | shall | utilize | the | integrated | GPS | to | geolocate | itself | on | a | map | via | the | FMU |
| management | software. |
M10.03.1.B: Software
| The | configuration | of | the | FMU | shall | be | accomplished | by | accessing | FMU | management | software | via | an | internet |
| browser. | It | shall | be | possible | to | configure | the | FMU | without | any | special | software. |
| The | FMU | shall | operate | without | requiring | a | static | IP | address. | The | only | configuration | required | at | the | FMU | is | to |
| enter | the | URL | to | the | host | of | the | FMU | management | software. |
| The | FMU | shall | utilize | HTTPS | protocols | and | XML | data | structure | for | communications | with | the | FMU |
| management | software. | The | data | shall | be | scalable | for | future | expansion; | proprietary | protocols | shall | not | be |
used.
M10.03.1.C: Wireless Connectivity
The FMU shall be supplied with an internal 4G LTE cellular modem.
| The | modem | shall | support | future | upgrades | to | 5G | service, | when | available, | and | shall | be | compatible | with | SIM |
| cards | from | multiple | cellular | carriers. |
M10.03.1.D: Remote Access
| Remote | access | to | any | traffic | signal | cabinet | component | that | has | a | web | interface | via | the | FMU | shall | not | require |
| the | end | user | to | create | a | separate | Virtual | Private | Network | (VPN) | connection. |
| Subsection | M10.08.0: | Vehicle | Detection | Systems |
| Subsection | M10.08.0: | Vehicle | Detection | Systems |
| Subsection | M10.08.0: | Vehicle | Detection | Systems |
| Add | theses | new | subsections: |
M10.08.0: Vehicle Detection Systems
| Vehicle | Detection | Systems | (VDS) | shall | be | capable | of | detecting | the | presence | of | all | motor | vehicle | types | and |
| bicycles | in | designated | areas | and | sending | corresponding | detector | outputs | to | a | traffic | signal | controller. |
00715 - 17
All in‐cabinet components of VDS shall be compatible with the following standards:
| • | ATCC | 5301 | v02 | |
| • | ATC | 5201 | v06 | |
| • | NEMA | TS2 | environmental | standards |
| Through | an | ethernet‐based | connection | to | the | detection | module | and/or | cabinet | interface | device | in | the | field | or |
| through | the | internal | network | of | the | traffic | signal | controller | cabinet, | the | VDS | shall | support | remote | |
| management | of | motor | vehicle | and | bicycle | detection | configurations | and | access | to | data | including: |
| • | The | number, | location, | and | size | of | detection | zones. | |||
| • | Configuration | of | the | detector | channel | and | assigned | phase | for | each | zone. |
| • | Configuration | of | detection | zones | for | signal | performance | measurement | data | collection. | |
| • | The | ability | to | add | and | remove | users. | ||||
| • | Signal | performance | data: |
| o | Monitoring | and | recording | the | status | of | the | phase | and | detector | channels | from | the | traffic | signal | ||||
| controller | through | the | SIU | bus | at | a | frequency | of | no | less | than | 10 | times | per | second. | ||||
| o | Estimation | of | the | speed | of | vehicles | at | defined, | user‐configurable | points, | such | as | entering | or | |||||
| exiting | a | detection | zone. | ||||||||||||||||
| o | Retrieval | of | the | signal | performance | data | through | an | http‐based | Application | Programming | ||||||||
| Interface | (API), | or | equivalent | process, | in | .xml, | .json, | or | .csv | format. | |||||||||
| o | The | data | shall | be | available | in | a | per | vehicle | format, | be | viewable | in | real | time, | and | store | at | least |
| 168 | hours | of | data | locally | on | the | device. |
VDS shall be capable of supporting user‐based restrictions to limit functionality, including:
| • | The | ability | to | make | changes | to | the | VDS | settings. |
| • | The | ability | to | view | imagery | or | digital | video | streams. |
| • | The | ability | to | view | and | download | signal | performance | data. |
| VDS | shall | be | capable | of | automatically | determining | if | the | system’s | ability | to | accurately | detect | vehicles | and |
| shall | default | to | a | constant | call | state | if | this | system | error | is | detected. |
VDS shall be capable of classifying vehicles based upon length and/or number of axles.
This is the start of the file's text. The full file is on GovTribe.