A00801-610535.pdf

PDF 690 KB Posted

Attached to
610535 WORCESTER FAP No. STP/HPP-0033(047)X Pedestrian and Bicycle Improvements on Pleasant Street
Solicitation number
BD-27-1030-0H100-0H002-130915
Issued by
Worcester County, Massachusetts

About this file

This is a Special Provisions document issued by the Massachusetts Department of Transportation Highway Division for a federal aid project involving pedestrian and bicycle improvements on Pleasant Street in Worcester, Massachusetts (Federal Aid Project No. STP/HPP-033(047)X, Project No. 610535-134928). The project extends from the intersection of Sunnyview Heights and Pleasant Street to just past the intersection of South Olean and Pleasant Street along State Highway Route 122 (stations 10+79 to 84+89). The scope of work includes construction of sidewalks and accessible curb ramps, repaving of existing sidewalks, mill and overlay of existing roadway, localized roadway reconstruction, curb extensions and adjustments, installation of new granite curbing, storm drain adjustments, installation of rectangular rapid flashing beacons and associated conduit and pullboxes, traffic signs and pavement markings, rumble strips, and maintenance of traffic. Work is restricted to normal eight-hour days (7:30 AM to 4:00 PM), Monday through Friday, with no lane closures permitted during peak traffic hours (7:00–9:00 AM and 3:00–6:00 PM). Night work for milling, paving, and deep excavation drainage requires prior approval and 48-hour advance notice. Prospective bidders must submit all questions by 3:00 PM on the Tuesday of the previous week before the scheduled bid opening date to massdotspecifications@dot.state.ma.us.

The project establishes labor participation goals of 15.3% for minorities and 6.9% for women for each job category, applicable to both contractors and subcontractors. The contract requires compliance with the 2026 Standard Specifications for Highways and Bridges and applicable standard drawings and manuals. Contractors must comply with the Buy America preference requirements for iron, steel, manufactured products, and construction materials, with limited exceptions for costs not exceeding 0.1% of total contract cost or $2,500, whichever is greater. The document includes extensive environmental provisions, including compliance with the Massachusetts Contingency Plan for contaminated soil management, requirements for a Licensed Site Professional and an Environmental Health and Safety Program, northern long-eared bat and tricolored bat protection measures with tree removal restrictions between June 1 and August 15, and an arborist for tree protection and evaluation. Additional requirements include utility coordination procedures, truck safety device certification by December 31, 2025, compliance with the National Defense Authorization Act regarding telecommunications and video surveillance equipment, and various work restrictions during the 2026 FIFA World Cup. The estimated traffic level for Superpave HMA mixture design is 4.8 million 18-kip ESALs over a 20-year period.

View the file

Other files

File Type Posted
610535 - Notice to Contractors.pdf PDF
A00808-610535.pdf PDF
A00820-610535.pdf PDF
WORCESTER-610535-134928-A-1.pdf PDF
A00809-610535.pdf PDF
A00861-610535.pdf PDF
610535 - Plan Holders List 7-27-2026.pdf PDF
Link to Bid Opening 7-28-2026~1.pdf PDF
BIDS OPENED - Tuesday - July 28-2026.pdf PDF
610535 Bid Items List.txt TXT text file
A00860-610535.pdf PDF
A00816-610535.pdf PDF
A00811-610535.pdf PDF
610535 - Plan Holders List 7-15-2026.pdf PDF
WORCESTER-610535-134928-A-2.pdf PDF
610535 - Bid Tabulations.pdf PDF
A00802-610535~1.pdf PDF
A00862-610535.pdf PDF
A00870-610535.pdf PDF
A00875-610535.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department of Transportation Highway Division Project No. 610535-134928

A00801 - 1

DOCUMENT A00801

SPECIAL PROVISIONS

WORCESTER

Federal Aid Project No. STP/HPP-033(047)X

Pedestrian and Bicycle Improvements on Pleasant Street

Labor participation goals for this Project shall be 15.3% for minorities and 6.9% for women for each job category. The goals are applicable to both Contractor’s and Subcontractor’s on-site construction workforce. Refer to Document 00820 for details.

SCOPE OF WORK

All work under this Contract shall be done in conformance with the 2026 Standard Specifications for Highways and Bridges, the Supplemental Specifications contained in this book, the Construction Standard Details in effect as of May 2026, the 1990 Standard Drawings for Signs and Supports, the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 11th Edition of the Manual on Uniform Traffic Control Devices (MUTCD) and the January 2026 Massachusetts Amendments to the MUTCD, the 1968 Standard Drawings for Traffic Signals and Highway Lighting, the latest edition of The American Standard for Nursery Stock, the Plans and these Special Provisions.

The work under this contract consists of improvements in pedestrian and bicycle safety along Pleasant Street, State Highway Route 122 station 10+79 to station 84+89. The project will begin at the intersection of Sunnyview Heights and Pleasant Street and the project will end just past the intersection of South Olean and Pleasant Street.

The work, as shown on the construction plans, includes but is not limited to:

• Construction of sidewalks and accessible curb ramps

• Repaving of existing sidewalks

• Mill and overlay of existing roadway

• Localized areas of roadway reconstruction to facilitate grading adjustments

• Curb extensions and curb line adjustments

• Installation of new granite curbing

• Stormdrain adjustments to align with new curb line

• Installation of rectangular rapid flashing beacons

• Installation of conduit and pullboxes for future rectangular rapid flashing beacon locations

• Traffic signs and pavement markings

• Rumble strips

• Maintenance of traffic

• Other incidental items

A00801 - 2

SCOPE OF WORK (Continued)

All work shall be performed within the existing State Highway Layout lines. No rights to enter upon or occupy private property have been acquired.

WORK SCHEDULE

The work on this project is restricted to a normal eight-hour day (7:30 AM to 4:00 PM), five-day work week. No work requiring lane closures shall be allowed between 6:00 AM – 9:00 AM and 3:00 PM to 6:00 PM, unless otherwise authorized by the Engineer.

No work that impacts the traveled way shall be permitted during peak hour traffic. Peak hours are defined as 7:00 – 9:00 AM and 3:00 – 6:00 PM.

Night work may be required for milling, paving operations and areas of drainage with deep excavation with prior approval and must be scheduled at least 48 hours in advance.

CONTRACTOR QUESTIONS AND ADDENDUM ACKNOWLEDGEMENTS

Prospective bidders are required to submit all questions to the Construction Contracts Engineer by 3:00 P.M. on the Tuesday of the previous week before the scheduled bid opening date. Any questions received after this time will not be considered for review by the Department.

Contractors should email questions and addendum acknowledgements to the following email address massdotspecifications@dot.state.ma.us The MassDOT proposal number and municipality is to be placed in the subject line.

NONCONFORMING COMPRESSIVE STRENGTH OF CEMENT CONCRETE

Concrete with compressive strength test results failing to attain the limits specified in Table 901.64-3 of 901.64.B: Acceptance Testing shall be evaluated for structural adequacy and serviceability at the Contractors’ expense. The Department will review all production records, the concrete test records, petrographic analysis report, field notes, and the placement records for the concrete in question. If the Engineer determines the material is found to be adequate to remain in place, payment shall be adjusted in accordance with the following formula:

𝑃𝑃 =

2(𝑓𝑓𝑓𝑓 − 𝑓𝑓′𝑐𝑐)(𝑈𝑈𝑈𝑈)(𝑄𝑄)

𝑓𝑓′𝑐𝑐

Where:

𝑃𝑃 = 𝑝𝑝𝑝𝑝𝑝𝑝 𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎 𝑓𝑓𝑓𝑓𝑓𝑓 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐

𝑓𝑓′𝑐𝑐 = 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚𝑚 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠ℎ 𝑎𝑎𝑎𝑎 28 𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑 𝑓𝑓𝑓𝑓 = 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠ℎ 𝑎𝑎𝑎𝑎 56 𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑 𝑄𝑄 = 𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞𝑞 𝑜𝑜𝑜𝑜 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟 𝑏𝑏𝑏𝑏 𝑡𝑡ℎ𝑒𝑒 𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡𝑡 𝑈𝑈𝑈𝑈 = 𝑢𝑢𝑢𝑢𝑢𝑢𝑢𝑢 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝 𝑜𝑜𝑜𝑜 𝑡𝑡ℎ𝑒𝑒 𝑙𝑙𝑙𝑙𝑙𝑙𝑙𝑙 𝑠𝑠𝑠𝑠𝑠𝑠 𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏𝑏 𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝 𝑝𝑝𝑝𝑝𝑝𝑝 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑦𝑦𝑦𝑦𝑦𝑦𝑦𝑦 𝑓𝑓𝑓𝑓𝑓𝑓 𝑡𝑡ℎ𝑒𝑒 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑜𝑜𝑜𝑜 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖𝑖 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑖𝑖𝑖𝑖 𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝 mailto:MassDOTSpecifications@dot.state.ma.us

A00801 - 3

SOIL STOCKPILING DIRECTIVE P-22-001

Any stockpiling of soil must be performed in compliance with Policy Directive P-22-001, Off- Site Stockpiling of Soil from MassDOT Construction Projects. This directive limits the allowable locations for off-site stockpiling of soil generated during MassDOT projects and includes various requirements that must be satisfied by the contractor prior to off-site stockpiling. The Contractor is responsible for identifying a suitable stockpile location.

CONTAMINATED SOIL

Soil to be removed from the project area shall not be assumed to be uncontaminated and must be evaluated prior to off-site management for potential contamination with hazardous materials. No soil may be disposed of off-site without proper assessment by the contractor and approval from the Resident Engineer (RE), District Environmental Engineer (DEE), or the project designee

EMERALD ASH BORER ADVISORY

To the extent possible, all trees and brush shall be disposed on site, typically chipped and spread in place. When trees or brush must be removed, such as in urban, or otherwise populated areas, Contractor shall identify proposed location for disposal, and provide written notification to the Engineer for approval. Disposal shall be in city or town of project, or at minimum, within county, of construction operations.

A00801 - 4

HOLIDAY WORK RESTRICTIONS

(Supplementing Subsection 7.09)

The District Highway Director (DHD) may authorize work to continue during these specified time periods if it is determined by the District that the work will not negatively impact the traveling public. DHD may allow work in those areas on a case by case basis and where work is behind barrier and will not impact traffic

Below are the holiday work restrictions:

New Years Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the day before until the normal start of business on the next subsequent business day. No work on local roadways on the holiday without permission by the DHD and the local police chief.

Martin Luther King's Birthday (Federal Holiday) No work restrictions due to traffic concerns, however work on local roadways requires permission by the DHD and local police chief.

President's Day (Federal Holiday) No work restrictions due to traffic concerns, however work on local roadways requires permission by the DHD and local police chief.

Evacuation Day (Suffolk County State Holiday) No work restrictions due to traffic concerns.

Patriot's Day (State Holiday) Work restrictions will be in place for Districts 3 and 6 along the entire Boston Marathon route and any other locations that the DHD in those districts determine are warranted so as to not to impact the marathon. All other districts work restrictions will be as per DHD.

Mother’s Day No work on Western Turnpike and Metropolitan Highway System from 5:00 AM on the Friday before, until the normal start of business on the following day.

A00801 - 5

HOLIDAY WORK RESTRICTIONS (Continued)

Memorial Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the Friday before, until the normal start of business on the following day.

Bunker Hill Day (Suffolk County State Holiday) No work restrictions due to traffic concerns.

Juneteenth No work restrictions due to traffic concerns, however work on local roadways requires permission by the DHD and local police chief.

Independence Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the day before until the normal start of business on the next subsequent business day. No work on local roadways on the holiday without permission by the DHD and the local police chief.

Labor Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the Friday before, until the normal start of business on the following day.

Columbus Day (Federal Holiday) No work on major arterials from 5:00 AM on the Friday before, until the normal start of business on the following day

Veterans' Day (Federal Holiday) No work restrictions due to traffic concerns.

Thanksgiving Day (Federal Holiday) No work on major arterials from 5:00 AM two days before until the normal start of business on the following Monday.

Christmas Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the day before until the normal start of business on the next subsequent business day.

SUBSECTION 8.02 SCHEDULE OF OPERATIONS

Replace this subsection with the following:

An integrated cost and schedule controls program shall be implemented by the Contractor to track and document the progress of the Work from Notice to Proceed (NTP) through the Contractor Field Completion (CFC) Milestone. The Contractor’s schedules will be used by the Engineer to monitor project progress, plan the level-of-effort required by the Department’s work force and consultants and as a critical decision-making tool. Accordingly, the Contractor shall ensure that it complies fully with the requirements specified herein and that its schedules are both accurate and updated as required by the specification throughout the life of the project. Detailed requirements are provided in Division II, Section 722 Construction Scheduling.

A00801 - 6

SUBSECTION 8.14 UTILITY COORDINATION, DOCUMENTATION, AND

MONITORING RESPONSIBILITIES

A. GENERAL

In accordance with the provisions of Section 8.00 Prosecution and Progress, utility coordination is a critical aspect to this Contract. This section defines the responsibility of the Contractor and MassDOT, with regard to the initial utility relocation plan and changes that occur as the prosecution of the Work progresses. The Engineer, with assistance from the Contractor shall coordinate with Utility companies that are impacted by the Contractor’s operations. To support this effort, the Contractor shall provide routine and accurate schedule updates, provide notification of delays, and provide documentation of the steps taken to resolve any conflicts for the temporary and/or permanent relocations of the impacted utilities. The Contractor shall provide copies to the Engineer of the Contractor communication with the Utility companies, including but not limited to:

• Providing advanced notice, for all utility-related meetings initiated by the Contractor.

• Providing meeting minutes for all utility-related meetings that the Contractor attends.

• Providing all test pit records.

• Request for Early Utility work requirements of this section (see below).

• Notification letters for any proposed changes to Utility start dates and/or sequencing.

• Written notification to the Engineer of all apparent utility delays within seven (7) Calendar

Days after a recognized delay to actual work in the field – either caused by a Utility or the Contractor.

• Any communication, initiated by the Contractor, associated with additional Right-of-Way needs in support of utility work.

• Submission of completed Utility Completion Forms.

B. PROJECT UTILITY COORDINATION (PUC) FORM

The utility schedule and sequence information provided in the Project Utility Coordination Form (if applicable) is the best available information at the time of the bid and has been considered in setting the contract duration. The Contractor shall use all of this information in developing the bid price and the Baseline Schedule Submission, inclusive of the individual utility durations sequencing requirements, and any work that has been noted as potentially concurrent utility installations.

C. INITIATION OF UTILITY WORK

The Engineer will issue all initial notice-to-proceed dates to each Utility company based on either the:

1) Contractor’s accepted Baseline Schedule

2) An approved Early Utility Request in the form of an Early Utility sub-net schedule (in accordance with the requirements of this Subsection)

3) An approved Proposal Schedule

C.1 - BASELINE SCHEDULE – UTILITY BASIS

The Contractor shall provide a Baseline Schedule submission in accordance with the requirements of Subsection 8.02 and inclusive of all of the information provided in the PUC Form that has been issued in the Contract documents. This is to include the utility durations, sequencing of work, allowable concurrent work, and all applicable considerations that have been depicted on the PUC Form.

A00801 - 7

SUBSECTION 8.14 (Continued)

C.2 – EARLY UTILITY REQUEST – (aka SUBNET SCHEDULE) PRIOR TO THE BASELINE All early utility work is defined as any anticipated/required utility relocations that need to occur prior to the Baseline Schedule acceptance. In all cases of proposed early utility relocation, the Contractor shall present all known information at the pre-construction conference in the form of a ‘sub-net’ schedule showing when each early utility activity needs to be issued a notice-to-proceed. The Contractor shall provide advance notification of this intent to request early utility work in writing at or prior to the Pre-Construction meeting. Prior to officially requesting approval for early utility work, the Contractor shall also coordinate with MassDOT and all utility companies (private, state or municipal) which may be impacted by the Contract. If this request is acceptable to the Utilities and to MassDOT, the Engineer will issue a notice-to-proceed to the affected Utilities, based on these accepted dates.

C.3 – PROPOSAL SCHEDULE - CHANGES TO THE PUC FORM

If the Contractor intends to submit a schedule (in accordance with MassDOT Standard Specifications, Division I, Subsection 8.02) that contains durations or sequencing that vary from those provided in the Project Utility Coordination (PUC) Form, the Contactor must submit this as an intended change, in the form of a Proposal Schedule and in accordance with MassDOT Standard Specifications, Division I, Subsection 8.02. These proposed changes are subject to the approval of the Engineer and the impacted utilities, in the form of this Proposal Schedule and a proposed revision to the PUC form. The Contractor shall not proceed with any changes of this type without written authorization from the Engineer, that references the approved Proposal Schedule and PUC form changes. The submission of the Baseline Schedule should not include any of these types of proposed utility changes and should not delay the submission of the Baseline Schedule. As a prerequisite to the Proposal Schedule submission, and in advance of the utility notification(s) period, the Contractor shall coordinate the proposed utility changes with the Engineer and the utility companies, to develop a mutually agreed upon schedule, prior to the start of construction.

D. UTILITY DELAYS

The Contractor shall notify the Engineer upon becoming aware that a Utility owner is not advancing the work in accordance with the approved utility schedule. Such notice shall be provided to the Engineer no later than seven (7) calendar days after the occurrence of the event that the Contractor believes to be a utility delay. After such notice, the Engineer and the Contractor shall continue to diligently seek the Utility Owner’s cooperation in performing their scope of Work.

In order to demonstrate that a critical path delay has been caused by a third-party Utility, the Contractor must demonstrate, through the requirements of the monthly Progress Schedule submissions and the supporting contract records associated with Subsection 8.02, 8.10 and 8.14, that the delays were beyond the control of the Contractor.

A00801 - 8

SUBSECTION 8.14 (Continued)

All documentation provided in this section is subject to the review and verification of the Engineer and, if required, the Utility Owner. In accordance with MassDOT Specifications, Division I, Subsection 8.10, a Time Extension will be granted for a delay caused by a Utility, only if the actual duration of the utility work is in excess of that shown on the Project Utility Coordination Form, and only if;

1) proper Notification of Delay was provided to MassDOT in accordance with the time requirements that are specified in this Section

2) the utility delay is a critical path impact to the Baseline Schedule (or most recently approved Progress Schedule)

E. LOCATION OF UTILITIES

The locations of existing utilities are shown on the Contract drawings as an approximation only.

The Contractor shall perform a pre-construction utility survey, including any required test pits, to determine the location of all known utilities no later than thirty (30) calendar days before commencing physical site work in the affected area.

F. POST UTILITY SURVEY – NOTIFICATION

Following completion of a utility survey of existing locations, the Contractor will be responsible to notify the Engineer of any known conflicts associated with the actual location of utilities prior to the start of the work. The Engineer and the Contractor will coordinate with any utility whose assets are to be affected by the Work of this Contract. A partial list of utility contact information is provided in the Project Utility Coordination Form.

G. MEETINGS AND COOPERATION WITH UTILITY OWNERS

The Contractor shall notify the Engineer in advance of any meeting they initiate with a Utility Owner’s representative to allow MassDOT to participate in the meeting if needed.

Prior to the Pre-Construction Meeting, the Contractor should meet with all Utility Owners who will be required to perform utility relocations within the first 6 months of the project, to update the affected utilities of the Project Utility Coordination Form and all other applicable Contract requirements that impact the Utilities. The Contractor shall copy the Engineer on any correspondence between the Utility Owner and the Contractor.

H. FORCE ACCOUNT / UTILITY MONITORING REQUIREMENTS

The Engineer will be responsible for recording daily Utility work force reports. The start, suspension, re-start, and completion dates of each of the Utilities, within each phase of the utility relocation work, will be monitored and agreed to by the Engineer and the Contractor as the work progresses.

I. ACCESS AND INSPECTION

The Contractor shall be responsible for allowing Utility owners access to their own utilities to perform the relocations and/or inspections. The Contractor shall schedule their work accordingly so as not to delay or prevent each utility from maintaining their relocation schedule.

A00801 - 9

COMPLIANCE WITH THE NATIONAL DEFENSE AUTHORIZATION ACT

(Supplementing Subsection 7.01)

On all projects, the “Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment” Regulation (2 CFR 200.216) prohibits the Contractor from using or furnishing the following telecommunications equipment or services:

• Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities).

• For the purpose of public safety, security of government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities).

• Telecommunications or video surveillance services provided by such entities or using such equipment.

• Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

This prohibition applies to all products manufactured by the aforementioned companies, including any individual components or parts.

By submitting a bid on a project, the Contractor certifies that all work will be in compliance with the terms of 2 CFR 200.216. The Contractor shall submit a COC indicating compliance with the above provisions for all telecommunications equipment or services included in the Contract.

Payment for the item in which the materials are incorporated may be withheld until these COCs are received. Any cost involved in furnishing the certificate(s) shall be borne by the Contractor.

BIDDERS LIST

Pursuant to the provisions of 49 CFR Part 26.11 all official bidders will be required to report the names, addresses and telephone numbers of all firms that submitted bids or quotes in connection with this project. Failure to comply with a written request for this information within 15 business days may result in a recommendation to the Prequalification Committee that prequalification status be suspended until the information is received.

The Department will survey all firms that have submitted bids or quotes during the previous year prior to setting the annual goal and shall request that each firm report its age and gross receipts for the year.

A00801 - 10

BUILD AMERICA BUY AMERICA PREFERENCE

On Federally-aid projects the Buy America (23.CFR § 635.410) and Build America, Buy America Act. requires the following,

(1) all iron and steel used in the project are produced in the United States--this means all manufacturing processes, from the initial melting stage through the application of coatings, must occur in the United States. Foreign steel and iron can be used if the cost of the materials does not exceed 0.1% of the total Contract cost or $2,500, whichever is greater.

The action of applying a coating to a covered material (i.e., steel and iron) is deemed a manufacturing process subject to Buy America. Coating includes epoxy coating, galvanizing, painting and any other coating that protects or enhances the value of a material subject to requirements of Build America, Buy America. Steel used for temporary support of excavation, including H piles, soldier piles, and sheeting when the steel is required to be left in place is subject to requirements of Build America, Buy America. Temporary steel, shall remain in place when it falls within the influence zone of the soil supporting any structure or railroad tracks.

(2) all manufactured products used in the project are produced in the United States—this means the manufactured product was manufactured in the United States and

(3) all construction materials are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States.

“Construction materials” includes an article, material, or supply—other than an item of primarily iron or steel; a manufactured product; cement and cementitious materials;

aggregates such as stone, sand, or gravel; or aggregate binding agents or additives—that is or consists primarily of:

• non-ferrous metals,

• plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables),

• glass (including optic glass),

• lumber; or

• drywall.

The Buy America preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.

All articles, materials, and supplies should be classified as an iron or steel product, a manufactured product, or another product as specified by law or in 2 CFR part 184 (such other products specified by law or in 2 CFR part 184 include “excluded materials” and “construction materials”); an article, material, or supply must not be considered to fall into multiple categories.

A00801 - 11

2026 FIFA WORLD CUP – BOSTON, MASSACHUSETTS

The 2026 FIFA World Cup will be held at Gillette Stadium in Foxborough, related events, and significant tourist events such as Sail Boston and the 250th Anniversary of the United States will be held throughout the region. Matches and Fan Fest and other possible 250th Celebration activities are scheduled through June, July and August 2026. The District will be imposing work and/or traffic restrictions as necessary to minimize impacts during these periods when, as determined by MassDOT, the Contractor’s operations could impact vehicular traffic, particularly on interstate highways and major arterials throughout the region and local roads near event sites.

No additional compensation will be allowed for work restrictions except as determined under Subsection 8.10. nor will the Contractor have any claim for related costs, direct or indirect. The Contract time determinations have accounted for potential work restriction during this period and Contractor’s should plan accordingly. Any necessary or emergency work required during this time will require District approval.

TRUCK SAFETY DEVICES

(Supplementing Subsection 7.04: Motor Vehicles)

All motor vehicles subject to Section 7 of Chapter 90 to be operated under this Contract shall be equipped with safety devices as provided therein and in 540 CMR 4.00.

By December 31, 2025, the Contractor shall certify to the Registry of Motor Vehicles, in a manner prescribed by the Registrar, that all applicable vehicles are equipped with Lateral Protective Devices, Convex Mirrors, Cross Over Mirror(s) and Back Up Cameras in accordance with the requirements of 540 CMR 4.00.

The Contractor shall provide evidence satisfactory to the Department to demonstrate compliance with the above certification requirement for all applicable vehicles operated under this Contract by the Contractor and its subcontractors and vendors in a manner set forth by the Department.

Thereafter, the Contractor shall have an affirmative obligation to continue to provide such evidence of compliance on an ongoing basis and no later than 7 days after certification with the Registry of Motor Vehicles of any additional vehicles operated under this Contract by the Contractor and its subcontractors and vendors.

Non-compliance with respect to a vehicle that is subject to 540 CMR 4.00 may subject the Contractor to statutory fines as established in M.G.L. c. 90, § 7 and/or contractual remedies up to and including termination of the Contract.

EQUIVALENT SINGLE AXLE LOADS (ESALS)

The estimated traffic level to be used for SUPERPAVE HMA mixture designs for this contract, expressed in Equivalent Single Axle Loads (ESALs) for the design travel lane over a 20-year period, is 4.8 Million 18-kip (80-kn) ESALs.

A00801 - 12

NATIONAL GRID EMERGENCY TELEPHONE NUMBERS

ELECTRIC:

Outage/ Emergency: 1-800-465-1212 New Service: 1-800-375-7405 Customer Support: 1-800-322-3223

EVERSOURCE EMERGENCY TELEPHONE NUMBERS

GAS:

Outage/ Emergency: 800-592-2000 New Service: 866-678-2744 Customer Support: 800-592-2000

MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION FILE

NUMBER SIGN

This project is subject to Massachusetts General Laws, Chapter 131, Section 40 as amended.

Signs shall be in accordance with the latest MassDOT Construction Standards. All costs for the manufacture, erection, maintenance, moving, and removal of the signs shall be absorbed by the contractor with no additional compensation other than the contract unit prices.

For this project, the Massachusetts Department of Environmental Protection File Number is 349- 1445.

ENVIRONMENTAL PERMITTING

An Order of Conditions has been issued by the Worcester Conservation Commission under the Wetlands Protection Act. If field conditions and/or Contractor-proposed erection, demolition, storage, or other procedures not originally allowed by existing environmental permits require work to occur in or otherwise impact water or wetland resource areas, the Contractor is advised that no associated work can occur until all required environmental permits have been either amended or obtained allowing such work. The Contractor must notify the District 3 Highway Director and Resident Engineer in writing at least 60 days prior to desired commencement of the proposed activity. All environmental submittals, including any contact with Local, State, or Federal environmental agencies, must be coordinated with the District 3 Environmental Engineer. The Contractor is expected to fully cooperate with requests for information and provide same in a timely manner. The Contractor is further advised that the Department will not entertain a delay claim due to the time required to modify or obtain the environmental permits.

A00801 - 13

NORTHERN LONG-EARED BAT AND TRICOLORED BAT PROTECTION

The northern long-eared bat (Myotis septentrionalis; NLEB) and tricolored bat (Perimyotis subflavus; TCB) are listed as federally endangered or proposed endangered, respectfully, under the Endangered Species Act (ESA). The U.S. Fish and Wildlife Service (USFWS) developed this guidance to address ESA compliance and promote conservation of NLEB and TCB. MassDOT, on behalf of FHWA, submitted a Northern Long-eared Bat and Tricolored Bat Range-wide Determination Key Consultation through Information for Planning and Consultation (IPaC) and generated a May Affect, Not Likely to Adversely Affect (NLAA) determination (see Document A00870 USFWS NLAA Concurrence Verification – Project Code 2022-0019568 dated March 3, 2026). Subsequently, the project has completed Section 7 consultation under the ESA.

In advance of the uplisting of the TCB to endangered under the ESA, the following Avoidance and Minimization Measures (AMMs) must be strictly adhered to in order to protect NLEB and TCB and to be in compliance with the ESA. Contact MassDOT Environmental Services - Wildlife Unit Supervisor for questions about project limits, restrictions, or conservation measures.

General AMM

• The Contractor shall ensure all personnel working in on the project site are aware of all environmental commitments related to NLEB and TCB, including all applicable AMMs. NLEB and TCB information (https://www.fws.gov/midwest/endangered/mammals/nleb/ and https://www.fws.gov/species/tricolored-bat-perimyotis-subflavus) shall be made available to all personnel.

• On July 11, 2025, MassDOT Highway Division Environmental Services conducted a northern long-eared bat summer presence/absence survey, in accordance with the 2025 survey guidelines.

The survey did confirm the presence of NLEB and/or TCB. If work is proposed by the Contractor past July 11, 2030, additional review is required by the MassDOT Highway Division’s Environmental Services Section, and additional review and restrictions may be required by the USFWS.

Lighting AMMs

• Direct temporary lighting away from suitable habitat during the active season: April 15 to

October 31.

• When installing new or replacing existing permanent lights, use downward-facing, full cut-off lens lights (with same intensity or less for replacement lighting); or for those transportation agencies using the BUG system developed by the Illuminating Engineering Society, be as close to 0 for all three ratings with a priority of “uplight” of 0 and “backlight” as low as practicable.

https://www.fws.gov/midwest/endangered/mammals/nleb/

A00801 - 14

NORTHERN LONG-EARED BAT AND TRICOLORED BAT PROTECTION (Continued)

Tree Removal AMMs

• If additional cutting is proposed by the Contractor that is outside the scope of this contract, additional review is required by the MassDOT Highway Division’s Environmental Services Section, and additional review and restrictions may be required by the USFWS.

• Ensure tree removal is limited to that specified in project plans and ensure that contractors understand clearing limits and how they are marked in the field (e.g., install bright colored flagging/fencing prior to any tree clearing to ensure contractors stay within clearing limits).

• No tree cutting, trimming, or removal of trees and/or woody vegetation >3-inch in diameter shall be conducted between: June 1 - August 15

• The Contractor shall ensure all personnel working in on the project site are aware of all environmental commitments related to NLEB and/or TCB, including the TOY restriction. If this restriction needs to be waived at any location(s) the Resident Engineer shall send a locus map of the proposed work to MassDOT Highway Division’s Environmental Services Section for review and a determination if the restriction can be waived.

Bridge AMM

• On July 11, 2025, MassDOT Highway Division Environmental Services, conducted a northern long-eared bat bridge/structure bat assessment, in accordance with the USFWS guidelines. The assessment did not find presence of, or evidence of use by bats, and as stated within the guidelines, the assessment is valid for two years. If bridge work is not complete before July 11, 2027, assessment of the bridge for the presence of, or evidence of use by, bats shall be completed by the MassDOT Wildlife Unit prior to continuing bridge work. The Contractor shall notify the MassDOT Wildlife Unit no later than fourteen (14) days prior to July 11, 2027 to provide adequate time for inspection. If bats are found to be present, or, if there is evidence of bat usage, work at the bridge shall not commence until after the MassDOT Wildlife Unit has completed coordination with the US Fish and Wildlife Service to determine the appropriate follow up or mitigation actions.

A00801 - 15

ITEM 102.513 AIR EXCAVATION AND ROOT PRUNING FOOT

Item 102.513 Air Excavation and Root Pruning is for the services of excavating soil with an air pressure tool in order to expose tree roots, and for associated services and materials necessary to complete the work of pruning, backfilling with existing soil, watering, mulching, and fertilizing. This item shall include the furnishing and operating the air excavating tool.

Associated Item: All references to Arborist herein shall refer to the Arborist under Item 102.55 Arborist. Arborist shall meet the requirements as specified under that Item and shall be compensated under that Item.

Trees to be air spaded shall be those shown on the plans and/or as determined necessary by the Engineer per the recommendations of the Arborist.

REFERENCES

The standards from American National Standards Institute (ANSI): A300 (Part 8)-2013 Root Management with special attention to Section 84 shall apply to this work. If requested, the Contractor shall provide to the Engineer one copy of this reference. Provision of reference shall be incidental to this item.

METHODS

Air excavation and pruning work shall be performed by or overseen by the Arborist.

Air excavation of soil and root pruning shall occur any time prior to equipment work within the root zone of marked trees.

Air excavation shall be done along the limit of proposed excavation. Trench shall be of sufficient width to observe and cut roots and shall be to the depth of proposed excavation. Immediately following air excavation, roots shall be pruned.

Following pruning, roots shall immediately be fully covered with backfill and immediately watered. Roots shall continue to be watered and fertilized as directed by the Engineer.

METHOD OF MEASUREMENT AND BASIS OF PAYMENT

Item 102.513 will be measured and paid per foot where air spading, pruning, watering, and fertilizing are performed. This item will include full compensation for all labor, equipment, materials, and incidentals required for the satisfactory completion of the work.

Arborist services shall be per Item 102.55 Arborist and compensated under that Item.

A00801 - 16

ITEM 102.521 TREE AND PLANT PROTECTION FENCE FOOT

The work under this Item shall conform to the relevant provisions of Sections 644 and 771 of the Standard Specifications and the following:

Work under this item shall consist of furnishing, installing, and maintaining tree and plant protection fence(s) in a vertical and taut position; removing and resetting fencing as may be required; and final removal of protection fence(s) at the completion of construction activities, or as otherwise required by the Engineer.

The purpose of the fencing is to signify a construction work-free zone and physical barrier, thereby preventing damage to tree roots, tree trunks, soil, and all other vegetation within this delineated Tree and Plant Protection Zone (TPPZ), as shown on the Drawings, as required by the Engineer, and as described herein.

Protection shall be for the duration of the construction activities unless otherwise directed.

MATERIALS

Tree and plant protection fence(s) shall provide a minimum forty-eight (48) inch tall barrier, that remains vertical and taut. The Fence shall be orange plastic safety fence (recommended where high visibility is necessary), or wooden snow fencing, or other approved material. Posts and anchoring materials shall be incidental to the work.

Per requirements of the Engineer, additional posts, deeper post depths, and/or additional attachments shall be used if the fabric or fence sags, leans or otherwise is not providing visible or physical protection to the TPPZ.

REFERENCES

If requested, the Contractor shall provide to the Engineer one copy of the American National Standards Institute (ANSI) A300 Standard Practices for Tree, Shrub, and Other Woody Plant Maintenance Part 1, Pruning and Part 5, Construction Management Standard. Provision of reference shall be incidental to this item.

ESTABLISHMENT OF THE TPPZ

Fencing shall be used to delineate and establish the TPPZ, adjacent to construction areas, staging areas, stockpile areas, as shown on the Drawings, and/or as required by the Engineer.

Fencing shall be located as close to the work zone limit and as far from tree trunk(s) and plants as possible to maximize the area to be protected. Fence shall run parallel and adjacent to construction activity to create a barrier between the work zone and the root zone or designated limit of plants and soils to be protected.

When construction activities surround (or have the potential to surround) trees or plants to be protected, a circular enclosure shall be used. In these instances, the TPPZ limit shall be the drip line of each tree or as close as possible to the drip line, and/or as shown on the Drawings. The drip line is defined as the outermost limit of tree canopy.

A00801 - 17

ITEM 102.521 (Continued)

The Contractor shall not engage in any construction activity within the TPPZ without the approval of the Engineer. Activities may include operating, moving, or storing equipment, supplies, or materials;

and locating temporary facilities, including trailers or portable toilets, Accessing or traversing the TPPZ shall not be permitted.

METHOD OF WORK

TPPZ fencing shall be installed prior to any construction work or staging activities. Fence(s) shall be repositioned where and as necessary for optimum tree and plant protection. Repositioning shall be incidental to this item. TPPZ fencing shall not be moved without prior approval by the Engineer.

The TPPZ shall be protected at all times from compaction of the soil; damage of any kind to trunks, bark, branches, leaves, and roots of all plants; and contamination of the soil with construction materials, debris, silt, fuels, oils, and any chemicals substance.

After construction activities are completed, or when required by the Engineer, fencing, stakes, and other anchoring materials, if any, shall be removed and disposed off-site by the Contractor.

REQUIRED WORK WITHIN THE TPPZ

In the event that grading, trenching, utility work, or storage is unavoidable within the TPPZ, the Engineer shall be notified. Measures may be required for tree protection and preservations, including air spading; the use of six (6) inch depth of wood chips or approved matting for root protection; pruning of branches; and/or trunk protection. These protection measures shall be paid under applicable contract items.

Landscaping work specified within the TPPZ shall be accomplished by hand tools. Where handwork is not feasible, with permission of the Engineer, work shall be conducted with the smallest mechanized equipment necessary.

TREE AND PLANT INJURY OR LOSS

If the TPPZ is encroached by construction activity without approval, at the discretion of the Engineer, the Contractor may be required to provide a more durable barrier (e.g., Jersey Barriers, chain link fence (if not already in use) to secure the area. Costs of furnishing and installing additional or more durable barrier(s) shall be borne by the Contractor.

In such cases of encroachment, soils shall be considered compacted and tree root injury will be assumed. Action shall be taken as specified below.

In the event that trees designated for protection under this item are injured, including root injury from unapproved trespassing onto the root zone, the Contractor shall, at his own expense, secure the services of an Arborist, described under Item 102.55. The Arborist shall be approved by MassDOT.

In the event of spills, compaction or injury, the Contractor shall take corrective action immediately using methods approved by the Engineer, in coordination with the Arborist.

A00801 - 18

ITEM 102.521 (Continued)

If, based on the recommendations of the Arborist, the Engineer determines that injuries can be remedied by corrective measures, such as repairing trunk or limb injury, soil compaction remediation, pruning, and/or watering; the injury shall be repaired as soon as possible, within the appropriate season for such work, and according to industry standards.

If, based on the recommendations of the Arborist, the Engineer determines that injuries are irreparable, or that the injuries are such that the tree is sufficiently compromised to pose a future safety hazard, the tree shall be removed. Tree removal shall include cleanup of all wood, grinding of the stump to a depth sufficient to plant a replacement tree or plant, removal of all chips from the stump site, and filling the resulting hole with topsoil. Such tree removal(s), grinding, debris removal, and filling, shall be at the Contractor’s expense.

Tree removal from improper or inadequate protection of the TPPZ shall result in the Engineer assessing the Contractor monetary damages consistent with industry standards for assessed value and/or replacement.

Shrubs removals from improper or inadequate protection of the TPPZ shall be replaced with plants of similar species and equal size or the largest size plants reasonably available. The Engineer shall approve the size, quality, and quantity of the replacement plant(s). Each replacement shall include a minimum of one year of watering and establishment care, specified under Section 771.

METHOD OF MEASUREMENT AND BASIS OF PAYMENT

Tree and Plant Protection Fence will be measured by the FOOT, complete in place, by the length along the top of the fence.

Tree and plant protection fence will be paid for under the contract unit price per FOOT, complete in place and shall include all materials, labor, and equipment required to furnish, install, anchor, maintain, and remove the fence upon completion, as described herein. Posts, temporary footings, anchoring and removal upon completion, shall be incidental to this item.

No separate payment will be made for costs of remedial actions, including addition of more durable barriers, Arborist services, tree or plant removal, shrub replacement and establishment, but all costs in connection therewith shall be included in the Contract unit price bid.

Tree damages assessed, due to lack of or improper tree and plant protective measures being taken, shall be deducted from the contract price of the work.

Payment for work under this item will be scheduled as follows:

• Forty (40) percent of the value payment will be made upon installation of fencing.

• Sixty (60) percent of the value payment will be made when fencing materials have been maintained to function as specified, for the intended duration, and removed and disposed off-site at the completion of protection measure requirement.

A00801 - 19

ITEM 102.55 ARBORIST HOUR

DESCRIPTION

The work under this Item is for the services of a Certified Arborist. Arborist shall be an International Society of Arboriculture (ISA) Certified Arborist or a Massachusetts Certified Arborist. The Arborist shall have at least 10 years of experience in tree care, including tree protection during construction, and shall demonstrate a familiarity with the American National Standards Institute (ANSI) A300 Standard Practices for Tree, Shrub, and Other Woody Plant Maintenance Part 1Pruning, Part 5 Construction Management Standards, and Part 9 Tree Risk Assessment.

The Arborist’s general responsibilities include protecting high priority trees within and adjacent to the project limits, stating areas, and access routes; recommending removal of diseased, damaged or otherwise unhealthy trees that pose a potential safety hazard; evaluating effects of construction on future health of trees close to proposed work; and recommending and/or overseeing tree work amd care.

The Arborist for this item shall not be from the same company as the company responsible for selective clearing or tree removal work.

For projects with multiple phases, projects where construction activities (work or stockpiling) shifts, or when otherwise directed by the Engineer, the Arborist shall re-evaluate conditions and provide follow-up recommendations.

SUBMITTALS

B Contractor shall submit to the Engineer for approval by MassDOT Landscape Design the qualifications and experience of the Arborist. Submittal shall include copy of current certification and a resume summarizing specific construction experience (including relevant MassDOT projects) for a minimum of five projects.

B Arborist’s Report documenting recommendations shall be submitted to the Engineer and an electronic copy forwarded to MassDOT Landscape Design Section. Report shall include the following:

SCOPE OF WORK

The Arborist shall be responsible for the following tasks:

o Initial Evaluation and Report

• recommend and prioritize trees that require removal as appropriate to contract scope, project limits, and project intent;

• review and modify, if necessary, tree protection measures shown on the drawings

• review and mark limits of protective fencing for trees and groups of trees to be retained;

• review and recommend protection measures for high priority trees;

• submit a marked-up Construction Plan that briefly notes recommendations and decisions made in the field;

A00801 - 20

ITEM 102.55 (Continued)

• submit a corresponding report including photo documentation;

o Oversight

• direct or execute pruning of branches and/or roots, air spading, and/or other tree care operations o Monitoring and Inspections

• periodically inspect fencing and ensure root zones are properly protected and clear of equipment and materials as required by the Engineer

• reevaluate tree protection measures for various phases of a project

• submit inspection notes with relevant and dated photos to the Engineer.

o Special Care

• oversee tree pruning for health and aesthetics

• recommend fertilization and amendments

• recommend and oversee pest control

Prior to any work, the Arborist shall walk the site with the Contractor, the Engineer, the City Tree Warden, and, if specified, the MassDOT Landscape Architect, to review trees, limits of construction activities, and other concerns. Where required for proper assessment of tree impacts, limits of work shall be staked or otherwise marked in the field prior to the site walk.

Trees to be removed shall be painted or otherwise marked.

Trees to be retained shall be marked such that it does not mar or damage the tree and such that marker is not easily removed. As applicable to the work and scope of the project, trees designated for removal or to be retained shall be noted on the plan and/or in the arborist’s report and photographed.

Trees designated to remain that are damaged or removed by construction activities shall be noted and photographed for inclusion in inspection reports submitted to the Engineer.

MEASUREMENT AND BASIS OF PAYMENT

Item 102.55 will be measured for payment by the Hour of time spent onsite.

Item 102.55 will be paid at the contract unit price per hour upon submittal and acceptance of Reports described above.

A00801 - 21

ITEM 180.01 ENVIRONMENTAL HEALTH AND SAFETY PROGRAM LUMP SUM

The work shall consist of ensuring the health and safety of the Contractor’s employees and subcontracting personnel, the Engineer, their representatives, the environment, and public welfare from any on-site chemical contamination present in air, soil, water and sediment.

The Contractor shall prepare and implement a site-specific Environmental Health and Safety Plan (EHASP) which has been approved and stamped by a Certified Industrial Hygienist (CIH) and includes the preparer's name and work experience. The EHASP shall include appropriate components required by OSHA Standard 29 CFR 1910.120(b) and the Massachusetts Contingency plan (MCP) 310 CMR 40.0018 and must comply with all applicable state and federal laws, regulations, standards and guidelines, and provide a degree of protection and training appropriate for implementation on the project.