This is a bid tabulation document for the Massachusetts Department of Transportation (MassDOT) for pedestrian and bicycle improvements on Pleasant Street in Worcester (Project 610535, Contract 134928). The project encompasses approximately 1.4 miles of roadway improvements including mill and overlay operations (34,730 square yards of fine milling and 3,910 tons of Superpave surface course), installation of buffered bicycle lanes, approximately 4,075 linear feet of new sidewalk on the north side, three rectangular rapid flashing beacon assemblies with crosswalk lights, granite curbing (1,378 linear feet), concrete sidewalk and curb ramp construction (640 square yards of curb ramps), drainage improvements (4 new deep-sump catch basins and 126 drainage-structure adjustments), tree trimming (1,430 linear feet), and extensive traffic control elements. The bids opened on July 28, 2026, with nine contractors submitting proposals. Work is restricted to 7:30 a.m. to 4:00 p.m., Monday through Friday, with no lane closures during peak hours (7:00-9:00 a.m. and 3:00-6:00 p.m.).

The office estimate for the project was $3,924,628.00. The nine bidders submitted the following total bids: A F Amorello & Sons Inc ($3,260,984.00), J H Lynch & Sons Inc ($3,387,214.63), P J Albert Inc ($3,489,973.55), Morais Contractors Inc ($3,692,559.89), PJ Keating Company ($3,884,132.55), R M Pacella Inc ($4,284,728.30), and Caracas Construction Corp ($4,558,253.90). Individual line items vary significantly across bidders, with some showing substantially lower or higher unit prices on specific work elements such as unclassified excavation, soil disposal, pavement operations, and curbing installation. The estimated contract value is $3.925 million, with funding provided through Federal Aid Project STP/HPP-0033(047)X. Labor participation goals require 15.3% for minorities and 6.9% for women. The project is subject to prevailing wage rates, Buy America preference requirements, and environmental compliance including northern long-eared bat and tricolored bat protection, with tree removal prohibited June 1 through August 15.

View the file

Other files

File Type Posted
610535 - Notice to Contractors.pdf PDF
A00808-610535.pdf PDF
A00820-610535.pdf PDF
WORCESTER-610535-134928-A-1.pdf PDF
A00809-610535.pdf PDF
A00861-610535.pdf PDF
610535 - Plan Holders List 7-27-2026.pdf PDF
Link to Bid Opening 7-28-2026~1.pdf PDF
A00801-610535.pdf PDF
BIDS OPENED - Tuesday - July 28-2026.pdf PDF
610535 Bid Items List.txt TXT text file
A00860-610535.pdf PDF
A00816-610535.pdf PDF
A00811-610535.pdf PDF
610535 - Plan Holders List 7-15-2026.pdf PDF
WORCESTER-610535-134928-A-2.pdf PDF
A00802-610535~1.pdf PDF
A00862-610535.pdf PDF
A00870-610535.pdf PDF
A00875-610535.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prelims Unit

Bid Tabulations

Project # : 610535 Bids Open Date : 28 Jul 2026 Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

Office Estimate A F AMORELLO & SONS INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

101.1 0.200 A CLEARING $20,000.00 $4,000.00 $35,525.00 $7,105.00

102.1 1,430.000 FT TREE TRIMMING $12.00 $17,160.00 $14.00 $20,020.00

102.513 45.000 FT AIR EXCAVATION AND ROOT PRUNING $30.00 $1,350.00 $68.00 $3,060.00

102.521 185.000 FT TREE AND PLANT PROTECTION FENCE $20.00 $3,700.00 $18.00 $3,330.00

102.55 40.000 HR ARBORIST $265.00 $10,600.00 $189.00 $7,560.00

120.1 3,325.000 CY UNCLASSIFIED EXCAVATION $52.00 $172,900.00 $59.00 $196,175.00

141.1 25.000 CY TEST PIT FOR EXPLORATION $174.00 $4,350.00 $484.00 $12,100.00

142. 10.000 CY CLASS B TRENCH EXCAVATION $90.00 $900.00 $174.00 $1,740.00

144. 1.000 CY CLASS B ROCK EXCAVATION $225.00 $225.00 $248.00 $248.00

146. 2.000 EA DRAINAGE STRUCTURE REMOVED $1,300.00 $2,600.00 $2,075.00 $4,150.00

151. 1,460.000 CY GRAVEL BORROW $55.00 $80,300.00 $45.00 $65,700.00

151.01 330.000 CY GRAVEL BORROW - TYPE C $55.00 $18,150.00 $50.00 $16,500.00

156. 15.000 TON CRUSHED STONE $75.00 $1,125.00 $32.00 $480.00

170. 7,020.000 SY FINE GRADING AND COMPACTING - SUBGRADE

AREA

$10.00 $70,200.00 $12.00 $84,240.00

180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $12,080.00 $12,080.00 $5,921.00 $5,921.00

180.02 40.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $15.00 $600.00 $11.00 $440.00

180.03 20.000 HR LICENSED SITE PROFESSIONAL SERVICES $150.00 $3,000.00 $148.00 $2,960.00

181.11 2,900.000 TON DISPOSAL OF UNREGULATED SOIL $32.00 $92,800.00 $19.00 $55,100.00

181.12 310.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE

FACILITY

$85.00 $26,350.00 $53.00 $16,430.00

181.13 580.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE

FACILITY

$135.00 $78,300.00 $76.00 $44,080.00

181.14 80.000 TON DISPOSAL OF HAZARDOUS WASTE $520.00 $41,600.00 $182.00 $14,560.00

201. 4.000 EA CATCH BASIN $6,000.00 $24,000.00 $5,505.00 $22,020.00

202. 2.000 EA MANHOLE $6,000.00 $12,000.00 $5,961.00 $11,922.00

220. 126.000 EA DRAINAGE STRUCTURE ADJUSTED $500.00 $63,000.00 $345.00 $43,470.00

220.3 1.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $1,750.00 $1,750.00 $430.00 $430.00

220.7 39.000 EA SANITARY STRUCTURE ADJUSTED $450.00 $17,550.00 $347.00 $13,533.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 1 of 20

Project # : 610535 Bids Open Date : 28 Jul 2026 Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

Office Estimate A F AMORELLO & SONS INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

222.1 45.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $1,400.00 $63,000.00 $2,131.00 $95,895.00

222.3 5.000 EA FRAME AND GRATE (OR COVER) MUNICIPAL

STANDARD

$1,200.00 $6,000.00 $1,023.00 $5,115.00

222.31 1.000 EA SPECIAL FRAME AND GRATE - VERTICAL TYPE $3,000.00 $3,000.00 $2,142.00 $2,142.00

223.1 45.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

STACKED

$150.00 $6,750.00 $948.00 $42,660.00

223.2 15.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

DISCARDED

$250.00 $3,750.00 $841.00 $12,615.00

224.12 3.000 EA 12 INCH HOOD $900.00 $2,700.00 $608.00 $1,824.00

227.3 180.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $200.00 $36,000.00 $271.00 $48,780.00

227.31 100.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $35.00 $3,500.00 $21.00 $2,100.00

241.12 43.000 FT 12 INCH REINFORCED CONCRETE PIPE CLASS III $180.00 $7,740.00 $195.00 $8,385.00

357.12 20.000 EA 12 INCH GATE BOX $500.00 $10,000.00 $1,355.00 $27,100.00

358. 80.000 EA GATE BOX ADJUSTED $250.00 $20,000.00 $213.00 $17,040.00

376.2 3.000 EA HYDRANT - REMOVED AND RESET $4,000.00 $12,000.00 $4,880.00 $14,640.00

402. 17.000 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $120.00 $2,040.00 $74.00 $1,258.00

415.2 34,730.000 SY PAVEMENT FINE MILLING $10.00 $347,300.00 $5.00 $173,650.00

440. 19,500.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST

CONTROL

$0.50 $9,750.00 $0.01 $195.00

443. 12.000 MGL WATER FOR ROADWAY DUST CONTROL $120.00 $1,440.00 $158.00 $1,896.00

450.231 3,910.000 TON SUPERPAVE SURFACE COURSE - 12.5 POLYMER

(SSC - 12.5 - P)

$180.00 $703,800.00 $109.00 $426,190.00

450.32 70.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -

19.0)

$250.00 $17,500.00 $163.00 $11,410.00

450.42 34.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $250.00 $8,500.00 $170.00 $5,780.00

450.53 170.000 TON SUPERPAVE LEVELING COURSE - 12.5 (SLC - 12.5) $250.00 $42,500.00 $128.00 $21,760.00

451. 20.000 TON HMA FOR PATCHING $400.00 $8,000.00 $306.00 $6,120.00

452. 2,455.000 GAL ASPHALT EMULSION FOR TACK COAT $10.00 $24,550.00 $8.00 $19,640.00

453. 820.000 FT HMA JOINT ADHESIVE $3.00 $2,460.00 $1.25 $1,025.00

472. 107.000 TON TEMPORARY ASPHALT PATCHING $390.00 $41,730.00 $247.00 $26,429.00

477.2 11,220.000 FT MILLED RUMBLE STRIP (TYPE C) $2.50 $28,050.00 $1.60 $17,952.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 2 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

Office Estimate A F AMORELLO & SONS INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

506. 1,378.000 FT GRANITE CURB TYPE VB - STRAIGHT $70.00 $96,460.00 $48.00 $66,144.00

506.1 159.000 FT GRANITE CURB TYPE VB - CURVED $80.00 $12,720.00 $59.00 $9,381.00

506.2 408.000 FT GRANITE CURB WALL $120.00 $48,960.00 $60.00 $24,480.00

509. 1,449.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - STRAIGHT

$65.00 $94,185.00 $61.00 $88,389.00

509.1 344.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - CURVED

$80.00 $27,520.00 $67.00 $23,048.00

509.2 24.000 FT GRANITE VERTICAL TO SLOPED TRANSITION CURB $100.00 $2,400.00 $67.00 $1,608.00

514. 7.000 EA GRANITE CURB INLET - STRAIGHT $700.00 $4,900.00 $498.00 $3,486.00

516. 35.000 EA GRANITE CURB CORNER TYPE A $400.00 $14,000.00 $305.00 $10,675.00

580. 3,500.000 FT CURB REMOVED AND RESET $35.00 $122,500.00 $31.00 $108,500.00

581. 15.000 EA CURB INLET REMOVED AND RESET $350.00 $5,250.00 $176.00 $2,640.00

582. 2.000 EA CURB CORNER REMOVED AND RESET $300.00 $600.00 $294.00 $588.00

594. 1,747.000 FT CURB REMOVED AND DISCARDED $10.00 $17,470.00 $10.00 $17,470.00

595. 5.000 EA CURB INLET REMOVED AND DISCARDED $75.00 $375.00 $7.00 $35.00

597. 198.000 FT EDGING REMOVED AND DISCARDED $12.00 $2,376.00 $2.50 $495.00

620.12 160.000 FT GUARDRAIL, TL-2 (SINGLE FACED) $35.00 $5,600.00 $40.00 $6,400.00

627.1 1.000 EA TRAILING ANCHORAGE $2,700.00 $2,700.00 $2,297.00 $2,297.00

627.82 2.000 EA GUARDRAIL TANGENT END TREATMENT, TL-2 $6,000.00 $12,000.00 $5,790.00 $11,580.00

628.21 1.000 EA TRANSITION TO NCHRP 350 GUARDRAIL $1,500.00 $1,500.00 $1,764.00 $1,764.00

630.2 394.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $3.00 $1,182.00 $8.00 $3,152.00

670. 15.000 FT FENCE REMOVED AND RESET $80.00 $1,200.00 $111.00 $1,665.00

697.1 141.000 EA SILT SACK $200.00 $28,200.00 $95.00 $13,395.00

701. 394.000 SY CEMENT CONCRETE SIDEWALK $90.00 $35,460.00 $77.00 $30,338.00

701.1 1,235.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $100.00 $123,500.00 $97.00 $119,795.00

701.2 640.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $115.00 $73,600.00 $116.00 $74,240.00

702. 750.000 TON HOT MIX ASPHALT SIDEWALK OR DRIVEWAY $300.00 $225,000.00 $238.00 $178,500.00

706.1 11.000 SY BRICK WALK REMOVED AND RELAID $450.00 $4,950.00 $805.00 $8,855.00

706.13 11.000 SY STAMPED CEMENT CONCRETE SIDEWALK $200.00 $2,200.00 $1,418.00 $15,598.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 3 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

Office Estimate A F AMORELLO & SONS INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

710.3 3.000 EA BOUND - LETTERED GRANITE $600.00 $1,800.00 $1,933.00 $5,799.00

710.4 3.000 EA BOUND - PLAIN GRANITE $750.00 $2,250.00 $2,035.00 $6,105.00

711. 5.000 EA BOUND REMOVED AND RESET $800.00 $4,000.00 $1,053.00 $5,265.00

722.3 1.000 LS SCHEDULE OF OPERATIONS (TYPE C) - FIXED

PRICE $32,500

$32,500.00 $32,500.00 $32,500.00 $32,500.00

740. 21.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE

A)

$3,400.00 $71,400.00 $4,144.00 $87,024.00

748. 1.000 LS MOBILIZATION $100,800.00 $100,800.00 $81,638.00 $81,638.00

751.1 200.000 CY LOAM FOR LAWNS $100.00 $20,000.00 $84.00 $16,800.00

756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION

PLAN

$10,000.00 $10,000.00 $4,737.00 $4,737.00

765. 1,770.000 SY SEEDING $5.00 $8,850.00 $2.00 $3,540.00

767.121 1,970.000 FT SEDIMENT CONTROL BARRIER $6.00 $11,820.00 $11.00 $21,670.00

804.3 832.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -

(UL)

$65.00 $54,080.00 $52.00 $43,264.00

811.31 19.000 EA PULL BOX 12 X 12 INCHES - SD2.031 $1,700.00 $32,300.00 $1,800.00 $34,200.00

813.80 1.000 EA SERVICE CONNECTION (OVERHEAD) $7,000.00 $7,000.00 $12,576.00 $12,576.00

824.53 1.000 LS FLASHING PEDESTRIAN CROSSING BEACON, POLE,

AND FOUNDATION REMOVED AND DISCARDED

$5,000.00 $5,000.00 $5,994.00 $5,994.00

825.4 3.000 EA RRFB (AC POWERED 2-POST ASSEMBLY SYSTEM)

WITH CROSSWALK LIGHT

$20,000.00 $60,000.00 $26,761.00 $80,283.00

832. 442.000 SF WARNING-REGULATORY AND ROUTE MARKER -

ALUMINUM PANEL (TYPE A)

$30.00 $13,260.00 $27.00 $11,934.00

847.1 67.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

$300.00 $20,100.00 $284.00 $19,028.00

848.1 15.000 EA SIGN SUP (NOT GUIDE)+RTE MKR W/2 BRKWAY

POST ASSEMBLIES-STEEL

$800.00 $12,000.00 $462.00 $6,930.00

852. 520.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $16.00 $8,320.00 $22.00 $11,440.00

852.11 100.000 FT TEMPORARY PEDESTRIAN BARRICADE $50.00 $5,000.00 $22.00 $2,200.00

852.12 10.000 EA TEMPORARY PEDESTRIAN CURB RAMP $1,000.00 $10,000.00 $533.00 $5,330.00

853.1 16.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $200.00 $3,200.00 $207.00 $3,312.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 4 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

Office Estimate A F AMORELLO & SONS INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

854.016 14,000.000 FT TEMPORARY PAVING MARKINGS - 6 INCH

(PAINTED)

$0.80 $11,200.00 $0.50 $7,000.00

854.1 450.000 SF PAVEMENT MARKING REMOVAL $4.00 $1,800.00 $4.00 $1,800.00

856.060 1,080.000 DAY ARROW BOARD (TYPE B) $10.00 $10,800.00 $14.00 $15,120.00

856.12 1,140.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $25.00 $28,500.00 $30.00 $34,200.00

859. 59,400.000 DAY REFLECTORIZED DRUM $0.25 $14,850.00 $0.30 $17,820.00

864.04 640.000 SF PAVEMENT ARROWS AND LEGENDS

REFLECTORIZED WHITE (THERMOPLASTIC)

$12.00 $7,680.00 $21.00 $13,440.00

864.41 4,330.000 SF GREEN COLORIZED PAVEMENT MARKINGS $20.00 $86,600.00 $9.00 $38,970.00

866.106 28,300.000 FT 6 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$1.00 $28,300.00 $2.00 $56,600.00

866.112 10,450.000 FT 12 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$5.00 $52,250.00 $5.00 $52,250.00

867.106 13,980.000 FT 6 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$1.00 $13,980.00 $2.00 $27,960.00

867.112 100.000 FT 12 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$9.00 $900.00 $5.00 $500.00

874. 58.000 EA STREET NAME SIGN $180.00 $10,440.00 $207.00 $12,006.00

874.1 10.000 EA STREET SIGN REMOVED AND RESET $180.00 $1,800.00 $154.00 $1,540.00

874.2 26.000 EA TRAFFIC SIGN REMOVED AND RESET $150.00 $3,900.00 $154.00 $4,004.00

874.4 8.000 EA TRAFFIC SIGN REMOVED AND STACKED $80.00 $640.00 $59.00 $472.00

874.41 25.000 EA TRAFFIC SIGN REMOVED AND DISCARDED $50.00 $1,250.00 $59.00 $1,475.00

903. 4.000 CY 3000 PSI, 1.5 INCH, 470 CEMENT CONCRETE $1,275.00 $5,100.00 $535.00 $2,140.00

904. 5.000 CY 4000 PSI, 3/4 INCH, 610 CEMENT CONCRETE $2,300.00 $11,500.00 $545.00 $2,725.00

Total : $3,924,628.00 Total : $3,260,984.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 5 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

J H LYNCH & SONS INC P J ALBERT INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

101.1 0.200 A CLEARING $70,000.00 $14,000.00 $60,000.00 $12,000.00

102.1 1,430.000 FT TREE TRIMMING $10.00 $14,300.00 $10.00 $14,300.00

102.513 45.000 FT AIR EXCAVATION AND ROOT PRUNING $65.00 $2,925.00 $60.00 $2,700.00

102.521 185.000 FT TREE AND PLANT PROTECTION FENCE $15.00 $2,775.00 $15.00 $2,775.00

102.55 40.000 HR ARBORIST $250.00 $10,000.00 $225.00 $9,000.00

120.1 3,325.000 CY UNCLASSIFIED EXCAVATION $30.00 $99,750.00 $78.00 $259,350.00

141.1 25.000 CY TEST PIT FOR EXPLORATION $125.00 $3,125.00 $160.00 $4,000.00

142. 10.000 CY CLASS B TRENCH EXCAVATION $0.01 $0.10 $75.00 $750.00

144. 1.000 CY CLASS B ROCK EXCAVATION $500.00 $500.00 $200.00 $200.00

146. 2.000 EA DRAINAGE STRUCTURE REMOVED $2,000.00 $4,000.00 $750.00 $1,500.00

151. 1,460.000 CY GRAVEL BORROW $15.00 $21,900.00 $45.00 $65,700.00

151.01 330.000 CY GRAVEL BORROW - TYPE C $50.00 $16,500.00 $65.00 $21,450.00

156. 15.000 TON CRUSHED STONE $85.00 $1,275.00 $100.00 $1,500.00

170. 7,020.000 SY FINE GRADING AND COMPACTING - SUBGRADE

AREA

$22.50 $157,950.00 $20.00 $140,400.00

180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $2,910.00 $2,910.00 $10,000.00 $10,000.00

180.02 40.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $0.01 $0.40 $10.00 $400.00

180.03 20.000 HR LICENSED SITE PROFESSIONAL SERVICES $112.00 $2,240.00 $200.00 $4,000.00

181.11 2,900.000 TON DISPOSAL OF UNREGULATED SOIL $20.00 $58,000.00 $5.00 $14,500.00

181.12 310.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE

FACILITY

$45.00 $13,950.00 $10.00 $3,100.00

181.13 580.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE

FACILITY

$50.00 $29,000.00 $10.00 $5,800.00

181.14 80.000 TON DISPOSAL OF HAZARDOUS WASTE $0.01 $0.80 $75.00 $6,000.00

201. 4.000 EA CATCH BASIN $3,775.00 $15,100.00 $8,000.00 $32,000.00

202. 2.000 EA MANHOLE $5,375.00 $10,750.00 $8,000.00 $16,000.00

220. 126.000 EA DRAINAGE STRUCTURE ADJUSTED $425.00 $53,550.00 $500.00 $63,000.00

220.3 1.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $750.00 $750.00 $1,000.00 $1,000.00

220.7 39.000 EA SANITARY STRUCTURE ADJUSTED $525.00 $20,475.00 $500.00 $19,500.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 6 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

J H LYNCH & SONS INC P J ALBERT INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

222.1 45.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $725.00 $32,625.00 $1,500.00 $67,500.00

222.3 5.000 EA FRAME AND GRATE (OR COVER) MUNICIPAL

STANDARD

$725.00 $3,625.00 $1,100.00 $5,500.00

222.31 1.000 EA SPECIAL FRAME AND GRATE - VERTICAL TYPE $2,500.00 $2,500.00 $3,000.00 $3,000.00

223.1 45.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

STACKED

$200.00 $9,000.00 $50.00 $2,250.00

223.2 15.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

DISCARDED

$200.00 $3,000.00 $50.00 $750.00

224.12 3.000 EA 12 INCH HOOD $225.00 $675.00 $500.00 $1,500.00

227.3 180.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $250.00 $45,000.00 $335.00 $60,300.00

227.31 100.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $20.00 $2,000.00 $15.00 $1,500.00

241.12 43.000 FT 12 INCH REINFORCED CONCRETE PIPE CLASS III $275.00 $11,825.00 $300.00 $12,900.00

357.12 20.000 EA 12 INCH GATE BOX $1,750.00 $35,000.00 $850.00 $17,000.00

358. 80.000 EA GATE BOX ADJUSTED $400.00 $32,000.00 $225.00 $18,000.00

376.2 3.000 EA HYDRANT - REMOVED AND RESET $5,000.00 $15,000.00 $3,800.00 $11,400.00

402. 17.000 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $175.00 $2,975.00 $100.00 $1,700.00

415.2 34,730.000 SY PAVEMENT FINE MILLING $5.25 $182,332.50 $4.50 $156,285.00

440. 19,500.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST

CONTROL

$0.01 $195.00 $0.25 $4,875.00

443. 12.000 MGL WATER FOR ROADWAY DUST CONTROL $0.01 $0.12 $10.00 $120.00

450.231 3,910.000 TON SUPERPAVE SURFACE COURSE - 12.5 POLYMER

(SSC - 12.5 - P)

$160.00 $625,600.00 $146.00 $570,860.00

450.32 70.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -

19.0)

$175.00 $12,250.00 $350.00 $24,500.00

450.42 34.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $350.00 $11,900.00 $350.00 $11,900.00

450.53 170.000 TON SUPERPAVE LEVELING COURSE - 12.5 (SLC - 12.5) $225.00 $38,250.00 $225.00 $38,250.00

451. 20.000 TON HMA FOR PATCHING $300.00 $6,000.00 $350.00 $7,000.00

452. 2,455.000 GAL ASPHALT EMULSION FOR TACK COAT $9.00 $22,095.00 $0.01 $24.55

453. 820.000 FT HMA JOINT ADHESIVE $4.50 $3,690.00 $2.00 $1,640.00

472. 107.000 TON TEMPORARY ASPHALT PATCHING $300.00 $32,100.00 $375.00 $40,125.00

477.2 11,220.000 FT MILLED RUMBLE STRIP (TYPE C) $2.00 $22,440.00 $2.00 $22,440.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 7 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

J H LYNCH & SONS INC P J ALBERT INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

506. 1,378.000 FT GRANITE CURB TYPE VB - STRAIGHT $55.00 $75,790.00 $65.00 $89,570.00

506.1 159.000 FT GRANITE CURB TYPE VB - CURVED $70.00 $11,130.00 $85.00 $13,515.00

506.2 408.000 FT GRANITE CURB WALL $70.00 $28,560.00 $80.00 $32,640.00

509. 1,449.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - STRAIGHT

$70.00 $101,430.00 $75.00 $108,675.00

509.1 344.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - CURVED

$75.00 $25,800.00 $95.00 $32,680.00

509.2 24.000 FT GRANITE VERTICAL TO SLOPED TRANSITION CURB $80.00 $1,920.00 $100.00 $2,400.00

514. 7.000 EA GRANITE CURB INLET - STRAIGHT $550.00 $3,850.00 $650.00 $4,550.00

516. 35.000 EA GRANITE CURB CORNER TYPE A $400.00 $14,000.00 $425.00 $14,875.00

580. 3,500.000 FT CURB REMOVED AND RESET $40.00 $140,000.00 $40.00 $140,000.00

581. 15.000 EA CURB INLET REMOVED AND RESET $250.00 $3,750.00 $300.00 $4,500.00

582. 2.000 EA CURB CORNER REMOVED AND RESET $200.00 $400.00 $175.00 $350.00

594. 1,747.000 FT CURB REMOVED AND DISCARDED $8.50 $14,849.50 $8.00 $13,976.00

595. 5.000 EA CURB INLET REMOVED AND DISCARDED $185.00 $925.00 $50.00 $250.00

597. 198.000 FT EDGING REMOVED AND DISCARDED $8.50 $1,683.00 $10.00 $1,980.00

620.12 160.000 FT GUARDRAIL, TL-2 (SINGLE FACED) $35.00 $5,600.00 $30.00 $4,800.00

627.1 1.000 EA TRAILING ANCHORAGE $2,100.00 $2,100.00 $2,000.00 $2,000.00

627.82 2.000 EA GUARDRAIL TANGENT END TREATMENT, TL-2 $4,500.00 $9,000.00 $4,500.00 $9,000.00

628.21 1.000 EA TRANSITION TO NCHRP 350 GUARDRAIL $1,900.00 $1,900.00 $1,800.00 $1,800.00

630.2 394.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $4.00 $1,576.00 $2.25 $886.50

670. 15.000 FT FENCE REMOVED AND RESET $95.00 $1,425.00 $60.00 $900.00

697.1 141.000 EA SILT SACK $0.01 $1.41 $135.00 $19,035.00

701. 394.000 SY CEMENT CONCRETE SIDEWALK $80.00 $31,520.00 $80.00 $31,520.00

701.1 1,235.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $110.00 $135,850.00 $90.00 $111,150.00

701.2 640.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $125.00 $80,000.00 $130.00 $83,200.00

702. 750.000 TON HOT MIX ASPHALT SIDEWALK OR DRIVEWAY $225.00 $168,750.00 $225.00 $168,750.00

706.1 11.000 SY BRICK WALK REMOVED AND RELAID $250.00 $2,750.00 $600.00 $6,600.00

706.13 11.000 SY STAMPED CEMENT CONCRETE SIDEWALK $600.00 $6,600.00 $1,500.00 $16,500.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 8 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

J H LYNCH & SONS INC P J ALBERT INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

710.3 3.000 EA BOUND - LETTERED GRANITE $900.00 $2,700.00 $1,000.00 $3,000.00

710.4 3.000 EA BOUND - PLAIN GRANITE $850.00 $2,550.00 $1,400.00 $4,200.00

711. 5.000 EA BOUND REMOVED AND RESET $775.00 $3,875.00 $650.00 $3,250.00

722.3 1.000 LS SCHEDULE OF OPERATIONS (TYPE C) - FIXED

PRICE $32,500

$32,500.00 $32,500.00 $32,500.00 $32,500.00

740. 21.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE

A)

$4,500.00 $94,500.00 $3,500.00 $73,500.00

748. 1.000 LS MOBILIZATION $60,000.00 $60,000.00 $100,000.00 $100,000.00

751.1 200.000 CY LOAM FOR LAWNS $120.00 $24,000.00 $75.00 $15,000.00

756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION

PLAN

$20,000.00 $20,000.00 $5,000.00 $5,000.00

765. 1,770.000 SY SEEDING $3.00 $5,310.00 $3.00 $5,310.00

767.121 1,970.000 FT SEDIMENT CONTROL BARRIER $6.00 $11,820.00 $5.50 $10,835.00

804.3 832.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -

(UL)

$105.00 $87,360.00 $80.00 $66,560.00

811.31 19.000 EA PULL BOX 12 X 12 INCHES - SD2.031 $1,500.00 $28,500.00 $1,500.00 $28,500.00

813.80 1.000 EA SERVICE CONNECTION (OVERHEAD) $1,000.00 $1,000.00 $4,000.00 $4,000.00

824.53 1.000 LS FLASHING PEDESTRIAN CROSSING BEACON, POLE,

AND FOUNDATION REMOVED AND DISCARDED

$3,500.00 $3,500.00 $6,750.00 $6,750.00

825.4 3.000 EA RRFB (AC POWERED 2-POST ASSEMBLY SYSTEM)

WITH CROSSWALK LIGHT

$30,000.00 $90,000.00 $18,500.00 $55,500.00

832. 442.000 SF WARNING-REGULATORY AND ROUTE MARKER -

ALUMINUM PANEL (TYPE A)

$30.00 $13,260.00 $16.50 $7,293.00

847.1 67.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

$315.00 $21,105.00 $300.00 $20,100.00

848.1 15.000 EA SIGN SUP (NOT GUIDE)+RTE MKR W/2 BRKWAY

POST ASSEMBLIES-STEEL

$465.00 $6,975.00 $427.00 $6,405.00

852. 520.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $35.00 $18,200.00 $20.00 $10,400.00

852.11 100.000 FT TEMPORARY PEDESTRIAN BARRICADE $40.00 $4,000.00 $25.00 $2,500.00

852.12 10.000 EA TEMPORARY PEDESTRIAN CURB RAMP $500.00 $5,000.00 $500.00 $5,000.00

853.1 16.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $100.00 $1,600.00 $165.00 $2,640.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 9 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

J H LYNCH & SONS INC P J ALBERT INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

854.016 14,000.000 FT TEMPORARY PAVING MARKINGS - 6 INCH

(PAINTED)

$0.60 $8,400.00 $0.30 $4,200.00

854.1 450.000 SF PAVEMENT MARKING REMOVAL $7.50 $3,375.00 $2.75 $1,237.50

856.060 1,080.000 DAY ARROW BOARD (TYPE B) $0.01 $10.80 $18.00 $19,440.00

856.12 1,140.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $15.00 $17,100.00 $18.00 $20,520.00

859. 59,400.000 DAY REFLECTORIZED DRUM $0.20 $11,880.00 $0.20 $11,880.00

864.04 640.000 SF PAVEMENT ARROWS AND LEGENDS

REFLECTORIZED WHITE (THERMOPLASTIC)

$60.00 $38,400.00 $54.00 $34,560.00

864.41 4,330.000 SF GREEN COLORIZED PAVEMENT MARKINGS $10.00 $43,300.00 $16.95 $73,393.50

866.106 28,300.000 FT 6 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$2.50 $70,750.00 $1.25 $35,375.00

866.112 10,450.000 FT 12 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$3.50 $36,575.00 $5.95 $62,177.50

867.106 13,980.000 FT 6 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$1.25 $17,475.00 $1.25 $17,475.00

867.112 100.000 FT 12 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$3.50 $350.00 $5.95 $595.00

874. 58.000 EA STREET NAME SIGN $175.00 $10,150.00 $100.00 $5,800.00

874.1 10.000 EA STREET SIGN REMOVED AND RESET $130.00 $1,300.00 $25.00 $250.00

874.2 26.000 EA TRAFFIC SIGN REMOVED AND RESET $130.00 $3,380.00 $30.00 $780.00

874.4 8.000 EA TRAFFIC SIGN REMOVED AND STACKED $50.00 $400.00 $25.00 $200.00

874.41 25.000 EA TRAFFIC SIGN REMOVED AND DISCARDED $50.00 $1,250.00 $20.00 $500.00

903. 4.000 CY 3000 PSI, 1.5 INCH, 470 CEMENT CONCRETE $225.00 $900.00 $2,500.00 $10,000.00

904. 5.000 CY 4000 PSI, 3/4 INCH, 610 CEMENT CONCRETE $1,100.00 $5,500.00 $3,000.00 $15,000.00

Total : $3,387,214.63 Total : $3,489,973.55

CMS105 - Report Date: 7/28/2026 2:24 PM Page 10 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

MORAIS CONTRACTORS INC PJ KEATING COMPANY

Item # Quantity Units Description Unit Price Amount Unit Price Amount

101.1 0.200 A CLEARING $75,000.00 $15,000.00 $60,000.00 $12,000.00

102.1 1,430.000 FT TREE TRIMMING $15.00 $21,450.00 $8.00 $11,440.00

102.513 45.000 FT AIR EXCAVATION AND ROOT PRUNING $5.00 $225.00 $60.00 $2,700.00

102.521 185.000 FT TREE AND PLANT PROTECTION FENCE $15.00 $2,775.00 $15.00 $2,775.00

102.55 40.000 HR ARBORIST $250.00 $10,000.00 $180.00 $7,200.00

120.1 3,325.000 CY UNCLASSIFIED EXCAVATION $45.00 $149,625.00 $1.00 $3,325.00

141.1 25.000 CY TEST PIT FOR EXPLORATION $50.00 $1,250.00 $105.00 $2,625.00

142. 10.000 CY CLASS B TRENCH EXCAVATION $50.00 $500.00 $40.00 $400.00

144. 1.000 CY CLASS B ROCK EXCAVATION $150.00 $150.00 $400.00 $400.00

146. 2.000 EA DRAINAGE STRUCTURE REMOVED $500.00 $1,000.00 $1,000.00 $2,000.00

151. 1,460.000 CY GRAVEL BORROW $45.00 $65,700.00 $1.00 $1,460.00

151.01 330.000 CY GRAVEL BORROW - TYPE C $45.00 $14,850.00 $1.00 $330.00

156. 15.000 TON CRUSHED STONE $50.00 $750.00 $180.00 $2,700.00

170. 7,020.000 SY FINE GRADING AND COMPACTING - SUBGRADE

AREA

$5.00 $35,100.00 $21.00 $147,420.00

180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $6,000.00 $6,000.00 $40,000.00 $40,000.00

180.02 40.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $50.00 $2,000.00 $5.00 $200.00

180.03 20.000 HR LICENSED SITE PROFESSIONAL SERVICES $225.00 $4,500.00 $112.00 $2,240.00

181.11 2,900.000 TON DISPOSAL OF UNREGULATED SOIL $95.00 $275,500.00 $10.00 $29,000.00

181.12 310.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE

FACILITY

$100.00 $31,000.00 $20.00 $6,200.00

181.13 580.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE

FACILITY

$0.01 $5.80 $21.00 $12,180.00

181.14 80.000 TON DISPOSAL OF HAZARDOUS WASTE $0.01 $0.80 $40.00 $3,200.00

201. 4.000 EA CATCH BASIN $7,000.00 $28,000.00 $4,000.00 $16,000.00

202. 2.000 EA MANHOLE $7,000.00 $14,000.00 $4,000.00 $8,000.00

220. 126.000 EA DRAINAGE STRUCTURE ADJUSTED $500.00 $63,000.00 $350.00 $44,100.00

220.3 1.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $1,200.00 $1,200.00 $500.00 $500.00

220.7 39.000 EA SANITARY STRUCTURE ADJUSTED $500.00 $19,500.00 $350.00 $13,650.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 11 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

MORAIS CONTRACTORS INC PJ KEATING COMPANY

Item # Quantity Units Description Unit Price Amount Unit Price Amount

222.1 45.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $1,200.00 $54,000.00 $1,100.00 $49,500.00

222.3 5.000 EA FRAME AND GRATE (OR COVER) MUNICIPAL

STANDARD

$1,200.00 $6,000.00 $850.00 $4,250.00

222.31 1.000 EA SPECIAL FRAME AND GRATE - VERTICAL TYPE $1,800.00 $1,800.00 $1,500.00 $1,500.00

223.1 45.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

STACKED

$25.00 $1,125.00 $175.00 $7,875.00

223.2 15.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

DISCARDED

$25.00 $375.00 $5.00 $75.00

224.12 3.000 EA 12 INCH HOOD $500.00 $1,500.00 $200.00 $600.00

227.3 180.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $200.00 $36,000.00 $325.00 $58,500.00

227.31 100.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $20.00 $2,000.00 $15.00 $1,500.00

241.12 43.000 FT 12 INCH REINFORCED CONCRETE PIPE CLASS III $150.00 $6,450.00 $170.00 $7,310.00

357.12 20.000 EA 12 INCH GATE BOX $500.00 $10,000.00 $300.00 $6,000.00

358. 80.000 EA GATE BOX ADJUSTED $350.00 $28,000.00 $140.00 $11,200.00

376.2 3.000 EA HYDRANT - REMOVED AND RESET $3,000.00 $9,000.00 $6,000.00 $18,000.00

402. 17.000 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $150.00 $2,550.00 $100.00 $1,700.00

415.2 34,730.000 SY PAVEMENT FINE MILLING $5.00 $173,650.00 $6.00 $208,380.00

440. 19,500.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST

CONTROL

$0.01 $195.00 $0.01 $195.00

443. 12.000 MGL WATER FOR ROADWAY DUST CONTROL $100.00 $1,200.00 $50.00 $600.00

450.231 3,910.000 TON SUPERPAVE SURFACE COURSE - 12.5 POLYMER

(SSC - 12.5 - P)

$165.00 $645,150.00 $173.00 $676,430.00

450.32 70.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -

19.0)

$250.00 $17,500.00 $300.00 $21,000.00

450.42 34.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $250.00 $8,500.00 $300.00 $10,200.00

450.53 170.000 TON SUPERPAVE LEVELING COURSE - 12.5 (SLC - 12.5) $165.00 $28,050.00 $173.00 $29,410.00

451. 20.000 TON HMA FOR PATCHING $300.00 $6,000.00 $425.00 $8,500.00

452. 2,455.000 GAL ASPHALT EMULSION FOR TACK COAT $5.00 $12,275.00 $0.01 $24.55

453. 820.000 FT HMA JOINT ADHESIVE $3.00 $2,460.00 $3.00 $2,460.00

472. 107.000 TON TEMPORARY ASPHALT PATCHING $275.00 $29,425.00 $150.00 $16,050.00

477.2 11,220.000 FT MILLED RUMBLE STRIP (TYPE C) $1.50 $16,830.00 $1.00 $11,220.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 12 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

MORAIS CONTRACTORS INC PJ KEATING COMPANY

Item # Quantity Units Description Unit Price Amount Unit Price Amount

506. 1,378.000 FT GRANITE CURB TYPE VB - STRAIGHT $80.00 $110,240.00 $75.00 $103,350.00

506.1 159.000 FT GRANITE CURB TYPE VB - CURVED $90.00 $14,310.00 $85.00 $13,515.00

506.2 408.000 FT GRANITE CURB WALL $125.00 $51,000.00 $75.00 $30,600.00

509. 1,449.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - STRAIGHT

$90.00 $130,410.00 $105.00 $152,145.00

509.1 344.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - CURVED

$100.00 $34,400.00 $125.00 $43,000.00

509.2 24.000 FT GRANITE VERTICAL TO SLOPED TRANSITION CURB $100.00 $2,400.00 $125.00 $3,000.00

514. 7.000 EA GRANITE CURB INLET - STRAIGHT $500.00 $3,500.00 $450.00 $3,150.00

516. 35.000 EA GRANITE CURB CORNER TYPE A $500.00 $17,500.00 $360.00 $12,600.00

580. 3,500.000 FT CURB REMOVED AND RESET $45.00 $157,500.00 $50.00 $175,000.00

581. 15.000 EA CURB INLET REMOVED AND RESET $200.00 $3,000.00 $140.00 $2,100.00

582. 2.000 EA CURB CORNER REMOVED AND RESET $200.00 $400.00 $125.00 $250.00

594. 1,747.000 FT CURB REMOVED AND DISCARDED $8.00 $13,976.00 $20.00 $34,940.00

595. 5.000 EA CURB INLET REMOVED AND DISCARDED $50.00 $250.00 $50.00 $250.00

597. 198.000 FT EDGING REMOVED AND DISCARDED $8.00 $1,584.00 $20.00 $3,960.00

620.12 160.000 FT GUARDRAIL, TL-2 (SINGLE FACED) $40.00 $6,400.00 $30.00 $4,800.00

627.1 1.000 EA TRAILING ANCHORAGE $3,000.00 $3,000.00 $3,000.00 $3,000.00

627.82 2.000 EA GUARDRAIL TANGENT END TREATMENT, TL-2 $5,500.00 $11,000.00 $5,000.00 $10,000.00

628.21 1.000 EA TRANSITION TO NCHRP 350 GUARDRAIL $2,500.00 $2,500.00 $2,000.00 $2,000.00

630.2 394.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $6.00 $2,364.00 $6.00 $2,364.00

670. 15.000 FT FENCE REMOVED AND RESET $60.00 $900.00 $40.00 $600.00

697.1 141.000 EA SILT SACK $200.00 $28,200.00 $100.00 $14,100.00

701. 394.000 SY CEMENT CONCRETE SIDEWALK $85.00 $33,490.00 $165.00 $65,010.00

701.1 1,235.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $95.00 $117,325.00 $165.00 $203,775.00

701.2 640.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $120.00 $76,800.00 $220.00 $140,800.00

702. 750.000 TON HOT MIX ASPHALT SIDEWALK OR DRIVEWAY $275.00 $206,250.00 $650.00 $487,500.00

706.1 11.000 SY BRICK WALK REMOVED AND RELAID $150.00 $1,650.00 $275.00 $3,025.00

706.13 11.000 SY STAMPED CEMENT CONCRETE SIDEWALK $500.00 $5,500.00 $325.00 $3,575.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 13 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

MORAIS CONTRACTORS INC PJ KEATING COMPANY

Item # Quantity Units Description Unit Price Amount Unit Price Amount

710.3 3.000 EA BOUND - LETTERED GRANITE $500.00 $1,500.00 $525.00 $1,575.00

710.4 3.000 EA BOUND - PLAIN GRANITE $500.00 $1,500.00 $475.00 $1,425.00

711. 5.000 EA BOUND REMOVED AND RESET $350.00 $1,750.00 $590.00 $2,950.00

722.3 1.000 LS SCHEDULE OF OPERATIONS (TYPE C) - FIXED

PRICE $32,500

$32,500.00 $32,500.00 $32,500.00 $32,500.00

740. 21.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE

A)

$3,200.00 $67,200.00 $5,100.00 $107,100.00

748. 1.000 LS MOBILIZATION $107,550.29 $107,550.29 $110,000.00 $110,000.00

751.1 200.000 CY LOAM FOR LAWNS $60.00 $12,000.00 $40.00 $8,000.00

756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION

PLAN

$6,000.00 $6,000.00 $5,000.00 $5,000.00

765. 1,770.000 SY SEEDING $2.00 $3,540.00 $6.00 $10,620.00

767.121 1,970.000 FT SEDIMENT CONTROL BARRIER $10.00 $19,700.00 $5.25 $10,342.50

804.3 832.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -

(UL)

$75.00 $62,400.00 $150.00 $124,800.00

811.31 19.000 EA PULL BOX 12 X 12 INCHES - SD2.031 $1,500.00 $28,500.00 $2,500.00 $47,500.00

813.80 1.000 EA SERVICE CONNECTION (OVERHEAD) $15,000.00 $15,000.00 $250.00 $250.00

824.53 1.000 LS FLASHING PEDESTRIAN CROSSING BEACON, POLE,

AND FOUNDATION REMOVED AND DISCARDED

$5,000.00 $5,000.00 $2,000.00 $2,000.00

825.4 3.000 EA RRFB (AC POWERED 2-POST ASSEMBLY SYSTEM)

WITH CROSSWALK LIGHT

$25,000.00 $75,000.00 $25,000.00 $75,000.00

832. 442.000 SF WARNING-REGULATORY AND ROUTE MARKER -

ALUMINUM PANEL (TYPE A)

$32.00 $14,144.00 $23.00 $10,166.00

847.1 67.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

$280.00 $18,760.00 $240.00 $16,080.00

848.1 15.000 EA SIGN SUP (NOT GUIDE)+RTE MKR W/2 BRKWAY

POST ASSEMBLIES-STEEL

$500.00 $7,500.00 $390.00 $5,850.00

852. 520.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $25.00 $13,000.00 $10.00 $5,200.00

852.11 100.000 FT TEMPORARY PEDESTRIAN BARRICADE $50.00 $5,000.00 $24.00 $2,400.00

852.12 10.000 EA TEMPORARY PEDESTRIAN CURB RAMP $500.00 $5,000.00 $2,500.00 $25,000.00

853.1 16.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $150.00 $2,400.00 $200.00 $3,200.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 14 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

MORAIS CONTRACTORS INC PJ KEATING COMPANY

Item # Quantity Units Description Unit Price Amount Unit Price Amount

854.016 14,000.000 FT TEMPORARY PAVING MARKINGS - 6 INCH

(PAINTED)

$0.45 $6,300.00 $0.35 $4,900.00

854.1 450.000 SF PAVEMENT MARKING REMOVAL $3.00 $1,350.00 $3.00 $1,350.00

856.060 1,080.000 DAY ARROW BOARD (TYPE B) $15.00 $16,200.00 $8.00 $8,640.00

856.12 1,140.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $30.00 $34,200.00 $20.00 $22,800.00

859. 59,400.000 DAY REFLECTORIZED DRUM $0.30 $17,820.00 $0.18 $10,692.00

864.04 640.000 SF PAVEMENT ARROWS AND LEGENDS

REFLECTORIZED WHITE (THERMOPLASTIC)

$20.00 $12,800.00 $19.00 $12,160.00

864.41 4,330.000 SF GREEN COLORIZED PAVEMENT MARKINGS $12.00 $51,960.00 $8.50 $36,805.00

866.106 28,300.000 FT 6 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$1.60 $45,280.00 $1.70 $48,110.00

866.112 10,450.000 FT 12 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$5.00 $52,250.00 $4.25 $44,412.50

867.106 13,980.000 FT 6 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$1.75 $24,465.00 $1.70 $23,766.00

867.112 100.000 FT 12 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$6.00 $600.00 $4.25 $425.00

874. 58.000 EA STREET NAME SIGN $200.00 $11,600.00 $175.00 $10,150.00

874.1 10.000 EA STREET SIGN REMOVED AND RESET $150.00 $1,500.00 $130.00 $1,300.00

874.2 26.000 EA TRAFFIC SIGN REMOVED AND RESET $150.00 $3,900.00 $130.00 $3,380.00

874.4 8.000 EA TRAFFIC SIGN REMOVED AND STACKED $25.00 $200.00 $50.00 $400.00

874.41 25.000 EA TRAFFIC SIGN REMOVED AND DISCARDED $25.00 $625.00 $50.00 $1,250.00

903. 4.000 CY 3000 PSI, 1.5 INCH, 470 CEMENT CONCRETE $400.00 $1,600.00 $300.00 $1,200.00

904. 5.000 CY 4000 PSI, 3/4 INCH, 610 CEMENT CONCRETE $1,200.00 $6,000.00 $500.00 $2,500.00

Total : $3,692,559.89 Total : $3,884,132.55

CMS105 - Report Date: 7/28/2026 2:24 PM Page 15 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

R M PACELLA INC CARACAS CONSTRUCTION CORP

Item # Quantity Units Description Unit Price Amount Unit Price Amount

101.1 0.200 A CLEARING $62,000.00 $12,400.00 $100,000.00 $20,000.00

102.1 1,430.000 FT TREE TRIMMING $17.50 $25,025.00 $13.00 $18,590.00

102.513 45.000 FT AIR EXCAVATION AND ROOT PRUNING $55.00 $2,475.00 $20.00 $900.00

102.521 185.000 FT TREE AND PLANT PROTECTION FENCE $15.00 $2,775.00 $10.00 $1,850.00

102.55 40.000 HR ARBORIST $175.00 $7,000.00 $300.00 $12,000.00

120.1 3,325.000 CY UNCLASSIFIED EXCAVATION $53.00 $176,225.00 $90.00 $299,250.00

141.1 25.000 CY TEST PIT FOR EXPLORATION $152.00 $3,800.00 $110.00 $2,750.00

142. 10.000 CY CLASS B TRENCH EXCAVATION $0.01 $0.10 $90.00 $900.00

144. 1.000 CY CLASS B ROCK EXCAVATION $379.00 $379.00 $600.00 $600.00

146. 2.000 EA DRAINAGE STRUCTURE REMOVED $1,265.00 $2,530.00 $1,000.00 $2,000.00

151. 1,460.000 CY GRAVEL BORROW $72.00 $105,120.00 $95.00 $138,700.00

151.01 330.000 CY GRAVEL BORROW - TYPE C $72.00 $23,760.00 $100.00 $33,000.00

156. 15.000 TON CRUSHED STONE $69.00 $1,035.00 $125.00 $1,875.00

170. 7,020.000 SY FINE GRADING AND COMPACTING - SUBGRADE

AREA

$13.25 $93,015.00 $10.00 $70,200.00

180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $79,500.00 $79,500.00 $10,000.00 $10,000.00

180.02 40.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $10.00 $400.00 $10.00 $400.00

180.03 20.000 HR LICENSED SITE PROFESSIONAL SERVICES $225.00 $4,500.00 $100.00 $2,000.00

181.11 2,900.000 TON DISPOSAL OF UNREGULATED SOIL $21.00 $60,900.00 $100.00 $290,000.00

181.12 310.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE

FACILITY

$39.00 $12,090.00 $50.00 $15,500.00

181.13 580.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE

FACILITY

$41.00 $23,780.00 $50.00 $29,000.00

181.14 80.000 TON DISPOSAL OF HAZARDOUS WASTE $195.00 $15,600.00 $50.00 $4,000.00

201. 4.000 EA CATCH BASIN $5,400.00 $21,600.00 $6,000.00 $24,000.00

202. 2.000 EA MANHOLE $5,400.00 $10,800.00 $8,000.00 $16,000.00

220. 126.000 EA DRAINAGE STRUCTURE ADJUSTED $488.00 $61,488.00 $600.00 $75,600.00

220.3 1.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $1,284.00 $1,284.00 $1,800.00 $1,800.00

220.7 39.000 EA SANITARY STRUCTURE ADJUSTED $488.00 $19,032.00 $600.00 $23,400.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 16 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

R M PACELLA INC CARACAS CONSTRUCTION CORP

Item # Quantity Units Description Unit Price Amount Unit Price Amount

222.1 45.000 EA FRAME AND GRATE - MASSDOT CASCADE TYPE $1,390.00 $62,550.00 $2,000.00 $90,000.00

222.3 5.000 EA FRAME AND GRATE (OR COVER) MUNICIPAL

STANDARD

$1,010.00 $5,050.00 $1,800.00 $9,000.00

222.31 1.000 EA SPECIAL FRAME AND GRATE - VERTICAL TYPE $2,975.00 $2,975.00 $3,500.00 $3,500.00

223.1 45.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

STACKED

$25.00 $1,125.00 $10.00 $450.00

223.2 15.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

DISCARDED

$25.00 $375.00 $10.00 $150.00

224.12 3.000 EA 12 INCH HOOD $515.00 $1,545.00 $700.00 $2,100.00

227.3 180.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $79.00 $14,220.00 $400.00 $72,000.00

227.31 100.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $22.00 $2,200.00 $10.00 $1,000.00

241.12 43.000 FT 12 INCH REINFORCED CONCRETE PIPE CLASS III $446.00 $19,178.00 $200.00 $8,600.00

357.12 20.000 EA 12 INCH GATE BOX $499.00 $9,980.00 $1,100.00 $22,000.00

358. 80.000 EA GATE BOX ADJUSTED $332.00 $26,560.00 $500.00 $40,000.00

376.2 3.000 EA HYDRANT - REMOVED AND RESET $7,925.00 $23,775.00 $4,000.00 $12,000.00

402. 17.000 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $163.00 $2,771.00 $160.00 $2,720.00

415.2 34,730.000 SY PAVEMENT FINE MILLING $7.95 $276,103.50 $5.00 $173,650.00

440. 19,500.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST

CONTROL

$0.01 $195.00 $0.01 $195.00

443. 12.000 MGL WATER FOR ROADWAY DUST CONTROL $200.00 $2,400.00 $10.00 $120.00

450.231 3,910.000 TON SUPERPAVE SURFACE COURSE - 12.5 POLYMER

(SSC - 12.5 - P)

$181.00 $707,710.00 $167.00 $652,970.00

450.32 70.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -

19.0)

$289.00 $20,230.00 $255.00 $17,850.00

450.42 34.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $279.00 $9,486.00 $255.00 $8,670.00

450.53 170.000 TON SUPERPAVE LEVELING COURSE - 12.5 (SLC - 12.5) $229.00 $38,930.00 $170.00 $28,900.00

451. 20.000 TON HMA FOR PATCHING $371.00 $7,420.00 $350.00 $7,000.00

452. 2,455.000 GAL ASPHALT EMULSION FOR TACK COAT $9.50 $23,322.50 $3.50 $8,592.50

453. 820.000 FT HMA JOINT ADHESIVE $0.01 $8.20 $3.50 $2,870.00

472. 107.000 TON TEMPORARY ASPHALT PATCHING $245.00 $26,215.00 $350.00 $37,450.00

477.2 11,220.000 FT MILLED RUMBLE STRIP (TYPE C) $3.50 $39,270.00 $6.00 $67,320.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 17 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

R M PACELLA INC CARACAS CONSTRUCTION CORP

Item # Quantity Units Description Unit Price Amount Unit Price Amount

506. 1,378.000 FT GRANITE CURB TYPE VB - STRAIGHT $76.00 $104,728.00 $90.00 $124,020.00

506.1 159.000 FT GRANITE CURB TYPE VB - CURVED $99.00 $15,741.00 $100.00 $15,900.00

506.2 408.000 FT GRANITE CURB WALL $99.00 $40,392.00 $110.00 $44,880.00

509. 1,449.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - STRAIGHT

$84.00 $121,716.00 $90.00 $130,410.00

509.1 344.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - CURVED

$104.00 $35,776.00 $100.00 $34,400.00

509.2 24.000 FT GRANITE VERTICAL TO SLOPED TRANSITION CURB $158.00 $3,792.00 $700.00 $16,800.00

514. 7.000 EA GRANITE CURB INLET - STRAIGHT $775.00 $5,425.00 $1,000.00 $7,000.00

516. 35.000 EA GRANITE CURB CORNER TYPE A $545.00 $19,075.00 $700.00 $24,500.00

580. 3,500.000 FT CURB REMOVED AND RESET $56.00 $196,000.00 $70.00 $245,000.00

581. 15.000 EA CURB INLET REMOVED AND RESET $386.00 $5,790.00 $400.00 $6,000.00

582. 2.000 EA CURB CORNER REMOVED AND RESET $212.00 $424.00 $400.00 $800.00

594. 1,747.000 FT CURB REMOVED AND DISCARDED $12.00 $20,964.00 $1.00 $1,747.00

595. 5.000 EA CURB INLET REMOVED AND DISCARDED $68.00 $340.00 $1.00 $5.00

597. 198.000 FT EDGING REMOVED AND DISCARDED $12.00 $2,376.00 $1.00 $198.00

620.12 160.000 FT GUARDRAIL, TL-2 (SINGLE FACED) $44.00 $7,040.00 $33.00 $5,280.00

627.1 1.000 EA TRAILING ANCHORAGE $3,850.00 $3,850.00 $2,200.00 $2,200.00

627.82 2.000 EA GUARDRAIL TANGENT END TREATMENT, TL-2 $6,250.00 $12,500.00 $5,000.00 $10,000.00

628.21 1.000 EA TRANSITION TO NCHRP 350 GUARDRAIL $2,625.00 $2,625.00 $2,000.00 $2,000.00

630.2 394.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $10.00 $3,940.00 $2.60 $1,024.40

670. 15.000 FT FENCE REMOVED AND RESET $45.00 $675.00 $65.00 $975.00

697.1 141.000 EA SILT SACK $175.00 $24,675.00 $450.00 $63,450.00

701. 394.000 SY CEMENT CONCRETE SIDEWALK $119.00 $46,886.00 $140.00 $55,160.00

701.1 1,235.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $119.00 $146,965.00 $160.00 $197,600.00

701.2 640.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $145.00 $92,800.00 $220.00 $140,800.00

702. 750.000 TON HOT MIX ASPHALT SIDEWALK OR DRIVEWAY $286.00 $214,500.00 $260.00 $195,000.00

706.1 11.000 SY BRICK WALK REMOVED AND RELAID $566.00 $6,226.00 $1,000.00 $11,000.00

706.13 11.000 SY STAMPED CEMENT CONCRETE SIDEWALK $305.00 $3,355.00 $800.00 $8,800.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 18 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

R M PACELLA INC CARACAS CONSTRUCTION CORP

Item # Quantity Units Description Unit Price Amount Unit Price Amount

710.3 3.000 EA BOUND - LETTERED GRANITE $695.00 $2,085.00 $750.00 $2,250.00

710.4 3.000 EA BOUND - PLAIN GRANITE $695.00 $2,085.00 $750.00 $2,250.00

711. 5.000 EA BOUND REMOVED AND RESET $695.00 $3,475.00 $850.00 $4,250.00

722.3 1.000 LS SCHEDULE OF OPERATIONS (TYPE C) - FIXED

PRICE $32,500

$32,500.00 $32,500.00 $32,500.00 $32,500.00

740. 21.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE

A)

$4,450.00 $93,450.00 $3,500.00 $73,500.00

748. 1.000 LS MOBILIZATION $122,000.00 $122,000.00 $130,000.00 $130,000.00

751.1 200.000 CY LOAM FOR LAWNS $94.00 $18,800.00 $125.00 $25,000.00

756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION

PLAN

$25,000.00 $25,000.00 $40,000.00 $40,000.00

765. 1,770.000 SY SEEDING $4.50 $7,965.00 $2.00 $3,540.00

767.121 1,970.000 FT SEDIMENT CONTROL BARRIER $9.75 $19,207.50 $15.00 $29,550.00

804.3 832.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -

(UL)

$192.00 $159,744.00 $55.00 $45,760.00

811.31 19.000 EA PULL BOX 12 X 12 INCHES - SD2.031 $2,125.00 $40,375.00 $1,000.00 $19,000.00

813.80 1.000 EA SERVICE CONNECTION (OVERHEAD) $14,500.00 $14,500.00 $2,400.00 $2,400.00

824.53 1.000 LS FLASHING PEDESTRIAN CROSSING BEACON, POLE,

AND FOUNDATION REMOVED AND DISCARDED

$4,250.00 $4,250.00 $5,500.00 $5,500.00

825.4 3.000 EA RRFB (AC POWERED 2-POST ASSEMBLY SYSTEM)

WITH CROSSWALK LIGHT

$47,500.00 $142,500.00 $30,000.00 $90,000.00

832. 442.000 SF WARNING-REGULATORY AND ROUTE MARKER -

ALUMINUM PANEL (TYPE A)

$23.00 $10,166.00 $23.00 $10,166.00

847.1 67.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

$295.00 $19,765.00 $300.00 $20,100.00

848.1 15.000 EA SIGN SUP (NOT GUIDE)+RTE MKR W/2 BRKWAY

POST ASSEMBLIES-STEEL

$425.00 $6,375.00 $560.00 $8,400.00

852. 520.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $52.00 $27,040.00 $34.00 $17,680.00

852.11 100.000 FT TEMPORARY PEDESTRIAN BARRICADE $22.00 $2,200.00 $85.00 $8,500.00

852.12 10.000 EA TEMPORARY PEDESTRIAN CURB RAMP $325.00 $3,250.00 $1,000.00 $10,000.00

853.1 16.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $145.00 $2,320.00 $160.00 $2,560.00

CMS105 - Report Date: 7/28/2026 2:24 PM Page 19 of 20

Location : WORCESTER Contract # : 134928 District : 3 Description : WORCESTER- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON PLEASANT STREET

R M PACELLA INC CARACAS CONSTRUCTION CORP

Item # Quantity Units Description Unit Price Amount Unit Price Amount

854.016 14,000.000 FT TEMPORARY PAVING MARKINGS - 6 INCH

(PAINTED)

$0.45 $6,300.00 $0.40 $5,600.00

854.1 450.000 SF PAVEMENT MARKING REMOVAL $5.00 $2,250.00 $3.50 $1,575.00

856.060 1,080.000 DAY ARROW BOARD (TYPE B) $15.00 $16,200.00 $10.00 $10,800.00

856.12 1,140.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $25.00 $28,500.00 $21.00 $23,940.00

859. 59,400.000 DAY REFLECTORIZED DRUM $0.25 $14,850.00 $0.25 $14,850.00

864.04 640.000 SF PAVEMENT ARROWS AND LEGENDS

REFLECTORIZED WHITE (THERMOPLASTIC)

$25.00 $16,000.00 $20.00 $12,800.00

864.41 4,330.000 SF GREEN COLORIZED PAVEMENT MARKINGS $11.25 $48,712.50 $9.00 $38,970.00

866.106 28,300.000 FT 6 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$2.00 $56,600.00 $1.70 $48,110.00

866.112 10,450.000 FT 12 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$5.50 $57,475.00 $4.50 $47,025.00

867.106 13,980.000 FT 6 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$2.00 $27,960.00 $1.70 $23,766.00

867.112 100.000 FT 12 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$5.50 $550.00 $4.50 $450.00

874. 58.000 EA STREET NAME SIGN $195.00 $11,310.00 $170.00 $9,860.00

874.1 10.000 EA STREET SIGN REMOVED AND RESET $50.00 $500.00 $170.00 $1,700.00

874.2 26.000 EA TRAFFIC SIGN REMOVED AND RESET $50.00 $1,300.00 $170.00 $4,420.00

874.4 8.000 EA TRAFFIC SIGN REMOVED AND STACKED $25.00 $200.00 $170.00 $1,360.00

874.41 25.000 EA TRAFFIC SIGN REMOVED AND DISCARDED $25.00 $625.00 $170.00 $4,250.00

903. 4.000 CY 3000 PSI, 1.5 INCH, 470 CEMENT CONCRETE $390.00 $1,560.00 $250.00 $1,000.00

904. 5.000 CY 4000 PSI, 3/4 INCH, 610 CEMENT CONCRETE $1,220.00 $6,100.00 $3,300.00 $16,500.00

Total : $4,284,728.30 Total : $4,558,253.90