About this file
This is a solicitation for a firm fixed-price construction contract to complete renovations to Building 620 at the United States Military Academy in West Point, New York. The scope of work includes a full renovation of the existing 75-room barracks and administrative wing totaling 5,959 square feet, as well as renovations to the entire 54,237 square foot building. Renovations will address failing building systems and components, hazardous materials abatement, and upgrades to mechanical, electrical and plumbing systems. Exterior work includes repairs to the roof, windows, walls and supporting utility infrastructure. The period of performance is approximately 610 calendar days from notice to proceed. The estimated value of construction is between $25 million and $100 million. The solicitation will be issued through beta.SAM.gov and responses are due in accordance with the solicitation schedule. Interested parties should monitor beta.SAM.gov for additional details and amendments.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
West Point Building 620 Repair West Point, NY
RTA Specifications Volume III
USACE New York District USACE Contract No. W91278-18-D-0004
May 29, 2020
West Point Building 620 Repair - West Point, NY Ready to Advertise 05/29/2020
THIS PAGE INTENTIONALLY LEFT BLANK
West Point Bldg. 620 Repair
West Point, NY
PN: 93952
May 29, 2020 Burns & McDonnell 9400 Ward Parkway
Kansas City, MO 64114
CERTIFICATION PAGE
CIVIL STRUCTURAL ARCHITECTURAL
FIRE PROTECTION MECHANICAL ELECTRICAL
5/29/20205/29/2020
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 01 COVER SHEET
00 00 02 CHECK LIST FOR BIDDERS
00 10 00 SF 1442 AND BIDDING SCHEDULE
00 21 16 INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
00 22 20 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
00 24 00 EVALUATION FACTORS FOR AWARD
00 72 00 CONTRACT CLAUSES
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS (WEST POINT)
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 85 00 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 03 00 CONSERVATION TREATMENT FOR PERIOD MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 52 00 METAL RAILINGS
PROJECT TABLE OF CONTENTS Page 1
VOLUME I
VOLUME II
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 31 26 SLATE SHINGLES
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 62 13 COPPER SHEET METAL FLASHING AND TRIM
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 65 66 RESILIENT ATHLETIC FLOORING
09 66 16 TERRAZZO FLOOR TILE
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 21 - FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION
PROJECT TABLE OF CONTENTS Page 2
VOLUME III
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.19 BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 21 23 HYDRONIC PUMPS
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING EQUIPMENT
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED AND HEATING WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS ENERGY
MANAGEMENT CONTROL SYSTEM (EMCS) BUILDING LEVEL ONLY
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FIRE
ALARM REPORTING SYSTEM/MASS NOTIFICATION SYSTEM BUILDING
LEVEL ONLY
25 10 10 ENERGY MONITORING AND CONTROL SYSTEM (EMCS) FRONT END AND
INTEGRATION
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY
APPLICATIONS
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 81 15 EMERGENCY RESPONDER RADIO COMMUNICATIONS SYSTEM (ERRCS)
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
PROJECT TABLE OF CONTENTS Page 3
VOLUME IV
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 01 30.72 RELINING SEWERS
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 40 00 STORM DRAINAGE UTILITIES
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
APPENDIX A - CYBERSECURITY CONTROLS LIST
SECTION 09 06 00
SCHEDULES FOR FINISHES
05/09
PART 1 GENERAL
1.1 SUMMARY
This section covers only the color of exterior and interior materials and products that are exposed to view in the finished construction. The word "color", as used herein, includes surface color and pattern. Requirements for quality, product specifications, and method of installation are covered in other appropriate sections of the specifications. Specific locations where the various materials are required are shown on the drawings if not identified in this specification. Items not designated for color in this section may be specified in other sections. When color is not designated for items, propose a color for approval.
PART 2 PRODUCTS
2.1 COLOR SCHEDULE
The color schedule information provided in the following paragraphs lists the colors, patterns and textures required for interior finishes, including both factory applied and field applied colors. Where color is shown as being specific to one manufacturer, an equivalent color by another manufacturer may be submitted for approval. Manufacturers and materials specified are not intended to limit the selection of equal colors from other manufacturers. In the case of difference between the drawings and specifications, colors identified in this specification govern.
2.2 EXTERIOR FINISHES
Reference drawings for manufacturer and color information.
2.3 INTERIOR FINISHES
2.3.1 Interior Floor Finishes
Provide flooring materials to match the colors listed below.
2.3.1.1 Solid Vinyl Tile
RF-1: Patcraft, Admix Collection, ADMIX I346V, Color: 00720 Dove Shell
2.3.1.2 Luxury Vinyl Tile
RF-3: Shaw Contract, Soundscape 4063V, Color: Almond 63703
2.3.1.3 Rubber Tile
RF-2: Tarkett, Replay, Color: Speckled Biscuit
SECTION 09 06 00 Page 1
2.3.1.4 Stair Tread and Landing
RFST-1: Tarkett, Color: Peppercorn
2.3.1.5 Porcelain Tile
TLP-1: Daltile, Volume 1.0, Color: Reverb Ash VL74
TLP-2: Daltile, Volume 1.0, Color: Accent Brown VL78
2.3.1.6 Grout
GR-1: Mapei, Color: Ivory
2.3.1.7 Entrance Mat
WOM-1, Construction Specialties, Floormations, FLM Honeycomb, Carpet: 00595 Obsidian
2.3.1.8 Terrazzo Tile
TER-1, Nurazzo, Designer's Choice, Color: DC-178
TER-2, Nurazzo, Designer's Choice, Color: DC-740
2.3.2 Interior Base Finishes
Provide base materials to match the colors listed below.
2.3.2.1 Resilient Base and Moldings
RB-1, Tarkett, Perceptions, Recessed Toe, Color: Peppercorn
RB-2, Tarkett, Traditional Duracove, Color: Peppercorn
2.3.2.2 Porcelain Tile
TLPB-1, Daltile, Volume 1.0, Color: Reverb Ash VL74
2.3.2.3 TERB-1
TERB-1, Nurazzo, Designer's Choice, Color: DC-178
2.3.2.4 Metal Cove Transition
MT-1, Schluter, DILEX-HKU, Color: Stainless Steel
2.3.3 Interior Wall Finishes
Apply interior wall color to the entire wall surface, including reveals, vertical furred spaces and columns, grilles, diffusers, electrical and access panels, and piping and conduit adjacent to wall surfaces unless otherwise specified. Paint items not specified in other paragraphs to match adjacent wall surface. Provide wall materials to match the colors listed below.
2.3.3.1 Paint
PA-2, Sherwin Williams, Color: Kestrel White SW7516
SECTION 09 06 00 Page 2
PA-3, Sherwin Williams, Color: Keystone Gray SW7504 PA-5, Sherwin Williams, Color: Riverway SW6222 PE-2, Sherwin Williams, Color: Kestrel White SW7516
2.3.3.2 Porcelain Tile
TLP-3, Daltile, Fabric Art, Color: Modern Linear Beige ML61 TLP-4, Daltile, Fabric Art, Color: Modern Kaleidoscope Natural Prism MK70 TLP-5, Daltile, Fabric Art, Color: Modern Kaleidoscope White Ash Prism MK71
2.3.3.3 Grout
GR-2, Mapei, Color: Alabaster
2.3.4 Interior Ceiling Finishes
Apply ceiling colors to ceiling surfaces including soffits, furred down areas, grilles, diffusers, registers, and access panels. In addition, apply ceiling color to joists, underside of roof deck, and conduit and piping where joists and deck are exposed and required to be painted.
Provide ceiling materials to match the colors listed below.
2.3.4.1 Acoustical Tile and Grid
ACT-1, USG, Mars High-NRC, Color: White ACT-2, USG, Mars Healthcare, Color: White
2.3.4.2 Paint (Ceilings)
PA-1, Sherwin Williams, Color: Ceiling Bright White SW7007 PE-1, Sherwin Williams, Color: Ceiling Bright White SW7007
2.3.5 Interior Trim
Provide interior trim to match the colors listed below.
2.3.5.1 Steel Doors
PA-4, Sherwin Williams, Color: Black Fox SW7020
2.3.5.2 Steel Door Frames
PA-4, Sherwin Williams, Color: Black Fox SW7020
2.3.5.3 Steel Windows (mullion, muntin, sash, trim, and stool)
PA-4, Sherwin Williams, Color: Black Fox SW7020
2.3.6 Interior Window Treatment
Provide window treatments to match the colors listed below.
2.3.6.1 Window Shades
RS-1, MechoSystems, Thermoveil Basket Weave, 1500 Series, Color:
Beige 1502 RS-2, MechoSystems, Distinctive Blackout, 800 Series, Color:
SECTION 09 06 00 Page 3
Latte 0803
2.3.7 Interior Miscellaneous
Provide miscellaneous items to match the colors listed below.
2.3.7.1 Toilet Partitions and Urinal Screens
TC-1, ASI Global Partitions, Ultimate Privacy, Solid Plastic (HDPE), Color: Charcoal 9237
2.3.7.2 Wood Stain
WDST-1, Color to match PLAM-1
2.3.7.3 Plastic Laminate
PLAM-1, Wilsonart, Color: Columbian Walnut 7943K-07
2.3.7.4 Solid Surfacing Material
SSF-1, Wilsonart, Color: Flint Rock
2.3.7.5 Window Sills (Solid Surface)
SSF-2, Corian, Color: Bisque
2.3.7.6 Corner Guards
CG-1,Koroseal, Korogard G100, Color: Fresh Brew CG-2, Wallguard.com, Clear Vinyl, 1-1/8 inch Wing 2335.1, Color:
Clear
2.3.7.7 Protective Wall Covering/Panel
FRP-1, Panolam, FRP, Color: Silver
2.3.7.8 Chair Rail
CHR-1, Inpro, 1500 Wall Guards, Color: Coffee Bean 0545
2.3.7.9 Shower Wall Kits, Trim and Shower Pan
SSF-3, Avonite, Color: Bone
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 09 06 00 Page 4
SECTION 09 22 00
SUPPORTS FOR PLASTER AND GYPSUM BOARD
02/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A463/A463M (2010; R 2015) Standard Specification for Steel Sheet, Aluminum-Coated, by the Hot-Dip Process
ASTM A653/A653M (2019) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM C645 (2014; E 2015) Nonstructural Steel Framing Members
ASTM C754 (2018) Standard Specification for Installation of Steel Framing Members to Receive Screw-Attached Gypsum Panel Products
ASTM C841 (2003; R 2013) Installation of Interior Lathing and Furring
NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM)
NAAMM EMLA 920 (2009) Guide Specifications for Metal Lathing and Furring
UNDERWRITERS LABORATORIES (UL)
UL Fire Resistance (2014) Fire Resistance Directory
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Metal Support Systems
Recycled Content for Metal Support Systems; S
SECTION 09 22 00 Page 1
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver materials to the job site and store in ventilated dry locations permitting easy access for inspection and handling. If materials are stored outdoors, stack materials off the ground, supported on a level platform, and fully protected from the weather. Handle materials carefully to prevent damage. Remove damaged items and provide new items.
PART 2 PRODUCTS
2.1 MATERIALS
Provide steel materials for metal support systems with galvanized coating ASTM A653/A653M , G-60; aluminum coating ASTM A463/A463M , T1-25; or a 55-percent aluminum-zinc coating.
Provide metal support systems containing a minimum of 20 percent recycled content. Provide data identifying percentage of recycled content for metal support systems.
2.1.1 Materials for Attachment of Gypsum Wallboard
2.1.1.1 Suspended and Furred Ceiling Systems
ASTM C645.
2.1.1.2 Non-load Bearing Wall Framing and Furring
ASTM C645, but not thinner than 0.0179 inch thickness, with 0.0329 inch minimum thickness supporting wall hung items such as cabinetwork, equipment and fixtures.
2.1.1.3 Furring Structural Steel Columns
ASTM C645. Steel (furring) clips and support angles listed in UL Fire Resistance may be provided in lieu of steel studs for erection of gypsum wallboard around structural steel columns.
2.1.1.4 Z-Furring Channels with Wall Insulation
Not lighter than 26 gauge galvanized steel, Z-shaped, with 1-1/4 inch and 3/4 inch flanges and depth as required by the insulation thickness provided.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Systems for Attachment of Lath
3.1.1.1 Suspended and Furred Ceiling Systems and Wall Furring
ASTM C841, except as indicated otherwise.
3.1.1.2 Non-load Bearing Wall Framing
NAAMM EMLA 920, except provide framing members 16 inches o.c. unless indicated otherwise.
SECTION 09 22 00 Page 2
3.1.2 Systems for Attachment of Gypsum Wallboard
3.1.2.1 Suspended and Furred Ceiling Systems
ASTM C754, except provide framing members 16 inches o.c. unless indicated otherwise.
3.1.2.2 Non-load Bearing Wall Framing and Furring
ASTM C754, except as indicated otherwise.
3.1.2.3 Furring Structural Steel Columns
Install studs or galvanized steel clips and support angles for erection of gypsum wallboard around structural steel columns in accordance with the UL Fire Resistance , design number(s) of the fire resistance rating indicated.
3.2 ERECTION TOLERANCES
Provide framing members which will be covered by finish materials such as wallboard, plaster, or ceramic tile set in a mortar setting bed, within the following limits:
a. Layout of walls and partitions: 1/4 inch from intended position;
b. Plates and runners: 1/4 inch in 8 feet from a straight line;
c. Studs: 1/4 inch in 8 feet out of plumb, not cumulative; and
d. Face of framing members: 1/4 inch in 8 feet from a true plane.
Provide framing members which will be covered by ceramic tile set in dry-set mortar, latex-portland cement mortar, or organic adhesive within the following limits:
a. Layout of walls and partitions: 1/4 inch from intended position;
b. Plates and runners: 1/8 inch in 8 feet from a straight line;
c. Studs: 1/8 inch in 8 feet out of plumb, not cumulative; and
d. Face of framing members: 1/8 inch in 8 feet from a true plane.
SECTION 09 22 00 Page 3
SECTION 09 22 00 Page 4
SECTION 09 29 00
GYPSUM BOARD
08/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A108.11 (1992; Reaffirmed 2005) Specifications for Interior Installation of Cementitious Backer Units
ASTM INTERNATIONAL (ASTM)
ASTM C475/C475M (2017) Standard Specification for Joint Compound and Joint Tape for Finishing Gypsum Board
ASTM C514 (2004; R 2014) Standard Specification for Nails for the Application of Gypsum Board
ASTM C840 (2018b) Standard Specification for Application and Finishing of Gypsum Board
ASTM C954 (2018) Standard Specification for Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Steel Studs from 0.033 in. (0.84 mm) to
0.112 in. (2.84 mm) in Thickness
ASTM C1002 (2018) Standard Specification for Steel Self-Piercing Tapping Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel Studs
ASTM C1047 (2014a) Standard Specification for Accessories for Gypsum Wallboard and Gypsum Veneer Base
ASTM C1178/C1178M (2013) Standard Specification for Glass Mat Water-Resistant Gypsum Backing Panel
ASTM C1396/C1396M (2017) Standard Specification for Gypsum Board
ASTM C1629/C1629M (2018a) Standard Classification for Abuse-Resistant Nondecorated Interior Gypsum Panel Products and Fiber-Reinforced Cement Panels
SECTION 09 29 00 Page 1
ASTM D1037 (2012) Evaluating Properties of Wood-Base Fiber and Particle Panel Materials
ASTM D2394 (2017) Standard Test Methods for Simulated Service Testing of Wood and Wood-Base Finish Flooring
ASTM D3273 (2016) Standard Test Method for Resistance to Growth of Mold on the Surface of Interior Coatings in an Environmental Chamber
ASTM D5420 (2016) Standard Test Method for Impact Resistance of Flat, Rigid Plastic Specimen by Means of a Strike Impacted by a Falling Weight (Gardner Impact)
ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E695 (2003; R 2015; E 2015) Measuring Relative Resistance of Wall, Floor, and Roof Construction to Impact Loading
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
GYPSUM ASSOCIATION (GA)
GA 214 (2010) Recommended Levels of Gypsum Board Finish
GA 216 (2010) Application and Finishing of Gypsum Panel Products
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
SECTION 09 29 00 Page 2
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
UL Fire Resistance (2014) Fire Resistance Directory
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Cementitious Backer Units
Glass Mat Water-Resistant Gypsum Tile Backing Board
Water-Resistant Gypsum Backing Board
Glass Mat Covered or Reinforced Gypsum Sheathing
Glass Mat Covered or Reinforced Gypsum Sheathing Sealant
Abuse Resistant Gypsum Board
Accessories
Submit for each type of gypsum board and for cementitious backer units.
Gypsum Board
Recycled Content for Gypsum Board; S
Recycled Content for Paper Facing and Gypsum Cores; S
VOC Content of Joint Compound; S
SD-07 Certificates
Asbestos Free Materials; G, RO
Certify that gypsum board types, gypsum backing board types, cementitious backer units, and joint treating materials do not contain asbestos.
Indoor Air Quality for Gypsum Board; S
Indoor Air Quality for Non-aerosol Adhesives; S
Indoor Air Quality for Aerosol Adhesives; S
SD-08 Manufacturer's Instructions
SECTION 09 29 00 Page 3
Safety Data Sheets
SD-10 Operation and Maintenance Data
Manufacturer Maintenance Instructions
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
Submit required indoor air quality certifications in one submittal package.
1.3.1.1 Ceiling and Wall Systems
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party program that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
1.3.1.2 Adhesives and Sealants
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party program that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
Deliver materials in the original packages, containers, or bundles with each bearing the brand name, applicable standard designation, and name of manufacturer, or supplier.
1.4.2 Storage
Keep materials dry by storing inside a sheltered building. Where necessary to store gypsum board and cementitious backer units outside, store off the ground, properly supported on a level platform, and protected from direct exposure to rain, snow, sunlight, and other extreme weather conditions. Provide adequate ventilation to prevent condensation. Store per manufacturer's recommendations for allowable temperature and humidity range. Do not store gypsum wallboard with materials which have high emissions of volatile organic compounds (VOCs) or other contaminants. Do not store panels near materials that may offgas or emit harmful fumes, such as kerosene heaters, fresh paint, or adhesives. Do not use materials that have visible moisture or biological growth.
1.4.3 Handling
Neatly stack gypsum board and cementitious backer units flat to prevent
SECTION 09 29 00 Page 4 sagging or damage to the edges, ends, and surfaces.
1.5 QUALIFICATIONS
Furnish type of gypsum board work specialized by the installer with a minimum of 3 years of documented successful experience.
1.6 SCHEDULING
Commence application only after the area scheduled for gypsum board work is completely weathertight. The heating, ventilating, and air-conditioning systems must be complete and in operation prior to application of the gypsum board. If the mechanical system cannot be activated before gypsum board is begun, the gypsum board work may proceed in accordance with an approved plan to maintain the environmental conditions specified below. Apply gypsum board prior to the installation of finish flooring and acoustic ceiling.
1.7 ENVIRONMENTAL REQUIREMENTS
Do not expose the gypsum board to excessive sunlight prior to gypsum board application. Maintain a continuous uniform temperature of not less than 50 degrees F and not more than 80 degrees F for at least one week prior to the application of gypsum board work, while the gypsum board application is being done, and for at least one week after the gypsum board is set.
Shield air supply and distribution devices to prevent any uneven flow of air across the plastered surfaces. Provide ventilation to exhaust moist air to the outside during gypsum board application, set, and until gypsum board jointing is dry. In glazed areas, keep windows open top and bottom or side to side 3 to 4 inches. Reduce openings in cold weather to prevent freezing of joint compound when applied. For enclosed areas lacking natural ventilation, provide temporary mechanical means for ventilation.
In unglazed areas subjected to hot, dry winds or temperature differentials from day to night of 20 degrees F or more, screen openings with cheesecloth or similar materials. Avoid rapid drying. During periods of low indoor humidity, provide minimum air circulation following gypsum boarding and until gypsum board jointing complete and is dry.
1.8 FIRE RESISTIVE CONSTRUCTION
Comply with specified fire-rated assemblies for design numbers indicated per UL Fire Resistance or FM APP GUIDE.
PART 2 PRODUCTS
2.1 MATERIALS
Conform to specifications, standards and requirements specified. Provide gypsum board types, gypsum backing board types, cementitious backing units, and joint treating materials manufactured from asbestos free materials only. Submit Safety Data Sheets and manufacturer maintenance instructions for gypsum materials including adhesives.
2.1.1 Gypsum Board
ASTM C1396/C1396M . Provide gypsum wall board and panels meeting the emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type). Provide certification or validation of indoor air quality for gypsum board.
SECTION 09 29 00 Page 5
2.1.1.1 Regular
48 inch wide, 5/8 inch thick, tapered edges.
2.1.1.2 Type X (Special Fire-Resistant)
48 inch wide, 5/8 inch thick, tapered edges.
2.1.1.3 Mold Resistant / Anti-Microbial Gypsum
ASTM D3273. 48 inch wide, 5/8 inch thick, tapered edges.
2.1.2 Regular Water-Resistant Gypsum Backing Board
ASTM C1396/C1396M
2.1.2.1 Regular
48 inch wide, 5/8 inch thick, tapered edges.
2.1.2.2 Type X (Special Fire-Resistant)
48 inch wide, 5/8 inch thick, tapered edges.
2.1.3 Glass Mat Water-Resistant Gypsum Tile Backing Board
ASTM C1178/C1178M
2.1.3.1 Regular
48 inch wide, 5/8 inch thick, square edges.
2.1.3.2 Type X (Special Fire-Resistant)
48 inch wide, 5/8 inch thick, square edges.
2.1.4 Abuse Resistant Gypsum Board
48 inch wide, 5/8 inch thick, tapered edges.
Reinforced gypsum panel with imbedded fiber mesh or lexan backing tested in accordance with the following tests. Hard body impact test must attain a Level 2 performance in accordance with ASTM C1629/C1629M . Provide fasteners that meet manufacturer requirements and specifications stated within this section. Abuse resistant gypsum board, when tested in accordance with ASTM E84, have a flame spread rating of 25 or less and a smoke developed rating of 50 or less for all locations.
2.1.4.1 Soft Body Impact Test
ASTM E695 or ASTM D2394 for impact penetration and deformation. ASTM E695 using a 60 lb leather bag filled with steel pellets, resisting no less than 300 ft. lb. cumulative impact energy before failure or ASTM D2394 using
5.5 inch hemispherical projectile resisting no less than 264 ft. lb.
before failure. Provide test specimen stud spacing a minimum 16 inch on center.
SECTION 09 29 00 Page 6
2.1.4.2 Hard Body Impact Test
Comply with hard body impact test in accordance with ASTM C1629/C1629M Classification Level 2.
2.1.4.3 Surface Abrasion Test
Comply with test surface abrasion test in accordance with ASTM C1629/C1629M .
2.1.4.4 Indentation Test
ASTM D5420 or ASTM D1037 for indentation resistance. ASTM D5420 using a 32 oz weight with a 5/8 inch hemispherical impacting head dropped once 3 feet creating not more than 0.137 inch indentation or ASTM D1037 using no less than 470 lb weight applied to the 0.438 inch diameter ball to create not more than a 0.0197 inch indentation depth.
2.1.5 Cementitious Backer Units
In accordance with the Tile Council of America (TCA) Handbook.
2.1.6 Joint Treatment Materials
ASTM C475/C475M. Product must be low emitting VOC types with VOC limits not exceeding 50 g/L. Provide data identifying VOC content of joint compound. Use all purpose joint and texturing compound containing inert fillers and natural binders, including lime compound. Pre-mixed compounds must be free of antifreeze, vinyl adhesives, preservatives, biocides and other slow releasing compounds.
2.1.6.1 Embedding Compound
Specifically formulated and manufactured for use in embedding tape at gypsum board joints and compatible with tape, substrate and fasteners.
2.1.6.2 Finishing or Topping Compound
Specifically formulated and manufactured for use as a finishing compound.
2.1.6.3 All-Purpose Compound
Specifically formulated and manufactured to serve as both a taping and a finishing compound and compatible with tape, substrate and fasteners.
2.1.6.4 Setting or Hardening Type Compound
Specifically formulated and manufactured for use with fiber glass mesh tape.
2.1.6.5 Joint Tape
Use cross-laminated, tapered edge, reinforced paper, or fiber glass mesh tape recommended by the manufacturer.
2.1.7 Fasteners
2.1.7.1 Nails
ASTM C514. For predecorated gypsum board provide special nails with
SECTION 09 29 00 Page 7 factory coated heads of color to match wall covering materials as recommended by the predecorated gypsum board manufacturer.
2.1.7.2 Screws
ASTM C1002, Type "G", Type "S" or Type "W" steel drill screws for fastening gypsum board to gypsum board, wood framing members and steel framing members less than 0.033 inch thick. ASTM C954 steel drill screws for fastening gypsum board to steel framing members 0.033 to 0.112 inch thick. Provide cementitious backer unit screws with a polymer coating.
2.1.7.3 Staples
No. 16 USS gauge flattened galvanized wire staples with 7/16 inch wide crown outside measurement and divergent point for base ply of two-ply gypsum board application. Use as follows:
Length of Legs Thickness of Gypsum Board
1-1/8 inches 1/2 inch
1-1/4 inches 5/8 inch
2.1.8 Adhesives
Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of GS-36. Provide certification or validation of indoor air quality for non-aerosol adhesives applied on the interior of the building (inside of the weatherproofing system). Provide certification or validation of indoor air quality for aerosol adhesives used on the interior of the building (inside of the weatherproofing system).
2.1.8.1 Adhesive for Fastening Gypsum Board to Metal Framing
Not permitted.
2.1.8.2 Adhesive for Fastening Gypsum Board to Wood Framing
Not permitted.
2.1.8.3 Adhesive for Laminating
Not permitted.
2.1.9 Gypsum Studs
Provide one inch minimum thickness and 6 inch minimum width. Studs may be of one inch thick gypsum board or multilayers fastened to required thickness. Conform to ASTM C1396/C1396M for material and GA 216 for installation.
SECTION 09 29 00 Page 8
2.1.10 Shaftwall Liner Panel
ASTM C1396/C1396M . Conform to the UL Fire Resistance for the Design Numbers(s) indicated for shaftwall liner panels. Manufacture liner panel for cavity shaftwall system, with water-resistant paper faces, bevel edges, single lengths to fit required conditions, 1 inch thick, by 24 inch wide.
2.1.11 Accessories
ASTM C1047. Fabricate from plastic designed for intended use.
Accessories manufactured with paper flanges are not acceptable. Flanges must be free of dirt, grease, and other materials that may adversely affect bond of joint treatment. Provide prefinished or job decorated materials.
2.1.12 Water
Provide clean, fresh, and potable water.
PART 3 EXECUTION
3.1 EXAMINATION
3.1.1 Framing and Furring
Verify that framing and furring are securely attached and of sizes and spacing to provide a suitable substrate to receive gypsum board and cementitious backer units. Verify that all blocking, headers and supports are in place to support plumbing fixtures and to receive soap dishes, grab bars, towel racks, and similar items. Do not proceed with work until framing and furring are acceptable for application of gypsum board and cementitious backer units.
3.1.2 Building Construction Materials
Do not install building construction materials that show visual evidence of biological growth.
3.2 APPLICATION OF GYPSUM BOARD
Apply gypsum board to framing and furring members in accordance with ASTM C840 or GA 216 and the requirements specified. Apply gypsum board with separate panels in moderate contact; do not force in place. Stagger end joints of adjoining panels. Neatly fit abutting end and edge joints.
Use gypsum board of maximum practical length; select panel sizes to minimize waste. Cut out gypsum board to make neat, close, and tight joints around openings. In vertical application of gypsum board, provide panels in lengths required to reach full height of vertical surfaces in one continuous piece. Lay out panels to minimize waste; reuse cutoffs whenever feasible. Surfaces of gypsum board and substrate members may not be bonded together with an adhesive. Treat edges of cutouts for plumbing pipes, screwheads, and joints with water-resistant compound as recommended by the gypsum board manufacturer. Minimize framing by floating corners with single studs and drywall clips. Provide type of gypsum board for use in each system specified herein as indicated.
SECTION 09 29 00 Page 9
3.2.1 Application of Single-Ply Gypsum Board to Wood Framing
Apply in accordance with ASTM C840, System I or GA 216 .
3.2.2 Application of Two-Ply Gypsum Board to Wood Framing
Apply in accordance with ASTM C840, System II or GA 216 .
3.2.3 Adhesive Nail-On Application to Wood Framing
Apply in accordance with ASTM C840, System III or GA 216 . This method may be used in lieu of ASTM C840, System I at the option of the Contractor.
3.2.4 Application of Gypsum Board to Steel Framing and Furring
Apply in accordance with ASTM C840, System VIII or GA 216 .
3.2.5 Arches and Bending Radii
Apply gypsum board in accordance with ASTM C840, System IX or GA 216 .
3.2.6 Gypsum Board for Wall Tile or Tile Base Applied with Adhesive
In dry areas (areas other than tubs, shower enclosures, saunas, steam rooms, gang shower rooms), apply water-resistant gypsum backing board in accordance with ASTM C840, System X or GA 216 .
3.2.7 Exterior Application
Apply exterior gypsum board (such as at soffits) in accordance with ASTM C840, System XI or GA 216 .
3.2.8 Floating Interior Angles
Minimize framing by floating corners with single studs and drywall clips. Locate the attachment fasteners adjacent to ceiling and wall intersections in accordance with ASTM C840, System XII or GA 216 , for single-ply applications of gypsum board to wood framing.
3.2.9 Control Joints
Install expansion and contraction joints in ceilings and walls in accordance with ASTM C840, System XIII or GA 216 . Fill control joints between studs in fire-rated construction with firesafing insulation to match the fire-rating of construction.
3.2.10 Application of Foil-Backed Gypsum Board
Apply foil-backed gypsum board in accordance with ASTM C840, System XIV or
GA 216 .
3.2.11 Application of Abuse Resistant Gypsum Board
Apply in accordance with applicable system of ASTM C840 as specified or GA 216 . Follow manufacturers written instructions on how to cut, drill and attach board.
SECTION 09 29 00 Page 10
3.3 APPLICATION OF CEMENTITIOUS BACKER UNITS
3.3.1 Application
In wet areas (tubs, shower enclosures, saunas, steam rooms, gang shower rooms), apply cementitious backer units in accordance with ANSI A108.11 .
Place a 15 lb asphalt impregnated, continuous felt paper membrane behind cementitious backer units, between backer units and studs or base layer of gypsum board. Place membrane with a minimum 6 inch overlap of sheets laid shingle style.
3.3.2 Joint Treatment
ANSI A108.11 .
3.4 FINISHING OF GYPSUM BOARD
Tape and finish gypsum board in accordance with ASTM C840, GA 214 and GA 216 . Finish plenum areas above ceilings to Level 1 in accordance with GA 214 . Finish water resistant gypsum backing board, ASTM C1396/C1396M , to receive ceramic tile to Level 2 in accordance with GA 214 . Finish walls and ceilings to receive a heavy-grade wall covering or heave textured finish before painting to Level 3 in accordance with GA 214 .
Finish walls and ceilings without critical lighting to receive flat paints, light textures, or wall coverings to Level 4 in accordance with GA 214 . Unless otherwise specified, finish all gypsum board walls, partitions and ceilings to Level 5 in accordance with GA 214 . Provide joint, fastener depression, and corner treatment. Tool joints as smoothly as possible to minimize sanding and dust. Do not use self-adhering fiber glass mesh tape with conventional drying type joint compounds; use setting or hardening type compounds only. Provide treatment for water-resistant gypsum board as recommended by the gypsum board manufacturer. Protect workers, building occupants, and HVAC systems from gypsum dust.
3.4.1 Uniform Surface
Wherever gypsum board is to receive eggshell, semigloss or gloss paint finish, or where severe, up or down lighting conditions occur, finish gypsum wall surface in accordance to GA 214 Level 5. In accordance with GA 214 Level 5, apply a thin skim coat of joint compound to the entire gypsum board surface, after the two-coat joint and fastener treatment is complete and dry.
3.5 SEALING
Seal openings around pipes, fixtures, and other items projecting through gypsum board and cementitious backer units as specified in Section 07 92 00 JOINT SEALANTS. Apply material with exposed surface flush with gypsum board or cementitious backer units.
3.6 FIRE-RESISTANT ASSEMBLIES
Wherever fire-rated construction is indicated, provide materials and application methods, including types and spacing of fasteners, wall in accordance with the specifications contained in UL Fire Resistance for the Design Number(s) indicated. Joints of fire-rated gypsum board enclosures must be closed and sealed in accordance with UL test requirements or GA requirements. Seal penetrations through rated partitions and ceilings tight in accordance with tested systems.
SECTION 09 29 00 Page 11
3.7 PATCHING
Patch surface defects in gypsum board to a smooth, uniform appearance, ready to receive finishes.
3.8 SHAFTWALL FRAMING
Install the shaftwall system in accordance with the system manufacturer's published instructions. Coordinate bucks, anchors, blocking and other items placed in or behind shaftwall framing with electrical and mechanical work. Patch or replace fireproofing materials which are damaged or removed during shaftwall construction.
SECTION 09 29 00 Page 12
SECTION 09 30 10
CERAMIC, QUARRY, AND GLASS TILING
08/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A137.1 (2012) American National Standards Specifications for Ceramic Tile
ASTM INTERNATIONAL (ASTM)
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C150/C150M (2018) Standard Specification for Portland Cement
ASTM C373 (2018)Standard Test Methods for Determination of Water Absorption and Associated Properties by Vacuum Method for Pressed Ceramic Tiles and Glass Tiles and Boil Method for Extruded Ceramic Tiles and Non-tile Fired Ceramic Whiteware Products
ASTM C648 (2004; R 2009) Breaking Strength of Ceramic Tile
ASTM D226/D226M (2017) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
ASTM D2103 (2015) Standard Specification for Polyethylene Film and Sheeting
ASTM D4068 (2017) Standard Specification for Chlorinated Polyethylene (CPE) Sheeting for Concealed Water-Containment Membrane
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
SECTION 09 30 10 Page 1
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
TILE COUNCIL OF NORTH AMERICA (TCNA)
TCNA Hdbk (2017) Handbook for Ceramic, Glass, and Stone Tile Installation
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Detail Drawings; G, RO
SD-03 Product Data
Porcelain Tile; G, RO
Recycled Content for Porcelain Tile; S
Setting-Bed; G, RO
Mortar, Grout, and Adhesive; G, RO
SD-04 Samples
Tile; G, RO
Accessories; G, RO
Transition Strips; G, RO
SECTION 09 30 10 Page 2
Grout; G, RO
SD-07 Certificates
Indoor Air Quality for Adhesives; S
SD-08 Manufacturer's Instructions
Maintenance Instructions
SD-10 Operation and Maintenance Data
Installation; G, RO
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
1.3.1.1 Adhesives and Sealants
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited in this Section.
1.4 QUALITY ASSURANCE
Provide installers having a minimum of two years experience with a company specializing in performing the type of work described. Each type and color of tile to be provided from a single source. Each type and color of mortar, adhesive, and grout to be provided from the same source.
1.5 DELIVERY, STORAGE, AND HANDLING
Ship tiles in sealed packages and clearly marked with the grade, type of tile, producer identification, and country of origin. Deliver materials to the project site in manufacturer's original unopened containers with seals unbroken and labels and hallmarks intact. Protect materials from weather, and store them under cover in accordance with manufacturer's printed instructions.
1.6 ENVIRONMENTAL REQUIREMENTS
Do not perform ceramic tile work unless the substrate and ambient temperature is at least 50 degrees F and rising. Maintain temperature above 50 degrees F while the work is being performed and for at least 7 days after completion of the work. When temporary heaters are used, ventilate the area to the outside to avoid carbon dioxide damage to new tilework.
1.7 WARRANTY
Provide manufacturer's standard performance guarantees or warranties that extend beyond a 1-year period.
SECTION 09 30 10 Page 3
1.8 EXTRA MATERIALS
Supply an extra 2 percent of each type tile used in clean and marked cartons.
PART 2 PRODUCTS
2.1 TILE
Provide tiles that comply with ANSI A137.1 and are standard grade tiles.
Provide a minimum breaking strength of 125 lbs. for wall tile and 250 lbs.
for floor tile in accordance with ASTM C648. Provide floor tiles with a wet dynamic coefficient of friction (DCOF) value of 0.42 or greater when tested in accordance with ANSI A137.1 requirements. For materials like tile, accessories, and transition strips submit samples of sufficient size to show color range, pattern, type and joints. Submit manufacturer's catalog data.
2.1.1 Porcelain Tile
Provide unglazed, porcelain tile with color extending uniformly through the body of the tile. Provide tile with a V2 aesthetic classification.
Blend tiles in factory and in a packages to have same color range and continuous blend for installation. Provide nominal tile size(s) of 12 by 24 inch and 3/8 inch thick. Provide a 0.50 percent maximum water absorption in accordance with ASTM C373.
Provide Porcelain Tiling Materials that contain a minimum of 10 percent recycled content. Provide data identifying percentage of recycled content for porcelain tile.
2.2 SETTING-BED
Submit manufacturer's catalog data. Compose the setting-bed of the following materials:
2.2.1 Aggregate for Concrete Fill
Conform to ASTM C33/C33M for aggregate fill. Do not exceed one-half the thickness of concrete fill for maximum size of coarse aggregate.
2.2.2 Portland Cement
Conform to ASTM C150/C150M for cement, Type I, white for wall mortar and gray for other uses.
2.3 WATER
Provide potable water.
2.4 MORTAR, GROUT, AND ADHESIVE
Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide aerosol adhesives used on the interior of the building meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of
SECTION 09 30 10 Page 4 space type) or VOC content requirements of GS-36. Provide certification or validation of indoor air quality for adhesives.
2.4.1 Latex-Portland Cement Mortar
TCNA Hdbk.
2.4.2 Tile Grout
Epoxy grout, stain-free and color uniformity. Maximum VOC content of 65 grams/liter. Provide grout joints per manufacturer's recommendation.
2.5 SUBSTRATES
2.5.1 Cementitious Backer Board
Provide cementitious backer units, for use as tile substrate, in accordance with TCNA Hdbk.
2.6 TRANSITION STRIPS
Provide anodized aluminum transitions between tile and resilient flooring. Provide types as recommended by flooring manufacturer for both edges and transitions of flooring materials specified. Provide transition strips that comply with 36 CFR 1191 requirements.
2.7 MEMBRANE MATERIALS
Conform to ASTM D226/D226M, Type 1 for 15 pound waterproofing membrane, asphalt-saturated building felt. Conform to ASTM D2103 ASTM D4068 4 mil for polyethylene film.
2.8 COLOR, TEXTURE, AND PATTERN
Provide color, pattern and texture in accordance with as indicated on the drawings. Color listed is not intended to limit the selection of equal colors from other manufacturers. Provide floor patterns as specified on the drawings.
PART 3 EXECUTION
3.1 PREPARATORY WORK AND WORKMANSHIP
Inspect surface to receive tile in conformance to the requirements of TCNA Hdbk for surface conditions for the type setting bed specified and for workmanship. Provide variations of tiled surfaces that fall within maximum values shown below:
TYPE WALLS FLOORS
Latex Portland Cement Mortar 1/8 inch in 8 ft. 1/8 inch in 10 ft.
Epoxy 1/8 inch in 8 ft. 1/8 inch in 10 ft.
3.2 GENERAL INSTALLATION REQUIREMENTS
Do not start tile work until roughing in for mechanical and electrical work has been completed and tested, and built-in items requiring membrane
SECTION 09 30 10 Page 5 waterproofing have been installed and tested. Close space, in which tile is being set, to traffic and other work. Keep closed until tile is firmly set. Do not start floor tile installation in spaces requiring wall tile until after wall tile has been installed. Apply tile in colors and patterns indicated in the area shown on the drawings. Install tile with the respective surfaces in true even planes to the elevations and grades shown. Provide special shapes as required for sills, jambs, recesses, offsets, external corners, and other conditions to provide a complete and neatly finished installation. Solidly back tile bases and coves with mortar. Do not walk or work on newly tiled floors without using kneeling boards or equivalent protection of the tiled surface. Keep traffic off horizontal portland cement mortar installations for at least 72 hours.
Keep all traffic off epoxy installed floors for at least 40 hours after grouting, and heavy traffic off for at least 7 days, unless otherwise specifically authorized by manufacturer. Dimension and draw detail drawings at a minimum scale of 1/4 inch = 1 foot. Include drawings of pattern at inside corners, outside corners, termination points and location of all equipment items such as thermostats, switch plates, mirrors and toilet accessories mounted on surface. Submit drawings showing tile pattern elevations.