West Point Bldg. 620 Repair RTA Attach A Submittal Register.pdf
PDF 2 MB Posted
- Attached to
- Building 620 Whole Building Repair Project, United States Military Academy, West Point, NY
- Solicitation number
- W912DS20B0013
About this file
This solicitation is for a firm fixed-price construction contract to renovate Building 620 at the United States Military Academy in West Point, New York. Work includes interior and exterior repairs, replacement of major building systems and components, hazardous material abatement, and upgrades to MEP systems. The period of performance is approximately 610 calendar days. The estimated value is between $25-100 million. The Corps of Engineers, New York District will award through full and open competition. Interested parties can access the solicitation on beta.SAM.gov. The project specification files and drawings are in PDF format. Past performance evaluations will be conducted using CPARS. The point of contact is Monica Chahary.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 93 PAGES
West Point Building 620 Repair
01 11 00 SD-01 Preconstruction Submittals
1.9 G ROSalvage Plan
1.8.1 G RODig Safe Permit
01 14 00 SD-01 Preconstruction Submittals
1.3.2.1 G ROList of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals
1.3 G ROView Location Map
1.4 G ROProgress and Completion
Pictures
SD-07 Certificates
1.14 G ROEng Form 93
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
3.5.2 G RONarrative Report
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 G ROPreliminary High Performance
and Sustainable Building Checklist
1.4.1 G ROSustainability Action Plan
1.5.3.1 G ROPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 93 PAGES
01 33 29 1.5.3.1 G ROFinal High Performance and
Sustainable Building Checklist
1.5.3.1 G ROFinal Sustainability eNotebook
1.5.3.1Amended Final Sustainability eNotebook
1.5.3.1 G ROAmended Final High
Performance and Sustainable
Building Checklist
3.2 G ROThird Party Certification
Certificate, Assessment, or
Validation
01 35 26 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.5Crane Operators/Riggers
1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G ROCritical Lift Plan
G ROArchitecture Analysis
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
G RO S
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 93 PAGES
01 35 26 1.12.4Certificate of Compliance
License Certificates
G ROPortable Gauge Operations
Planning Worksheet
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
SD-07 Certificates
3.10 G ROQcr Report
01 45 35 SD-01 Preconstruction Submittals
GProject Manual
3.1.2Written Practices
3.1.2NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
AC472 Accreditation
2.1Certificate of Compliance
1.5 GSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 93 PAGES
01 45 35 3.1.2Interim Final Report
3.1.2Comprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.4 G ROConstruction Site Plan
3.5.1 G ROTraffic Control Plan
2.2.1 G ROHaul Road Plan
SD-07 Certificates
Backflow Tester
1.5Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.10 G ROSolid Waste Management Permit
1.5.2 G RORegulatory Notifications
1.6 G ROEnvironmental Protection Plan
3.2.1.1 G ROStormwater Pollution Prevention
Plan
3.2.1.2 G ROStormwater Notice of Intent
1.6.9.1 G RODirt and Dust Control Plan
1.5.5 G ROEmployee Training Records
1.5.4 G ROEnvironmental Manager
Qualifications
SD-06 Test Reports
3.2.1.3Inspection Reports
1.10.1 G ROMonthly Solid Waste Disposal
Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 93 PAGES
01 57 19 1.5.5 G ROEmployee Training Records
1.5.5.1Certificate of Competency
1.5.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.1.4 G ROStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 G ROStormwater Notice of Termination
3.7.1 G ROWaste Determination
Documentation
3.7.3.6 G RODisposal Documentation for
Hazardous and Regulated Waste
1.5.5 G ROAssembled Employee Training
Records
1.10 G ROSolid Waste Management Permit
3.7.2.1 G ROProject Solid Waste Disposal
Documentation Report
3.7.3.1 G ROHazardous Waste/Debris
Management
1.5.2 G RORegulatory Notifications
3.7.2.1 G ROSales Documentation
01 58 00 SD-02 Shop Drawings
1.4.1 G ROSign Legend Orders
01 74 19 SD-01 Preconstruction Submittals
1.6 G ROConstruction Waste Management
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 93 PAGES
01 74 19 SD-06 Test Reports
1.8.2Quarterly Reports
1.8.3Annual Report
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.8.1Warranty Management Plan
1.8.5Warranty Tags
1.6Spare Parts Data
SD-08 Manufacturer’s Instructions
1.8.1Instructions
SD-10 Operation and Maintenance
Data
3.8 G ROOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 G ROAs-Built Drawings
3.3 G RORecord Drawings
2.2 G RORecord Model
3.6 G ROConstruction Operations Building
Information Exchange (Cobie)
1.8.1As-Built Record of Equipment and Materials
3.7As-Built Record of Equipment and Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 93 PAGES
01 78 00 3.4 G ROFinal Approved Shop Drawings
3.5 G ROConstruction Contract
Specifications
2.3 G ROCertification of EPA Designated
Items
2.4 G ROCertification Of USDA Designated
Items
3.10.1 G ROInterim DD FORM 1354
3.10.2 G ROChecklist for DD FORM 1354
3.10.2 G ROHigh Performance And
Sustainable Building (HPSB)
Checklist
01 78 23 SD-10 Operation and Maintenance
Data
1.3 G ROO&M Database
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
01 78 24.00 10 SD-01 Preconstruction Submittals
1.4.1Facility Data Project Execution
Plan
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 93 PAGES
01 78 24.00 10 3.1 G ROFacility Data Workbook, Construction Progress
3.1 G ROFacility Document Set, Construction Progress
SD-11 Closeout Submittals
3.2 G ROFacility Data Workbook, Construction Final
1.4.3 G ROFacility Document Set, Construction Final
3.2 G ROFacility Document Set, Construction Final
01 91 00.15 10 SD-01 Preconstruction Submittals
1.1 G DOLead Commissioning Specialist
(Lead CxG)
3.2.6.6.1.1G DOTechnical Commissioning
Specialists (CxG)
G DOCommissioning Firm's Contract
SD-05 Design Data
3.1.2 G DODesign Phase Commissioning
Plan
SD-06 Test Reports
3.1.3 G DODesign Review Report via Dr.
Checks
3.2.3.1 G DOInterim Construction Phase
Commissioning Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 93 PAGES
01 91 00.15 10 3.2.3.2 G DOFinal Construction Phase
Commissioning Plan
3.2.3.1.2 G DOTemplate Building Envelope
Inspection Checklists
3.2.6.2 G DOBuilding Envelope Inspection
Checklists
3.2.6.3 G DOPre-Functional Checklists
1.10Issues Log
3.3 G DOCommissioning Report
3.4.1 G DOPost-Construction Trend Log
Report
SD-07 Certificates
1.11 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.2.7 G ROTraining Plan
3.2.7 G ROTraining Attendance Rosters
3.2.8 G DOSystems Manual
3.2.9 G DOMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.3 S DOFinal Commissioning Report
3.2.3.2 SFinal Construction Phase
Commissioning Plan
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 93 PAGES
02 41 00 1.9Existing Conditions
SD-07 Certificates
1.7 GNotification
SD-11 Closeout Submittals
3.3.4Receipts
02 81 00 SD-03 Product Data
2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
3.2 GOnsite Hazardous Waste
Management
3.3Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
3.10 GRecordkeeping
3.10 GException Report
3.11Spill Response
SD-07 Certificates
1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
1.4.3Certification
3.3.3 GShipping Documents and
Packagings Certification
3.3.4Security Plan
3.3.5Certificates of Disposal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 93 PAGES
02 81 00 3.9Waste Minimization
02 82 00 SD-03 Product Data
1.2.2 GAmended Water
1.3.9 GSafety Data Sheets (SDS) for All
Materials
3.1.2.1 GRespirators
3.1.7 GPressure Differential Automatic
Recording Instrument
SD-06 Test Reports
1.5.4 GAir Sampling Results
1.5.5 GPressure Differential Recordings
for Local Exhaust System
3.2 GClearance Sampling
3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
1.3.10 GAsbestos Hazard Abatement Plan
1.3.11 GTesting Laboratory
1.3.12 GLandfill Approval
1.3.12 GDelivery Tickets
1.3.12 GWaste Shipment Records
1.3.13 GTransporter Certification
1.3.14 GMedical Certification
1.5.1 GPrivate Qualified Person
Documentation
1.5.2 GWorker's License
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 93 PAGES
02 82 00 1.5.3 GContractor's License
3.1.8 GVacuums
SD-11 Closeout Submittals
1.3.5 GPermits and Licenses
1.3.5 GNotifications
1.3.7.1 GRespirator Program Records
1.6.1 GRental Equipment
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead, Cadmium, Chromium
Waste Management Plan
GLicenses, Permits and
Notifications
1.5.3 GOccupant Protection Plan
1.5.2.2 GLead, Cadmium, Chromium
Compliance Plan
3.4.1.1 GInitial Sample Results
3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1 GRespirators
1.6.4 GVacuum Filters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 93 PAGES
02 83 00 2.1 GMaterials and Equipment
1.2.17 GLocal Exhaust Equipment
SD-06 Test Reports
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3 GSampling Results
SD-07 Certificates
1.5.1.3 GTesting Laboratory
1.5.1.4 GThird Party Consultant
Qualifications
GOccupant Notification
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
GTurn-In Documents or Weight
Tickets
02 85 00 SD-01 Preconstruction Submittals
1.2.26 GVentilation System Mold
Remediator Qualifications
1.4.1.1 GPreliminary Visual Assessment
Report
1.4.1.2 GMicrobial Remediation Plan
1.4.1.3 GRespiratory Protection Program
1.4.1.4Worker Records
1.4.1.5 GCIH/Industrial Hygienist (IH)
Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 93 PAGES
02 85 00 1.4.1.6 GMicrobial Remediation Supervisor
Qualifications
SD-03 Product Data
1.2.11 GDisinfectants or Biocide
Sanitizing Solutions
1.2.14 GFungicidal Agents, (EPA)
1.2.21 GPersonal Protective Equipment
(PPE)
1.2.24Pressure Differential Measuring
Instrument
2.2 GSafety Data Sheets (SDS) for All
Materials
3.1.4Dehumidifiers
3.1.5Air Filtration Units
SD-06 Test Reports
1.4.3 GIH Daily Reports
SD-11 Closeout Submittals
1.4.4 GSubmittals at Completion of
Remediation Work
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Plan
1.6.7 GQuality Control Personnel
Certifications
1.6.7Quality Control Organizational
Chart
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 93 PAGES
03 30 00 1.6.9 GLaboratory Accreditation
3.3.8Maturity Method Data
SD-02 Shop Drawings
2.1Formwork
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.3.2Recycled Aggregate Materials
2.3.1Cementitious Materials
2.4.6Vapor Retarder
2.4.1Concrete Curing Materials
2.6Reinforcement
2.3.4Admixtures
3.3Waterstops
1.8.1Local/Regional Materials
2.2.2Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 93 PAGES
03 30 00 1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.14.2.3 GCompressive Strength Tests
3.14.2.4Air Content
3.14.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.6.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.4Safety Data Sheets
1.8.2Forest Stewardship Council
(FSC) Certification
1.6.7.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.5Joint Sealants
2.4.1Curing Compound
04 03 00 SD-01 Preconstruction Submittals
1.5.1 GQuality Control Plan
1.5.1 GProject Training Program
1.5.2 GQualifications
SD-02 Shop Drawings
1.5.5Photographic Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 93 PAGES
04 03 00 3.5.1 GStructural Upgrades
SD-03 Product Data
1.5.2Qualifications
1.5.6 GCleaning and Restoration
Methods
2.1 GCleaning Materials
2.1.4Biocides
2.2.2.2 GReplacement Mortar And Stucco
2.4 GMortar Mix
3.4.8.2 GWater Repellents Infiltration
3.4.8.3 GStone Consolidants
SD-04 Samples
1.5.7.1 GMock-ups
SD-05 Design Data
3.5.1 GStructural Upgrades
SD-06 Test Reports
2.2.2.1Testing and Matching
SD-07 Certificates
2.2Repair Materials
04 20 00 SD-02 Shop Drawings
3.3.3.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay or Shale Brick
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 93 PAGES
04 20 00 GGlazed Structural Clay Facing
Tile
1.4.1 GGlazed Brick
2.2.2.3 GSalvaged Brick
2.4.1.2 GCement
2.4.1.1 GCementitious Materials
GInsulation
SD-04 Samples
GMock-Up Panel
2.2.2 GClay or Shale Brick
GGlazed Structural Clay Facing
Tile
1.4.1 GGlazed Brick
2.2.3.2 GConcrete Masonry Units (CMU)
GConcrete Brick
GDimension Stone Units
2.4.1.3 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
2.6.5 GClay Masonry Expansion-Joint
Materials
GInsulation
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 93 PAGES
04 20 00 2.2.3.3Fire-Rated Concrete Masonry
Units
3.2.5 GBracing Calculations
SD-06 Test Reports
2.2.2.1.3Efflorescence Test
2.2.3.3Fire-Rated Concrete Masonry
Units
Field Testing of Mortar
3.6.1.1Field Testing of Grout
2.1.2Prism Test
Single-Wythe Masonry Wall
Water Penetration Test
SD-07 Certificates
1.3.1Special Masonry Inspector
Qualifications
2.2.2Clay or Shale Brick
2.2.3.2Concrete Masonry Units (CMU)
Precast Concrete Units
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 93 PAGES
04 20 00 2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
SClay Units
2.2.3.2.1 SRecycled Content
05 12 00 SD-01 Preconstruction Submittals
1.3.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.3.2 GFabrication Drawings
SD-03 Product Data
2.5.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3Tension Control Bolts
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
2.2.3 SRecycled Content for Steel Pipe
SD-05 Design Data
GDesign Calculations for Steel
Connections
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 93 PAGES
05 12 00 SD-06 Test Reports
2.5.2Class B Coating
2.3Bolts, Nuts, and Washers
3.6.1.2Weld Inspection Reports
3.6.2.1Direct Tension Indicator Washer
Inspection Reports
3.6.3.1Bolt Testing Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
1.3.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.6.1.1Certified Welding Inspector
3.6.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 93 PAGES
05 40 00 1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
05 50 13 SD-02 Shop Drawings
2.4 GFloor Gratings
2.5 GAngles and Plates
SD-03 Product Data
2.3 GCover Plates and Frames
2.4 GFloor Gratings
05 52 00 SD-02 Shop Drawings
GFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.2.1 GStructural-Steel Plates, Shapes, and Bars
2.2.2 GStructural-Steel Tubing
2.2.4 GCold-Finished Steel Bars
2.2.3 GHot-Rolled Carbon Steel Bars
2.2.5 GCold-Drawn Steel Tubing
3.2 GMasonry Anchorage Devices
2.1.1 GProtective Coating
2.2.8 GSteel Railings
3.2 GAnchorage and Fastening
Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 93 PAGES
05 52 00 SD-07 Certificates
1.3.1 GWelding Procedures
1.3.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-02 Shop Drawings
2.2.3 GStructural Glued Laminated
1.9.1 GFabricated Structural Members
1.9.2 GModifications of Structural
Members
2.2.2 GNailing Strips
SD-03 Product Data
2.1.2Salvaged Lumber
Recovered Lumber
2.4Underlayment
2.1.3Plastic Lumber
1.8Fire-retardant Treatment
1.4.4Structural-use and OSB Panels
2.3Oriented Strand Board
2.5.4Adhesives
SD-05 Design Data
1.9.2 GModifications of Structural
Members
SD-06 Test Reports
1.4.5Preservative-treated
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 93 PAGES
06 10 00 1.11.1Certificates of Grade
SCertified Sustainably Harvested
Virgin Lumber
SCertified Sustainably Harvested
Natural-decay and Insect-resistant
Wood
SCertified Sustainably Harvested
Framing Lumber
SCertified Sustainably Harvested
Structural Glued Laminated Timber
SCertified Sustainably Harvested
Plywood Subflooring
SCertified Sustainably Harvested
Structural-use and OSB Panel
Subfloor Sheathing
SCertified Sustainably Harvested
Plywood Combination Subfloor
Underlayment
SCertified Sustainably Harvested
Plywood Wall Sheathing
SCertified Sustainably Harvested
Plywood Roof Sheathing
SCertified Sustainably Harvested
Plywood Diaphragm
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 93 PAGES
06 10 00 SCertified Sustainably Harvested
Structural-use and OSB Panel
Shear Wall
SCertified Sustainably Harvested
Plywood for Other Uses
SCertified Sustainably Harvested
Structural-use and OSB Panels for
Other Uses
SCertified Sustainably Harvested
Plywood Underlayment
1.7Preservative Treatment
SIndoor Air Quality for
Particleboard Underlayment
SIndoor Air Quality for Fiberboard
Underlayment
SIndoor Air Quality for Strawboard
Panels
SIndoor Air Quality for Fiberboard
Wall Sheathing
2.5.4 SIndoor Air Quality for Aerosol
Adhesives
2.5.4 SIndoor Air Quality for Non-aerosol
Adhesives
SD-10 Operation and Maintenance
Data
1.4.8Plastic
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 93 PAGES
06 10 00 3.5Take-back Program
06 20 00 SD-02 Shop Drawings
1.3 GDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1 GWood Products
2.5 GHardware and Accessories
SD-04 Samples
1.5 GSamples
SD-07 Certificates
1.7.1.1 GCertificates of Grade
2.1.4 SIndoor Air Quality for Hardwood
Plywood
2.6.1.2 SIndoor Air Quality for Non-aerosol
Adhesives
2.6.1.2 SIndoor Air Quality for Aerosol
Adhesives
06 41 16.00 10 SD-02 Shop Drawings
1.5.2Shop Drawings
2.9Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
Wood Finishes
2.9.7.3Finish Schedule
1.5.3Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 93 PAGES
06 41 16.00 10 SD-04 Samples
2.3Plastic Laminates
2.6Cabinet Hardware
SD-07 Certificates
1.5Quality Assurance
3.1Laminate Clad Casework
SD-11 Closeout Submittals
1.3LEED Documentation
06 61 16 SD-02 Shop Drawings
2.1 GDetail Drawings
3.1 GInstallation
SD-03 Product Data
2.1Solid Polymer Material
1.5.1Qualifications
2.3Fabrications
2.2.4 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.5 GCounter and Vanity Tops
SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.5.1Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 93 PAGES
06 61 16 2.1 SIndoor Air Quality for solid surface fabrication products
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.1 GBlock or Board Insulation
2.3 GAccessories
2.1.4 SRecycled Content for Block or
Board Insulation
SD-07 Certificates
2.1 GBlock or Board Insulation
2.1.5 SIndoor Air Quality For Block Or
Board Insulation
SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.3.1Adhesive
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.1.1 SRecycled Content for Insulation
Materials
Pressure Sensitive Tape
2.3Accessories
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 93 PAGES
07 21 16 2.1.3 SIndoor Air Quality for Insulation
Materials
2.3.1 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2.1Insulation
07 27 10.00 10 SD-02 Shop Drawings
2.1 GAir Barrier System Shop
Drawings
SD-03 Product Data
2.1Air Barrier System Product Data
SD-04 Samples
3.1.2Mock-Up
2.1Material Samples For Air Barrier
System
SD-05 Design Data
1.8 GDesign Data And Calculations
For The Air Barrier System
SD-06 Test Reports
1.8 GDesign Review Report
3.1.3 GTesting and Inspection
SD-07 Certificates
1.7 G ROAir Barrier Inspector
07 27 19.01 SD-02 Shop Drawings
1.4 GSelf-adhering Air Barrier
SD-03 Product Data
1.4 GSelf-adhering Air Barrier
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO AE
G RO AE
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 93 PAGES
07 27 19.01 2.2 GPrimers, Adhesives, and Mastics
1.4.1 GSafety Data Sheets
SD-06 Test Reports
1.4.3 GFlame Propagation of Wall
Assemblies
1.4.3 GFlame Spread and Smoke
Developed Index Ratings
SD-07 Certificates
1.4 GSelf-adhering Air Barrier
SD-08 Manufacturer’s Instructions
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
07 27 36 SD-01 Preconstruction Submittals
1.10.1 GQualification of Manufacturer
1.10.2 GQualification of Installer
1.11 GQuality Control Plan
1.11 GSafety Plan
1.9.1 GFire Prevention Plan
1.9.2 GRespirator Plan
SD-02 Shop Drawings
1.5Spray Foam Air Barrier
1.11 GFoam Air Barrier System
1.5.1 GFire-Rated Assemblies
SD-03 Product Data
2.1.2 GClosed Cell
2.2 GTransition Membrane
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 93 PAGES
07 27 36 2.3 GPrimers, Adhesives, and Mastics
2.5 GSealants
1.5.2 GSafety Data Sheets
1.5.3 GAccessories
2.1.2 SRecycled Content for Closed Cell
Spray Foam Air Barrier
SD-04 Samples
1.5 GSpray Foam Air Barrier
SD-06 Test Reports
1.5.4 GField Peel Adhesion Test
3.4.5.1 GThermographic Test
1.8 GAir Barrier Test
1.5.3 GPrimers
1.5.4 GFire-Ratings of Thermal Barrier
Materials
1.5.4 GFlame Spread And Smoke
Developed Index Ratings Of SPF
Products
1.5.4 GFlame Propagation Of Wall
Assemblies
3.4.1 GSite Inspections
SD-07 Certificates
2.1.2 GClosed cell
1.10.1 GQualification of Manufacturer
1.10.2 GQualification of Installer
2.2 GTransition Membrane
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 93 PAGES
07 27 36 2.1.5 SIndoor Air Quality for Spray Foam
Air Barrier
SD-08 Manufacturer’s Instructions
1.6.1 GSPF Handling, Storage, and
Spray Procedures
3.2.1 GSubstrate Preparation
1.11 GThermal Barrier
2.2 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
SD-09 Manufacturer’s Field
Reports
1.11 GCore Samples
3.3.3 GDaily Work Record
3.4.5 GVisual Inspection and Thermal
Scanning
07 31 26 SD-02 Shop Drawings
1.4 GDrawings
SD-03 Product Data
1.4Qualifications
SD-04 Samples
2.1.1Slate
2.2Accessories for Slate Roofs
2.1.7Sealants
2.1.2Underlayment Membrane
3.2Fasteners
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 93 PAGES
07 31 26 2.1Materials
07 52 00 SD-02 Shop Drawings
1.4.6 GRoof Plan
1.4.6Field Inspection and Existing
Conditions Report
SD-03 Product Data
2.2 GModified Bitumen Sheets
1.5.1Asphalt
2.4 GCold-Applied Membrane
Adhesive
2.6 GPrimer
2.7 GModified Bitumen Roof Cement
2.10Pre-Manufactured Accessories
2.9 GFasteners And Plates
1.8 GWarranty
SD-05 Design Data
1.4.5 GWind Uplift Calculations
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.4.3Qualification of Engineer of
Record
1.4.5 GWind Uplift Resistance
1.4.4 GFire Resistance
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 93 PAGES
07 52 00 3.3.5 GModified Bitumen Membrane
Application
3.3.6 GFlashing
3.3.3.1 GCold Adhesive Applied Modified
Bitumen Membrane
2.6Primer
2.9.1Fasteners
GCoating Application
1.6 GCold Weather Installation
SD-11 Closeout Submittals
1.8Warranty
3.8Information Card
3.7Instructions To Government
Personnel
07 62 13 SD-02 Shop Drawings
2.1.6Sheet Metal
3.10Gutters
1.4Ridge Cap
3.6.5.1Open Valley Flashing
SD-03 Product Data
3.12Contractor Quality Control
SD-04 Samples
2.1Materials
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 93 PAGES
07 84 00 2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.1 SRecycled Content for Steel Door
Product
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 93 PAGES
08 11 13 2.6 GFrames
2.6 GFrames
2.6 SRecycled Content for Steel Frame
Product
2.4Accessories
2.8Weatherstripping
SD-03 Product Data
2.1 GDoors
2.6 GFrames
2.4Accessories
2.8Weatherstripping
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
SRecycled Content for Door Cores
2.2Accessories
2.3.7Water-resistant Sealer
1.5Warranty
2.1.3 GSound Transmission Class
Rating
2.1.4 GFire Resistance Rating
SD-04 Samples
2.3.6.3 GDoor Finish Colors
SD-06 Test Reports
2.4Cycle-Slam
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 93 PAGES
08 14 00 2.4Hinge Loading Resistance
SD-07 Certificates
1.3.1Certificates of Grade
2.1.1 SCertified Sustainably Harvested
Stile and Rail Wood Doors
2.1.2 SCertified Sustainably Harvested
Flush Wood Doors
2.1.2.1 SIndoor Air Quality for
Particleboard and Agrifiber Door
Cores
SD-11 Closeout Submittals
1.5Warranty
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.7Fabrication Drawings
SD-03 Product Data
2.1 GWindows
2.2.7.1 GHardware
2.2.2 GFasteners
1.8 GWindow Performance
2.4 GThermal-Barrier Windows
2.5 GMullions
2.2.9 GScreens
2.1.5 GWeatherstripping
2.2.7 GAccessories
2.2.3Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 93 PAGES
08 51 13 1.8.4 GThermal Performance
SEnergy Star Label For Residential
Aluminum Window Products
SD-04 Samples
1.3.3.1Finish Sample
1.3.3.2Window Sample
1.3.3.3 GMock-Up
SD-05 Design Data
GDesign Analysis
SD-06 Test Reports
2.1Minimum Condensation
Resistance Factor
GStandard Airblast Test
SD-07 Certificates
Engineer's Qualifications
SD-10 Operation and Maintenance
Data
2.1 GWindows
1.5Plastic Identification
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.7 GKeying System
SD-03 Product Data
2.3 GHardware Items
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G RO
G RO
G RO
G RO
G RO
G RO
G RO
G RO
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 93 PAGES
08 71 00 SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
2.2Insulating Glass
1.3Glazing Accessories
2.3.1.1Sealants
2.3.2Joint Backer
SD-04 Samples
2.2Insulating Glass
SD-07 Certificates
2.2Insulating Glass
SD-08 Manufacturer’s Instructions
2.3Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
08 91 00 SD-02 Shop Drawings
1.4Wall louvers
1.5Wall louvers
SD-03 Product Data
2.2Metal Wall Louvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 93 PAGES
08 91 00 SD-04 Samples
1.4 GWall louvers
1.5 GWall louvers
09 22 00 SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.5Cementitious Backer Units
2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.2Water-Resistant Gypsum Backing
Board
Glass Mat Covered or Reinforced
Gypsum Sheathing
Glass Mat Covered or Reinforced
Gypsum Sheathing Sealant
2.1.4Abuse Resistant Gypsum Board
2.1.11Accessories
2.1.1Gypsum Board
SRecycled Content for Gypsum
Board
SRecycled Content for Paper
Facing and Gypsum Cores
2.1.6 SVOC Content of Joint Compound
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 93 PAGES
09 29 00 2.1 GAsbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board
2.1.8…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .