WB_Potable_Water_System_Upgrade_-_Scope_of_Work.docx
DOCX document 17 KB Posted
- Solicitation number
- 107594
- Issued by
- Prince George's County, Maryland
About this file
This is a Scope of Work document for the Washington Suburban Sanitary Commission (WSSC) in Maryland regarding the Western Branch Water Resource Recovery Facility Potable Water System Upgrade project. The project involves construction of a new well house, water line, and connections to treatment plant buildings; installation of a new electrical duct bank connecting to an existing manhole; and all associated sitework including erosion and sediment controls, site grading, and pavement restoration. The facility, located at 6600 Crain Highway, Upper Marlboro, Maryland, currently relies on a 1966-era well approximately 341 feet deep that is located within a floodplain and exhibits corrosion issues, with recent water quality testing detecting total coliforms. Construction is estimated to take two years, with work occurring during normal business hours from 7:00 am to 4:00 pm. Sealed responses must be submitted via WSSC's eProcurement Portal prior to 2:00 pm on Monday, July 27, 2026. The base contract term is two years.
The project operates as a Requirements Contract, meaning WSSC has no obligation to purchase any materials and the stated quantities serve only as estimates based on previous usage and projected needs rather than guaranteed amounts. Key deliverables include daily reports, compaction and erosion control system testing reports, and as-built documentation. The Contractor Project Manager will oversee construction, design management, coordination, scheduling, quality control, and safety compliance, while the WSSC Project Manager will serve as the agency representative overseeing the project from concept to completion, managing budgeting, scheduling, quality control, and stakeholder coordination. No pricing terms, set-asides, funding amounts, or incumbent information are specified in the Scope of Work document.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTERN BRANCH WRRF
POTABLE WATER SYSTEM UPGRADES
SCOPE OF WORK
1. BACKGROUND/PURPOSE
The background/purpose shall provide the Bidder’s with a general history of the requested need.
Western Branch Water Resource Recovery Facility uses groundwater as its source of potable water. An on-site water well, pumps and pipeline distribute water to the different buildings within the facility. For process related water needs, there is an independent system that uses plant effluent as its source.
The well was drilled in 1966 when the original 5 MGD plant was constructed. At that time, the well provided both potable water and process water for the small plant. The well is approximately 341 feet deep. When the plant was expanded to 30 MGD in the mid-1970s, the potable water pipeline system was dedicated to only supply potable water to the plant including fire hydrants on the east side.
The existing potable water well lies within the flood plain. The piping and components within the below ground well vault are corroded. Water quality from the potable water system is also of concern as recent sampling results tested positive for total coliforms.
2. SCOPE OF WORK/SPECIFICATIONS
The Vendor shall provide the following:
Construction of a new well house, water line and connections to the treatment plant buildings. Installation of new electrical duct bank connecting to an existing manhole. In addition, must perform all sitework including establishment of erosion and sediment controls, site grading, and pavement restoration.
3. ROLES AND RESPONSIBLITIES (IF APPLICABLE)
Identify the roles and responsibilities of key personnel for both the Contractor and WSSC.
a. Contractor Project Manager - shall be is responsible for overseeing construction projects submittals review, some design management, manage the coordination between contractors and clients, ensuring that all parties work together efficiently, plan meetings and documentation. Other roles include scheduling, quality control, as well as compliance with safety regulations, risk management, addressing any issues or delays that arise, support negotiations between client and contractor, ensure effective communication throughout the project. Strong leadership, problem-solving, and organizational skills are essential.
b. WSSC Project Manager – will serve as a representative of WSSC. The Project Manager will oversee design and construction of the projects from concept to completion, ensuring that creative visions align with business goals, a team of designers, architects, or other specialists, while coordinating with designers and contractors to clarify requirements and feedback. Other roles include budgeting, scheduling, and quality control, ensuring projects stay on track and meet deadlines. In addition, the Project Manager will solve problems that arise during the project lifecycle, act as a liaison between designer/contractor and technical teams and ensure the final design/construction meets project requirements.
4. DELIVERABLES (IF APPLICABLE)
Submittals Daily reports, Compaction and ECS testing reports As-builts
5. MILESTONES (IF APPLICABLE)
It is estimated that the construction will take 2 years.
6. DELIVERY/SERVICE LOCATION (IF APPLICABLE)
6600 Crain Highway, Upper Marlboro, MD 20772-4136.
7. DELIVERY PERIOD
During normal construction hours 7am -4pm
8. TASK ORDER PROCEDURE/WORK ORDER/RELEASE PROCESS (IF APPLICABLE)
N/A
9. MAINTENANCE/SUPPORT SERVICES (IF APPLICABLE)
N/A
10. CONTRACT TERM
The base term of the Contract shall be for a period of two years..
11. REQUIREMENTS CONTRACT (IF APPLICABLE)
Bidders acknowledge that the Contract that will be entered into because of this Solicitation will be a Requirements Contract. The Commission will have no obligation to the Contractor if no material is required. The Contractor understands and agrees that the Commission is under no obligation to the Contractor to buy any amount because of issuing this Contract. The quantities stated herein are given are as a general guide for bidding and are not guaranteed amounts, but do represent the best estimate of the Commission, based on previous usage and projected needs.