Wayfinding Signage

13 MB Posted

Attached to
Digital Signage and Wayfinding Projects
Solicitation number
RFP2023-004
Issued by
Douglas County, Georgia

About this file

Summary

This is a Request for Proposal (RFP) issued by the City of Douglasville, Georgia, for comprehensive signage and wayfinding services. The project involves demolition of existing sign infrastructure and fabrication and installation of proposed signage at seven Douglasville locations: Hospital Drive at Campbellton Street Intersection (Freedom Island), Public Safety Complex, Douglasville Conference Center, Hunter Memorial Park, Cedar Mountain Road Maintenance Facility, Jessie Davis Park, and kiosks for the Douglasville Downtown Amphitheater/Greenspace. Services include site review and verification, structural engineering coordination, artwork preparation, comprehensive submittals including shop drawings and material samples, fabrication of aluminum cabinets, channel letters, stone and brick veneers, digital screens, installation via core drill footings with engineer-stamped designs, permitting, electrical hookup, and a five-year warranty covering materials and workmanship. A mandatory pre-proposal conference was scheduled for May 11, 2023, at 1:00 PM. The proposal deadline was June 6, 2023, at 2:00 PM, with interviews tentatively scheduled for June 12, 2023, and City Council approval recommendation for June 15, 2023. The contractor must also provide maintenance services for a minimum 12-month period following installation.

Proposers must submit a lump-sum bid including all labor, materials, bonds, and applicable permits and taxes. A bid bond of 5 percent of the bid amount is required, with performance and payment bonds each equal to 100 percent of the contract sum required from the successful proposer. General Liability Insurance with limits of not less than $1 million per occurrence and $2 million aggregate, plus a general liability umbrella policy with $10 million aggregate, is mandatory. The evaluation criteria include staffing (15 points), experience/performance (25 points), approach (10 points), and fee proposal (50 points). Proposers must have at least five years of business operation and demonstrate experience with projects over $70,000 completed in the last two years. The signage fabricator must perform 75 percent of primary fabrication in-house, including metal fabrication, welding, and general assembly. All submittals must be made electronically in PDF format via BidNet, and all bonds and insurance policies must be issued by surety companies with an A.M. Best rating of A (Excellent) or better and licensed in Georgia.

Text of this file

REQUEST FOR PROPOSAL

FOR

City of Douglasville – Signage + Wayfinding Phase 2

Secondary Gateway, City Parks, and City Facilities

ISSUE DATE: May 1, 2023

DUE DATE: June 6, 2023

RFP 2023-004

I. GENERAL PROJECT INFORMATION AND BACKGROUND: The City of Douglasville (the ‘’City’’ or

“Owner”) is seeking Proposals from qualified vendors to demolish existing signs infrastructures, and furnish and install proposed signage for the following Douglasville locations: Hospital Drive at Campbellton Street Intersection (Freedom Island), Public Safety

Complex, Douglasville Conference Center, Hunter Memorial Park, Cedar Mountain Road

Maintenance Facility, and Jessie Davis Park, and kiosks for the Douglasville Downtown

Amphitheater/Greenspace. The City has hired Sky Design (the “City’s Representative”) as the

Owner’s representative to facilitate the signage installation.

II. SCOPE OF SERVICES: The project includes but is not limited to the following:

A. Review

1. Verify all site conditions with regard to the fabrication and installation before manufacture of signage. Any conditions that would impede the proper and timely completion of the work should be presented to the City’s Representative.

2. Confirm each sign location with the City’s Representative and locate via stake and flag for verification.

3. Fabricator shall notify the Owner’s representative of any discrepancies in the design documents or graphics schedule as well as discrepancies in field dimensions or field conditions (drainage pipes, etc.) that would require changes in sign construction details. All discrepancies should be brought to the attention of the City’s representative prior to production.

4. Address any conflicting conditions with signage that are not coordinated prior to the manufacturing of the scope of work, in the punch list phase.

B. Engineering

1. Coordinate with a structural engineer to verify footings for the proposed signage. A Professional Engineer’s stamp and signature is to be obtained when necessary to comply with permits and/or codes.

2. Ensure that signage is designed to withstand wind pressure loading to meet or exceed all current code requirements for the State of Georgia and the City of Douglasville. In addition to the signage internal framework providing maximum capacity to avoid any surface oil canning, curvature, or deviations.

3. Design, fabricate, and install component parts to provide for expansion and contraction over a temperature range for the material of 150 degrees Fahrenheit (83.3 degrees Celsius), without buckling, oil canning, sealant joint failure, glass breakage, undue stress on members or anchors, and other detrimental effects.

C. Artwork

1. Enlarge and reduce supplied artwork images, where necessary. Any discrepancies after enlarging or reducing vs. original artwork are to be addressed with the City’s Representative prior to reproduction. Refer to the design documents for reference as to what artwork will be provided. Electronic artwork for contractors used in shop drawings would not be submitted, except for custom created logos, icons, typography, etc. Artwork for general fabrication items will not be submitted so please account for this in your time frames and general costs.

D. Submittals

1. Provide color samples, material samples, submittals, copy layouts, and working drawings for approval by the City’s Representative and City prior to manufacturing. Full size copy layouts will also be required as needed.

a. Responsible for providing shop drawings for each of the disciplines contained within and are to include all necessary dimensions drawn to scale, details, internal mechanicals, joint connections, hidden connections, anchorage to footings, section views as needed, etc. These must be submitted as one comprehensive package to be reviewed and approved prior to beginning any construction. Scans or copies of the enclosed design documents with contractor title block will not be accepted for approval as working drawings.

b. Responsible for all aspects of fabrication including engineering, installation techniques and performance, as well as coordination with site contractors and related trades.

c. Provide three samples of each color to be submitted to the City’s Representative and City on minimum 4’’x4’’ plate. One will be returned; the others will be retained for file references. All paints used must retain a minimum 5−year warranty for interior and exterior signage. This includes no cracking, flaking, or fading. Exterior paints should be 2−part catalyst hardened urethane, base coat, topcoat, satin finish unless otherwise specified.

d. Provide mock−ups. Samples required for review and approval and approval will be listed on Bid Summary Form.

e. Provide three vinyl samples of each color to be submitted to the City’s Representative as a minimum 4’’x4’’ submittal. All vinyl is to be 3M Scotchcal graphic vinyl, or Gerber equivalent. First surface application unless otherwise specified on drawings.

f. Provide one proof of each inkjet graphic to be submi�ed at full−size.

For large format graphics, a minimum 12” x 12”, full size portion should be submi�ed, along with a smaller−scaled full layout of each design/image. Proofs are to be of equal or greater reproduction quality than the original artwork provided. All inkjet graphics are to be printed on 3M material or equivalent using pigment−based ink to prevent fading and discoloration. If necessary, laminates on printed vinyl are to be 3M material or equivalent. All inkjet graphics to be matte laminated, unless otherwise specified. Warranty information for all inkjet applications to be provided at no less than five years. If a matte laminate is specified for use over printed wallcovering, then a liquid laminate must be used. All submittals must be provided on the material specified, along with the laminate (if specified), for approval.

E. Materials

1. Ensure all wood, stone, brick, or brick veneer components are sealed to protect against decay, mildew, and discoloration.

2. Confirm all aluminum components and panels have a minimum wall thickness of

.125’’ or greater.

3. The interior of all illuminated cabinets is to be painted bright white.

F. Construction Phase

1. Demolition of existing sign to install ne signage infrastructure, if applicable.

2. Install Post and Panels in concrete or pavement via core drill footing and backfill where required.

3. Coordinate all breakaway details with the City’s Representative to conform to the

Georgia Department of Transportation standard requirements.

4. Set pin mounted letters in Hilti epoxy or equivalent to deter theft and vandalism.

Establish and maintain coordinating procedures. Also, set exterior pin mounted letters shall be sealed with silicone or equivalent waterproofing sealer.

5. Confirm that signage design and installation conform to all federal, state, and city regulations and ordinances.

6. Responsible for submitting drawings to the proper agencies for review and approval prior to construction and to obtain the necessary permits and approvals prior to construction.

7. Footings to be Georgia stamped engineered footings with backfill to bring grade level to the sign base.

8. Include and perform all priming work as needed for wall covering/graphics unless specifically stated as an exclusion in the vendor bid.

9. Complete the final electrical hook−up.

10. Include painted aluminum trimcap for all lit channel letters.

G. Signage Protection

1. Coordinate protection of all signs until punch list is completed.

2. Responsible for all equipment used to install signage, including but not limited to lifts, swing stages, equipment vehicles, and temporary attachments.

3. Ensure that all penetrations into all concrete, pavers, precast columns, beams, or building facades do not affect the structural integrity of the reinforcement within, and/or associated underlayment. Should any damage occur to signage and/or structures, structural components as a result of the signage installation process, it is your continued responsibility to manage the resolution process with all necessary parties until an agreed−upon solution is reached and damage is repaired at no cost to the city.

4. Waterproofing measures would need to be coordinated with the City’s Representative and installed for the proposed signage.

H. Warranty Phase

1. Coordinate and monitor the resolu�on of remaining “punch−list” items.

2. Warrant work against failure due to faulty materials, workmanship, and design for a period of five years from date of substantial completion.

3. Fading, cracking, oil canning, peeling, delaminating, rusting, corroding, and structural failure, including distortion, will be construed to mean failure due to faulty materials and/or workmanship.

4. All products, materials, adhesive, paints, etc. shall be covered by the standard manufacturer warranty. Failures during the respective warranty periods shall be repaired or replaced to the satisfaction of the City. All product warranties shall be managed and coordinated by the Contractor.

All Local, County, State, and Federal codes and regulations must be followed.

Once a contract is executed between the City of Douglasville and the successful Proposer, the successful Proposer will be required to deliver the services required by this RFP by the members of the proposed project team. The City of Douglasville must first approve any change in, or substitution of, project team members, including any consultant or, sub-contractor, in writing.

I. Maintenance

1. Contractor will provide maintenance services needed for signs installed to include all components of the sign (cleaning, material, LED lighting, digital screens, and paint where applicable) for a period of minimum 12 months.

J. Proprietary Information

Sky Design (the City’s Representative) shall have the right to include a credit line on completed designs or any visual representation of drawings, models, sketches, photographs, etc. created by Sky Design in the development of this signage program. The credit shall be included in any publication of the designs by the City or by others.

Downtown Amphitheater/Greenspace Kiosk Installation:

A. Specifications

1. Three double sided outdoor weather pedestal kiosk display stands with monitor mounts

2. Three 24/7 exterior brightness rated commercial outdoor grade displays

3. Three RS232/Ethernet converters for display control

4. Kiosks will be rated 55-inch HD Display

5. Power cords and LAN cables for kiosk equipment (including Owner furnished wireless router if needed)

6. HDMI Port combatable with Navori stick

7. Kiosks are to be interactive and provide audio

8. Kiosks are to be provided an overhang to give shade for 24-hour usage

Sources included

9. Signage Player content- four content windows used for messages and advertising

Streaming feed from the house AV matrix router

10. CATV from a common Owner Furnished turner to all signage displays

III. PROCUREMENT PROCESS AND INFORMATION

A. Request for Proposal Documents

All RFP documents are available in electronic format at the City of Douglasville website.

B. Availability of Request for Proposal

The RFP is open to all qualified candidates and is available free of charge.

C. Request for Information

All requests for information and clarifications regarding this project shall be submitted on

BidNet (www.bidnetdirect.com) no later than May 18, 2023 at 4:00PM. Questions and answers will be issued in the form of an addendum to all interested and will be available submitted on BidNet (www.bidnetdirect.com). It is the proposer’s responsibility to check the website for any addenda issued for this RFP.

http://www.bidnetdirect.com/ http://www.bidnetdirect.com/

D. Pre-proposal Meeting, Site Visit and Existing Documents Review

A MANDATORY pre-proposal Conference will be held May 11, 2023, at 1:00 PM, at 6700 Church Street, Douglasville, GA 30134. All firms intending to respond to this Request for Proposal must attend. Late attendees will not be admitted

E. Communication

From the issue date of this (RFP) solicitation until a successful proposer is selected and announced, proposers are forbidden to communicate about this solicitation or this Project for any reason with any members of the City of Douglasville administration and government, except for submission of ques�ons as instructed in the RFP, or during the pre− proposal conference (if applicable), or as provided by any existing work agreement(s). For violation of this provision, the Owner reserves the right to reject the proposal of the offending proposer. If additional assistance is needed, please contact Alyssa Gordon –

Senior Accounting Specialist at gordona@douglasvillega.gov.

F. RFP Timeline

RFP ESTIMATED TIMELINE

Owner issues public advertisement of RFP May 1, 2023

Pre−proposal mee�ng with site visit following May 11, 2023, 1:00 PM

Deadline for written questions/requests for clarification May 18, 2023, at 4:00PM

Publish responses to questions May 29, 2023

Deadline for submission of Proposals June 6, 2023, 2:00 PM

Interviews by Selection Committee (If Required) June 12, 2023

Selection recommendation to City Council for approval

June 15, 2023 (Tentative)

G. Submittal Date and Information

All bids must be submitted electronically in PDF format via BidNet: (www.bidnetdirect.com), no later than June 6, 2023, at 2:00 PM. Electronic submittals must include a reference to

RFP2023-004 Signage and Wayfinding Phase 2. Any Bid received after that time will not be considered for award.

1. It is the sole responsibility of the Proposer to assure delivery by the specified deadlines to the correct location; the City cannot accept responsibility for incorrect or late deliveries, regardless of reason.

2. A list of firms submitting responsive Proposals will be available on City of

Douglasville RFP/RFQ website after stated deadline.

mailto:gordona@douglasvillega.gov

3. Every proposal shall include price for all labor and materials, including the cost of payment bond and performance bond, as well as unclassified site work. Proposals shall be accompanied by a bid bond in an amount of 5% of the bid. A performance bond and a payment bond, each in the amount of 100% of the contract sum and for the term of the contract, will be required from the successful proposer. Proposals may not be withdrawn for a period of 60 days after the due date for receipt of proposals.

4. All proposals must be accompanied by a Certificate of Insurance to include General

Liability Insurance with limits of no less than $1 million per occurrence and $2 million aggregate, and a general liability umbrella policy with a limit of no less than $10 million aggregate; Worker’s Compensation coverage as provided by Georgia law;

Temporary Facilities and Equipment, and Builder’s Risk Insurance. All bonds and insurance policies shall be written by surety companies with an overall A.M. Best rating of A− (Excellent) or better, and which is listed in the U.S. Treasury Circular 570, and also which are licensed to do business in the State of Georgia. Said policies shall provide for jurisdiction and venue in Douglas County, Georgia, for resolution of any disputes.

5. Proposals may be withdrawn by written or email request, provided such withdrawals are received prior to the time and date of the bid closing. Prior to Notice to Proceed.

Contractor shall present a Liability Insurance Certificate naming the City of

Douglasville as an Additional Insured. Contractor shall be responsible for all injuries or damages of any kind resulting from work to persons or property.

6. All expenses for preparing and submitting responses are the sole cost of the party submitting the response. The City is not obligated to any party to reimburse such expenses. All submittals upon receipt become the property of the City. Labeling information provided in submittals “proprietary” or “confidential” or any other designation of restricted use will not protect the information from public view.

Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until final award.

The City of Douglasville reserves the right to waive any and all technicalities, formalities, or irregularities in bids. The City may reject the Bid of any vendor that has previously failed to perform properly or complete on time contracts of a similar nature with the

City of Douglasville, or if the proposer has within the last 5 years:

a. Failed to complete on time a similar contract due to delays caused by the proposer or non−conforming work performed by the proposer; or

b. Incurred criminal sanctions against company or any current proposer officer; or

c. Had its bonding company pay a claim against proposer’s payment or performance bond, due to proposer’s failure to perform.

H. Proposal Response Information

Provide the following Qualifications Information:

1. Proposer’s Information

a. Firm name, address, and telephone number

b. Primary local contact person(s) and telephone number(s)

c. Total number of firm's local full−�me employees

d. Year firm established

e. Firm’s billings for the last three fiscal years

f. Firm's billing for the current fiscal year

g. Listing and description of all current litigation involving the firm

h. Listing and description of all litigation history for the local firm since and including 2018

i. Copy of the most recent completed years audited financial Statements

(Income Statement and Balance Sheet) for the firm

j. Letter of commitment from Surety or sureties regarding bonding capacity and availability

k. If the proposer is an entity, Articles of Organization (for LLC or LP) or Articles of Incorporation (for Corporations), PLUS proof of current annual registration, from the Georgia Secretary of State.

Page 10 of

2. Experience:

a. Over five years of business operation is required.

b. Provide a list of projects over $70,000 completed in the last 2 years. Include with list: size, cost, total fee, time to complete, description, images and cost of contractor change orders.

c. Provide examples of your experience as a prime contractor in handling custom signage installation projects similar to this project (OR other public and private projects that indicate similar experience). For each of these projects:

1) Provide photographs.

2) Provide an owner reference familiar with your performance on the project. It is the Proposer’s responsibility to ensure that the listed contact and phone number are current.

3) Provide at least 3 client references and contact information.

4) List the individual who served as the Project Executive/Director, Project Manager, Superintendent, and Cost Estimator. Please note whether this individual is still employed with your firm.

d. At a minimum, the signage fabricator must be able to provide the following in−house services:

1) Pre−Construc�on: Engineering, CAD Services, Contract Documents, Cost Analysis.

2) Construc�on: 75% of all primary fabrica�on is to occur in−house including all metal fabrication, routing, forming, welding, and all general assembly. Only secondary graphic functions such as silk− screening, etching, casting, laser cutting of raw goods, etc. may take place out of house.

3) Implementation: Construction Management, Project Coordination, Assembly, and Installation.

e. At a minimum, the fabricator must meet the following fabrication and/or warranty criteria:

1) Pin mounted letters should be set in Hilti epoxy or equivalent to deter theft and vandalism and sealed with silicone or equivalent waterproofing sealer.

2) Fabrication and installation must conform to all federal, state, and city regulations and ordinances. It is the responsibility of the fabricator to submit drawings to the proper agencies for the review and approval prior to construction. It is also the responsibility of the fabricator to obtain the necessary permits and approvals prior to construction.

3) Fabricator to coordinate protection of all signs until punch list is completed by the City.

4) Fabricator warrants work against failure due to faulty materials, workmanship, and design for a period of five years from date of substantial completion. Fading, cracking, oil canning, peeling, delaminating, rusting, corroding, and structural failure, including distortion, will be construed to mean failure due to faulty materials and workmanship.

5) All products, materials, adhesive, paints, etc. shall be covered by standard manufacturer warranty. Failures during the warranty period shall be repaired or replaced to the satisfaction of the City.

3. Statement of Firm's capability to absorb additional workload, availability of personnel, and commitment to provide services on a timely basis.

4. Staffing Management

1. Provide a proposed Organizational Chart which identifies individual names and areas of responsibility.

2. Please designate the specific individuals to fill the following key roles on your team:

a) Project Executive

b) Project Manager

c) Superintendent

d) Cost Estimator

e) Other (please describe, if applicable.)

3. Please provide for each of the above personnel:

a) Current resumes listing relevant project experience.

b) Percent of time to be committed to this Project.

4. Please identify the individual who, from project start to finish, will be the leader of your construction team and the principal point of contact between your firm and the City and City’s

Representative and other consultants. This individual’s competence, leadership, and ability to achieve customer satisfaction will be heavily considered in the selection of the contractor.

F. Evaluation of proposals and presentation

The evaluation by the Selection Committee will be based on the Selection Criteria listed below.

The City will appoint a committee of key staff members (Selection Committee) to review each response to this RFP and provide a rank list of all the proposers.

1. Staffing − Evaluation of the list of personnel specifically assigned to the proposed project, including their qualifications, overall experience, and recent experience on projects of similar nature and complexity to the proposed project. Points: 15

2. Experience/Performance − Review of past performance on City of Douglasville projects or other projects of similar nature and complexity as the proposed project; evaluation of client references whether included in the proposal response or not; overall responsiveness to

Owner’s needs. Points: 25

3. Approach − Evaluation of the overall understanding of the scope of the proposed project;

completeness, adequacy, and responsiveness to the required information of the request for proposals. This should include a preliminary Project schedule by task and milestones that will be used to procure the Project. Provide in detail the services your firm will be providing.

Points: 10

4. Fee Proposal−

The selection committee members will each review the responses to the RFP’s and provide a score for each based on the selection criteria above. The selection committee will convene and summarize the points earned by each proposer, then establish a list of proposers found by the selection committee to have submitted proposals reasonably susceptible of being selected for award. As needed, the selection committee shall select proposers to be invited to provide a presentation of their proposal(s) to the selection committee. Points: 50

G. General Conditions

Upon submission of a bid, the bidder hereby certifies on behalf of his or her company or organization that:

1. This proposal is genuine and not made in the interest of, or on behalf of, an undisclosed person, firm, or corporation.

2. This proposal is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation.

3. The proposer has not directly or indirectly induced or solicited any other proposer to submit a false or sham bid.

4. The proposer has not solicited or induced any person, firm, or corporation to refrain from proposing.

5. The proposer has not sought by collusion to obtain for itself any advantages over any other bidder or over the City of Douglasville.

3. EXHIBITS

a) Exhibit “A” − Signs Location Analysis

b) Exhibit “B” − Signs Renderings and Drawings

c) Exhibit “C” − Fee Proposal

d) Exhibit ‘’D’’ − Bond Attachment

e) Exhibit “E” − Disclosure Statement

f) Exhibit “F” − Cer�fica�on Form

g) Exhibit “G” − Contractor’s Oath

h) Exhibit “H” − Contractors and Subcontractors affidavits of compliance with the

Georgia Security and Immigration Act

i) Exhibit ‘’I” − A�ach Corporate of Existence

EXHIBIT A: SIGNS LOCATION ANALYSIS

City of Douglasville - Digital Signage

Design Intent Documents

03.28.2023

Project #31554.01

Rev. #1

Project Address:

9000 Campbellton St

Douglasville, GA 30134

Drawing List Project Finishes Project Specifications Sign Location Plan - F.1 Sign Location Plan - F.2 Sign Location Plan - BB.1 Sign Location Plan - FF.1 Sign Location Plan - FF.2, FF.3 Sign Location Plan - GG.1 Sign Location Plan - GG.2 Building ID - Elevations Building ID - Details Building ID - Details Gateway ID Digital - Rendering Gateway ID Digital - Conceptual Model Gateway ID Digital - Elevations Gateway ID Digital - Details Gateway ID Digital - Sections Gateway ID Digital - Sections - BASE & BID ALTERNATE Conference Center Building ID - Rendering Conference Center Building ID - Elevations Conference Center Building ID - Details Conference Center Building ID - Sections Building ID - Elevations (Police Sign) Building ID - Details Building ID - Sections Building ID - Sections Park Building ID - Elevations Park Building ID - Details Park Building ID - Elevations Park Building ID - Sections Park Building ID - Sections

A B C 0.0 0.1 0.2 0.3 0.4 0.5 0.6 1.0 1.1 1.2 2.0 2.1 2.2 2.3 2.4 2.5 3.0 3.1 3.2 3.3 4.0 4.1 4.2 4.3 5.0 5.1 5.2 5.3 5.4

F F F

BB

BB

BB

BB

BB

BB

FF

FF

FF

FF

FF

FF

FF

FF

GG

GG

GG

GG

GG

City of Douglasville Digital Signage

31549.01

Drawing List

PAGE / SET SIGN TYPE DESCRIPTION

B

ID

D oc s

- R ev

.0 8.

B

ID

D oc s

- R ev

.2 8.

KEY SUBMITTAL DATE

NEW DRAWINGS

ISSUED WITH CHANGES

NO CHANGES

OMITTED

A

Drawing List

#0 12.05.2022 AG/CW/TC

#1 03.28.2023 AG/TC

H2 Flat Exterior Commercial Grade LED screen, full RGB with a resolution between 3.5MM - 5MM Vendor to recommend LED manufacturer and demo resolution/pixel pitch range with client to determine final resolution.

THOROCOAT PAINT TO RESEMBLE CONCRETE

Match Matthews Paint MP02650 Garbo Silver - Satin Finish P9

General Notes3

Project Typefaces2

Project Finishes1

TYPICAL NOTES

- REFER TO DRAWING NOTES FOR MATERIAL THICKNESS AND/OR DIAMETER

UNLESS SPECIFICALLY NOTED IN THE FINISH SCHEDULE.

- BID ALTERNATE PRICING SHOULD BE INCLUDED ON BID SUMMARY FORM

IN THE CORRESPONDING BID ALTERNATIVE COLUMN.

ASSEMBLY SPECIFICATIONS

- ALL HARDWARE TO BE SECURED WITH LOCTITE OR EQUIVALENT TO

DETER VANDALISM.

FABRICATION SPECIFICATIONS

- SEAMLESS CONSTRUCTION; ALL SEAMS/WELDS TO BE FILLED, GROUND,

SANDED, AND FINISHED SMOOTH.

- NO VISIBLE FASTENERS UNLESS THEY ARE SPECIFICALLY PART OF

DESIGN INTENT.

- NO ALTERNATES MAY BE INTRODUCED UNLESS CLEARLY OUTLINED BY

CONTRACTOR AND APPROVED BY OWNER AND DESIGNER.

- ALL CABINETS TO BE .125” ALUMINUM STOCK.

- ALL CHANNEL LETTERS TO BE MINIMUM .063” ALUMINUM STOCK RETURNS

AND .125” FRONT AND REAR FACES UNLESS OTHERWISE SPECIFIED.

- CAP ENDS OF ALL TUBING UNLESS OTHERWISE SPECIFIED.

GENERAL NOTES

- FIELD SURVEY IS REQUIRED PRIOR TO PRODUCING FINAL

SHOP DRAWINGS TO VERIFY ARCHITECTURAL INTEGRITY &

LAYOUT. ALL DRAWINGS IN THIS PACKAGE ARE FOR INTENT ONLY.

NO DIMENSIONS HAVE BEEN CONFIRMED. RESPONSIBILITY FOR ALL FIELD

VERIFICATION LIES WITH SIGN FABRICATOR.

- ALL INSTALLATION/MOUNTING TO COMPLY WITH LOCAL ORDINANCE/ADA.

Project Logos4

SIGNAGE PACKAGE NOTES AND FINISHES

TYPEFACE 1 - Avenir - Book

ABCDEFGHIJKLMNOPQRSTUVWXYZ

abcdefgh i j k lmnopqrs tuvwxyz 0123456789

TYPEFACE 2 - Avenir - Black

ABCDEFGHIJKLMNOPQRSTUVWXYZ

abcdefghi jk lmnopqrstuvwxyz 0123456789

MATERIAL SCHEDULE

LIGHTING SCHEDULE

PRINT COLOR SCHEDULE

M1 Aluminum

LED Linear Flood & Sign Light

DF9402-LED25

HARDWARE SCHEDULE

H2 Flat Digital Screen, Exterior Grade full RGB LED with a resolution range between 3.5MM - 5MM.

Vendor to recommend manufacturer.

M7 1/4” Thick Aluminum

M2 Acrylic

2” Stock Aluminum PostsM3

M4 Meridian Bricks - Authintic Brick Alamo

M5 Anatoliy Stone Southeastern Ledgestone - Antique

M6 Masonry Cap - Match Color to P9

VINYL SCHEDULE

V1 Digitally Printed Translucent Vinyl to Match Pantone 634 C

V2

PAINT SCHEDULE

P1 Matthew’s Paint MP05040 Blues News - Satin Finish

Matthew’s Paint MP07895 Meridian Blue - Satin Finish

Matthew’s Paint MP03170 Trefoil Yellow - Satin Finish

Matthew’s Paint MP00803 Mount of Olive - Satin FInish

Matthew’s Paint MP00811 Sulfurous Green - Satin Finish

Matthew’s Paint MP43251 Toque White - Satin Finish

Matthew’s Paint MP02650 Garbo Silver - Satin Finish

P2

P3

P4

P5

P6

P7

Matthew’s Paint MP31645 Designer White - Satin FinishP8

Matthew’s Paint MP10843 Chinese Red - Satin FinishP10

Matthew’s Paint MP07237 Jupiter Glow - Satin FinishP11

Matthew’s Paint MP00561 Lignite - LRV 10.8P12

Pantone Colors5

City of Douglasville Digital Signage

B

31549.01

Project Finishes

Pantone 632 C

Pantone 634 C

Pantone 7417 C

Pantone 574 C

Pantone 1235 C

Pantone 426 C

Pantone 5773 C

White LED Lighting Bitro OpticsPRO Plus OTSP-M3PL

Oracal 8800-010 - Translucent White

V3 Digitall Printed Reflective Vinyl Oralite 5650 - 070 Black

V4 Digitally Printed Reflective Vinyl to Match Pantone 634 C

V5 Oracal 5000 Reflective Vinyl 010 White

M8 Grout - SPEC TBD

City of Douglasville Digital Signage

C

31549.01

Project Specifications

Project Specifications

City of Douglasville - Digital SIgnage Project #31549.01

The following design documents are for the sole purpose of conveying design intent and are not intended for construction purposes. The fabricator may make recommendations and/or changes to the details as shown in the drawings with written approval of the Owner’s representative. The fabricator assumes all responsibility for signage integrity, engineering, field verification and measurements, etc. as part of the bid submittal process.

Sky Design and the Owner shall review all shop drawings for conformance with the design intent of these drawings only and will not be held responsible or liable for any results of construction from working drawings, materials selection, shop drawings, or any other agreements.

REVIEW

• Site: The fabricator is responsible for verifying all site conditions with regards to fabrication and installation before manufacture of signage. Any conditions that would impede the proper and timely completion of the work should be presented to the Owner’s representative in writing.

• Sign Location Plans: Locations shown on the Sign Location Plans are for general placement. The fabricator shall confirm each sign location with the Owner’s representative and locate via stake and flag for verification.

• Fabricator shall notify the Owner’s representative of any discrepancies in the design documents or graphics schedule as well as discrepancies in field dimensions or field conditions (drainage pipes, etc.) that would require changes in sign construction details. All discrepancies shall be brought to the attention of the Owner’s representative prior to production.

• Any conflicting conditions with signage that are not coordinated prior to the manufacturing of the scope of work will need to be addressed in the punchlist phase and will be the responsibility of the vendor.

ENGINEERING

• Footings: All footings to be verified by structural engineer as part of scope. Drawings show footings for intent only. An Engineer’s

Stamp is to be obtained when necessary to comply with permits and/or codes.

• Wind load: Exterior signs shall be designed to withstand wind pressure loading to meet or exceed all current code requirements for the state of Georgia. Internal framework should also provide maximum capacity to avoid any surface oil canning, curvature, or deviations.

• Thermal Deformations: Design, fabricate, and install component parts to provide for expansion and contraction over a temperature range for the material of 150 degrees Fahrenheit (83.3 degrees Celsius), without buckling, oil canning, sealant joint failure, glass breakage, undue stesss on members or anchors, and other detrimental effects.

ARTWORK

All enlarging and reducing of supplied artwork images is the responsibility of the signage fabricator. Any discrepancies after enlarging or reducing vs. original artwork are to be addressed with Owner’s representative prior to reproduction. Refer to the design documents for reference as to what artwork will be provided. Sky Design will not submit electronic artwork for contractors use in shop drawings except for custom created logos, icons, typography, etc. Artwork for general fabrication items will not be submitted so please account for this in your time frames and general costs.

SUBMITTALS

Color samples, material samples, submittals, copy layouts, and working drawings are to be provided for approval by the Owner’s representative and Owner prior to manufacture. Full size copy layouts will also be required as needed.

• Shop Drawings are the responsibility of the fabricator for each of the disciplines contained within and are to include all necessary dimensions drawn to scale, details, internal mechanicals, joint connections, hidden connections, anchorage to footings, section views as needed, etc. These must be submitted as one comprehensive package to be reviewed and approved prior to beginning any construction. Scans or copies of the enclosed design documents with contractor title block will not be accepted for approval as working drawings. The sign fabricator is responsible for all aspects of fabrication including engineering, installation techniques and performance, as well as coordination with site contractors and related trades.

• Paint: 3 samples of each color to be submitted on minimum 4” x 4” plate. One will be returned; the others will be retained for file references. All paints used must retain a minimum 5-year warranty for interior and exterior signage. This includes no cracking, flaking, or fading. Exterior paints should be 2-part catalyst hardened urethane, base coat, top coat, satin finish unless otherwise specified.

• Mock-ups: samples required for review and approval will be listed on Bid Summary Form.

• Vinyl: 3 samples of each color to be submitted as a minimum 4“ x 4” submittal. All vinyl is to be 3M Scotchcal graphic vinyl, or Gerber equivalent. First surface application unless otherwise specified on drawings.

• Inkjet and/or Printed Wallcovering: 1 proof of each type of inkjet graphic to be submitted at full-size. For large format graphics, a minimum 12” x 12”, full size portion should be submitted, along with a smaller-scaled full layout of each design/image. Proofs are to be of equal or greater reproduction quality than the original artwork provided. All inkjet graphics are to be printed on 3M material or equivalent using pigment-based ink to prevent fading and discoloration. If necessary, laminates on printed vinyl are to be 3M material or equivalent. All inkjet graphics to be matte laminated, unless otherwise specified. Warranty information for all inkjet applications to be provided at no less than five years. If a matte laminate is specified for use over printed wallcovering, then a liquid laminate must be used. All submittals must be provided on the material specified, along with the laminate (if specified), for approval.

MATERIALS

• All wood, stone, brick or brick veneer components to be sealed to protect against decay, mildew, and discoloration

• All aluminum components and panels to have a minimum wall thickness of .125” or greater

• The interior of all illuminated cabinets is to be painted bright white.

INSTALLATION

• Post and Panels in concrete or pavement to be installed via core drill footing and backfill.

• All breakaway details to conform to GA DOT standard requirements.

• Exterior ADA signs containing Braille should be produced using exterior grade photopolymer.

• Pin mounted letters should be set in Hilti epoxy or equivalent to deter theft and vandalism. Exterior pin mounted letters should be set in Hilti epoxy or equivalent and sealed with silicone or equivalent waterproofing sealer.

• Signage design and installation for this project must conform to all federal, state, and city regulations and ordinances. It is the responsibility of signage fabricator to submit drawings to the proper agencies for review and approval prior to construction. It is also the responsibility of the signage fabricator to obtain the necessary permits and approvals prior to construction.

• Footings to be Georgia stamped engineered footings with backfill as needed.

• It is the responsibility of the signage fabricator to include and perform all priming work as needed for wallcovering/graphics unless specifically stated as an exclusion in the vendor bid.

• Final electrical hook-up to be completed by the vendor.

• Vendor to include painted aluminum trimcap for all lit channel letters.

SIGNAGE PROTECTION

Fabricator to coordinate protection of all signs until punch list is completed by Owner.

Fabricator to be responsible for all equipment used to install signage, including but not limited to lifts, swing stages, equipment vehicles, and temporary attachments. It is the responsibility of the fabricator to ensure that all penetrations into all concrete, precast columns, beams, or building façades do not affect the structural integrity of the reinforcement within. Should damage occur to signage and/or the building structure/façade as a result of the signage installation process, it is the continued responsibility of the fabricator to manage the resolution process with all necessary parties until an agreed-upon solution is reached and damage is repaired. sky design holds zero liability for damages incurred to owner or contractor by owner or contractor on site.

WARRANTY

• Fabricator warrants work against failure due to faulty materials, workmanship, and design for a period of five years from date of substantial completion.

• Fading, cracking, oil canning, peeling, delaminating, rusting, corroding, and structural failure, including distortion, will be construed to mean failure due to faulty materials and workmanship.

• All products, materials, adhesives, paints, etc. shall be covered by standard warranty. Failures during the warranty period shall be repaired or replaced to the satisfaction of the Owner.

PROPRIETARY INFORMATION

Sky Design shall have the right to include a credit line on completed designs or any visual representation of drawings, models, sketches, photographs, etc. created by Sky Design in the development of this signage program. The credit shall be included in any publication of the designs by the Owner or by others.

F Building ID BB Secondary Gateway - Digital FF Building ID - Digital GG Park ID - Digital

C I T Y O F D O U G L A S V I L L E

Sign types are not indicated in scale (for general reference only).

Sign types colored in legend are relevant to SLP shown.

All locations will require additional review during contract administration phase to determine exact orientation, verbiage and placement.

Sign requires electrical.

SIGN #SIGN TYPE

L.#

L E G E N D

F.1 - Building ID

SCALE: NIS

BUILDING ID - DETAIL VIEW

BUILDING ID - EXISTING CONDITION

F.1

F.1

BUILDING ID - WIDE AERIAL VIEW

#0 12.05.2022 AG/CW/TC

#1 03.28.2023 AG/TC

Sign Location Plan

City of Douglasville Digital Signage

0.0

31549.01

FF Building ID - Digital GG Park ID - Digital

C I T Y O F D O U G L A S V I L L E

Sign types are not indicated in scale (for general reference only).

Sign types colored in legend are relevant to SLP shown.

All locations will require additional review during contract administration phase to determine exact orientation, verbiage and placement.

Sign requires electrical.

SIGN #SIGN TYPE

L.#

L E G E N D

F.2 - Building ID

SCALE: NIS

BUILDING ID - DETAIL VIEW

BUILDING ID - EXISTING CONDITION

F.2

F.2

BUILDING ID - WIDE AERIAL VIEW

#0 12.05.2022 AG/CW/TC

#1 03.28.2023 AG/TC

Sign Location Plan

City of Douglasville Digital Signage

0.1

FF Building ID - Digital GG Park ID - Digital

C I T Y O F D O U G L A S V I L L E

Sign types are not indicated in scale (for general reference only).

Sign types colored in legend are relevant to SLP shown.

All locations will require additional review during contract administration phase to determine exact orientation, verbiage and placement.

Sign requires electrical.

SIGN #SIGN TYPE

L.#

L E G E N D

BB.1 - Secondary Gatway - Digital

SCALE: NIS

GATEWAY ID - DETAIL VIEW

GATEWAY ID - EXISTING CONDITIONGATEWAY ID - WIDE AERIAL VIEW

BB.1

BB.1

Sign Location Plan

City of Douglasville Digital Signage

0.2

#0 12.05.2022 AG/CW/TC

FF Building ID - Digital GG Park ID - Digital

C I T Y O F D O U G L A S V I L L E

Sign types are not indicated in scale (for general reference only).

Sign types colored in legend are relevant to SLP shown.

All locations will require additional review during contract administration phase to determine exact orientation, verbiage and placement.

Sign requires electrical.

SIGN #SIGN TYPE

L.#

L E G E N D

FF.1 -Building ID - Conference Center

SCALE: NIS

BUILDING ID - EXISTING CONDITION

M .1

FF.1

#0 12.05.2022 AG/CW/TC

#1 03.28.2023 AG/TC

Sign Location Plan

City of Douglasville Digital Signage

0.3

FF Building ID - Digital GG Park ID - Digital

C I T Y O F D O U G L A S V I L L E

Sign types are not indicated in scale (for general reference only).

Sign types colored in legend are relevant to SLP shown.

All locations will require additional review during contract administration phase to determine exact orientation, verbiage and placement.

Sign requires electrical.

SIGN #SIGN TYPE

L.#

L E G E N D

FF - Building ID - Digital

SCALE: NIS

BUILDING ID - DETAIL VIEW

BUILDING ID - EXISTING CONDITIONBUILDING ID - WIDE AERIAL VIEW

FF.3FF.2

FF.3FF.2

#0 12.05.2022 AG/CW/TC

#1 03.28.2023 AG/TC

Sign Location Plan

City of Douglasville Digital Signage

0.4

FF Building ID - Digital GG Park ID - Digital

C I T Y O F D O U G L A S V I L L E

Sign types are not indicated in scale (for general reference only).

Sign types colored in legend are relevant to SLP shown.

All locations will require additional review during contract administration phase to determine exact orientation, verbiage and placement.

Sign requires electrical.

SIGN #SIGN TYPE

L.#

L E G E N D

GG.1 - Park ID - Digital

SCALE: NIS

PARK ID - DETAIL VIEW

PARK ID - EXISTING CONDITIONPARK ID - WIDE AERIAL VIEW

GG.1

GG.1

#0 12.05.2022 AG/CW/TC

#1 03.28.2023 AG/TC

Sign Location Plan

City of Douglasville Digital Signage

0.5

EXHIBIT B: SIGNS RENDERINGS AND DRAWINGS

F - Building ID

SCALE: 3/8” = 1’-0”

1 Detail

SCALE: 1” = 1’-0”

Detail

SCALE: 1” = 1’-0”

F - Back Elevation

SCALE: 3/8” = 1’-0”

F - Plan View

SCALE: 3/8” = 1’-0”

18"CITY OF DOUGLASVILLE

IKE OWINGS

COMMUNITY CENTER

IKE OWINGS

COMMUNITY CENTER

CITY OF DOUGLASVILLE

9'-6"

1.1

15"

15" 24"

7"

4 1/2"

4'-11"

20"

4"

4"

4 1/2" 3"

11"

IKE OWINGS

COMMUNITY CENTER

IKE OWINGS

COMMUNITY CENTER

CITY OF DOUGLASVILLE

3"

IKE OWINGS

COMMUNITY CENTER

IKE OWINGS

COMMUNITY CENTER

3" 3"

1 1/2"1 1/2"

1 1/2"

9"

3" 3"

6 1/2"

#0 12.05.2022 AG/CW/TC

#1 03.28.2023 AG/TC

City of Douglasville Digital Signage

31549.01

1.0

S P E C I F I C A T I O N S

MATERIALS:

A - FABRICATED ALUMINUM CABINET

WITH 1 1/2” REVEAL, 1” DEEP,

PAINTED (P1)

B - FABRICATED ALUMINUM FINS,

PAINTED (P8)

C - 1/2” THICK WATER-JET CUT ALUMINUM

COPY, PAINTED (P8)

D - 1/4” THICK WATER-JET CUT LETTERS,

PAINTED (P2 OR P8)

E - MASONRY CAP WITH CHAMFERED

EDGE DETAIL (M6)

F - STACKED STONE VENEER (M5)

ATTACHED TO FABRICATED

INTERIOR ALUMINUM CABINET

G - THIN BRICK CLADDING (M4)

H - 1” INSET IN BASE, THOROCOAT PAINT

TO RESEMBLE CONCRETE WITH 1”

RECESSED LOGO (P9)

INSTALL:

- ALL STRUCTURAL COMPONENTS

TO BE VERIFIED BY ENGINEER

- ALL SIGNS REQUIRE

COORDINATION WITH CONTRACTOR

PRIOR TO INSTALLATION

- SOME SIGN LOCATIONS WILL

INSTALL IN HARDSCAPE

- ALL DIMENSIONS TO BE FIELD

VERIFIED BY ENGINEER

- BACKFILL AS REQUIRED

- CONCRETE FOOTING TO BE

VERIFIED BY STRUCTURAL

ENGINEER

- ELECTRICAL POWER TO BE

COORDINATED

- INTERNAL FRAMING AS NEEDED

FOR STRUCTURAL PURPOSES

- AVOID OIL CANNING

NOTES:

1. ALL LOCATIONS WILL REQUIRE

ADDITIONAL REVIEW TO

DETERMINE EXACT ORIENTATION

AND PLACEMENT.

2. FABRICATOR TO FIELD VERIFY ALL

DIMENSIONS AND CONDITIONS

PRIOR TO FINAL PRODUCTION AND

ENGINEERING.

3. VENDOR WILL NEED TO

COORDINATE WITH LANDSCAPE

ARCHITECT FOR GRADING PRIOR

TO INSTALL.

F - Building ID - Alternate

SCALE: 3/8” = 1’-0”

IKE OWINGS

COMMUNITY CENTER

IKE OWINGS

COMMUNITY CENTER

CITY OF DOUGLASVILLECITY OF DOUGLASVILLE

Detail

SCALE: 1” = 1’-0”

6.3

6.4

6.4

IKE OWINGS

COMMUNITY CENTER

IKE OWINGS

COMMUNITY CENTER

CITY OF DOUGLASVILLECITY OF DOUGLASVILLE

7'-5"

5'-9"

31"

3 1/2"

3 1/2"

2 1/2"

3 3/4" TYP.

1 1/2"

11" 6" 6"4'-9 1/2"

3 3/4" 1/4"

2 3/4"

4 1/2"

1 3/4"

D

G

H

E

ACFE B

#0 12.05.2022 AG/CW/TC

#1 03.28.2023 AG/TC

City of Douglasville Digital Signage

31549.01

1.1

F - Building ID - Sign Face Detail (1 Line Variation)

SCALE: 1" = 1'-0"

F - Building ID - Sign Face Detail (3 Line Variation)

SCALE: 1" = 1'-0"

S P E C I F I C A T I O N S

MATERIALS:

A - 1/4” THICK WATER-JET CUT LETTERS,

PAINTED (P2 OR P8)

INSTALL:

- ALL STRUCTURAL COMPONENTS

TO BE VERIFIED BY ENGINEER

- ALL SIGNS REQUIRE

COORDINATION WITH CONTRACTOR

PRIOR TO INSTALLATION

- SOME SIGN LOCATIONS WILL

INSTALL IN HARDSCAPE

- ALL DIMENSIONS TO BE FIELD

VERIFIED BY ENGINEER

- BACKFILL AS REQUIRED

- CONCRETE FOOTING TO BE

VERIFIED BY STRUCTURAL

ENGINEER

- ELECTRICAL POWER TO BE

COORDINATED

- INTERNAL FRAMING AS NEEDED

FOR STRUCTURAL PURPOSES

- AVOID OIL CANNING

NOTES:

1. ALL LOCATIONS WILL REQUIRE

ADDITIONAL REVIEW TO

DETERMINE EXACT ORIENTATION

AND PLACEMENT.

2. FABRICATOR TO FIELD VERIFY ALL

DIMENSIONS AND CONDITIONS

PRIOR TO FINAL PRODUCTION AND

ENGINEERING.

3. VENDOR WILL NEED TO

COORDINATE WITH LANDSCAPE

ARCHITECT FOR GRADING PRIOR

TO INSTALL.

6'-7"

11"

CITY OF DOUGLASVILLECITY OF DOUGLASVILLE

CITY OF DOUGLASVILLECITY OF DOUGLASVILLE

2"

3" TYP.

1 3/4" TYP.

2 1/2"

3 3/4"

EQ

EQ

6" 6"

6" 6"

4'-9 1/2"

4'-9 1/2"

5'-9"

A

A

#0 12.05.2022 AG/CW/TC

#1 03.28.2023 AG/TC

City of Douglasville Digital Signage

31549.01

1.2

BELOW SCHEMATIC IMAGE SHOWN FOR

REFERENCE ONLY. REFER TO DRAWING SET FOR

DETAILS, SPECS, MEASUREMENTS, ETC.

#0 12.05.2022 AG/CW/TC

#1 03.28.2023 AG/TC

BB.1 - Gateway ID

City of Douglasville Digital Signage

2.0

31549.01

BB.1 - Gateway ID - Contextual Rendering

SCALE: NTS

DETAILS, SPECS, MEASUREMENTS, ETC.

#0 12.05.2022 AG/CW/TC

#1 03.28.2023 AG/TC

BB.1 - Gateway ID

City of Douglasville Digital Signage

2.1

31549.01

BB.1 - Gateway ID - 3D Model View

SCALE: NTS

BB.1 - Gateway ID - Existing Condition

BB.1 - Gateway ID

City of Douglasville Digital Signage

2.2

31549.01

BB - Back Elevation

SCALE: 1/8” = 1’-0”

BB - Plan View

SCALE: 1/4” = 1’-0”

BB - Gateway ID - Front Elevation

SCALE: 1/4” = 1’-0”

1 BB - Gateway ID - Side Elevation

SCALE: 1/4” = 1’-0”

Detail - View

SCALE: 1/2” = 1’-0”

1.3

1.3

30"

24'-0"

19'-6"

11'-9"

13'-9"

3'-2"

21"

32"

6'-2" 6'-9"

4'-7"

13'-9"

36'-0" 32'-0"

3'-9 1/2"

3'-2" 2"

TYP

3"

TYP

3"

2'-6"

12"

4'-8"

4 1/2"

7 1/2"

15" TYP

1'-5"

7" 3"

7"

7"

S P E C I F I C A T I O N S

MATERIALS:

A - FABRICATED ALUMINUM CABINET

PAINTED (P12)

B - MASONRY CAP WITH DECORATIVE

DETAIL (P8) SUPPORTED AND

MECHANICALLY FASTENED TO 2”

STOCK ALUMINUM POSTS (M3),

POSTS PAINTED (P8)

C - FABRICATED ALUMINUM CABINET

(P6), WITH INSET FACE PANEL

PAINTED (P7)

D - FABRICATED, 4“ DEEP, INTERNALLY

ILLUMINATED CHANNEL LETTERS;

ACRYLIC FACES WITH (V2)

OVERLAY; ALUMINUM TRIM CAP;

RETURNS PAINTED(P2)

E - MASONRY CAP WITH CHAMFERED

EDGE DETAIL (M6)

F - STACKED STONE VENEER (M5)

ATTACHED TO FABRICATED

INTERIOR ALUMINUM CABINET

G - BRICK CLADDING (M4)

H - DIGITAL SCREEN (H1)

INSTALL:

- ALL STRUCTURAL COMPONENTS

TO BE VERIFIED BY ENGINEER

- ALL SIGNS REQUIRE

COORDINATION WITH CONTRACTOR

PRIOR TO INSTALLATION

- SOME SIGN LOCATIONS WILL

INSTALL IN HARDSCAPE

- ALL DIMENSIONS TO BE FIELD

VERIFIED BY ENGINEER

- BACKFILL AS REQUIRED

- CONCRETE FOOTING TO BE

VERIFIED BY STRUCTURAL

ENGINEER

- ELECTRICAL POWER TO BE

COORDINATED

- INTERNAL FRAMING AS NEEDED

FOR STRUCTURAL PURPOSES

- AVOID OIL CANNING

NOTES:

1. ALL LOCATIONS WILL REQUIRE

ADDITIONAL REVIEW TO

DETERMINE EXACT ORIENTATION

AND PLACEMENT.

2. FABRICATOR TO FIELD VERIFY ALL

DIMENSIONS AND CONDITIONS

PRIOR TO FINAL PRODUCTION AND

ENGINEERING.

3. VENDOR WILL NEED TO

COORDINATE WITH LANDSCAPE

ARCHITECT FOR GRADING PRIOR

TO INSTALL.

BB.1 - Gateway ID

City of Douglasville Digital Signage

2.3

31549.01

BB - Front Elevation

SCALE: 1/8” = 1’-0”

Detail - View

SCALE: 1/2” = 1’-0”

Detail - Elevation

SCALE: 3/8” = 1’-0”

2'-8"6 1/4"

1.5

1.4

1.4

E.Q

8" 5"

1"

TYP

31" TYP

15'-4"

16'-4"

5" TYP

1/8"

1'-3"

4" 12"

A

H

B

E

E

C

FC

G

D

BB.1 - Gateway ID

City of Douglasville Digital Signage

2.4

31549.01

8'-9"

3" 3'-0"

3"

1'-2"

4"

Section

SCALE: 1/2” = 1’-0”

2Section

SCALE: 3/4” = 1’-0”

ENGINEER TO DETERMINE

SIZE OF CONCRETE FOOTING

ENGINEER TO DETERMINE

SIZE OF CONCRETE FOOTING

ELECTRICAL POWER

(BY OTHERS) TO BE RUN

TO SIGN LOCATION

COLUMN BEYOND

BACK FRONT

DIGITAL SCREEN

CHANNEL LETTERS

BB.1 - Gateway ID

City of Douglasville Digital Signage

2.5

31549.01

Section

SCALE: 3/4” = 1’-0”

Section

SCALE: 3/4” = 1’-0”

BASE BID INTENT DRAWING

CURVED DIGITAL SCREEN

BID ALTERNATE DRAWING

FLAT DIGITAL SCREEN

DETAILS, SPECS, MEASUREMENTS, ETC.

#0 12.05.2022 AG/CW/TC

#1 03.28.2023 AG/TC

FF.1 Conference Center Building ID

City of Douglasville Digital Signage

3.0

31549.01

FF.1 - Conference Center Building ID

FF.1 - Conference Center Building ID

City of Douglasville Digital Signage

3.1

31549.01

2.2

Detail

SCALE: 1” = 1’-0”

Detail

SCALE: 1” = 1’-0”

FF.1 - Back Elevation

SCALE: 3/8” = 1’-0”

F.3 - Plan View

SCALE: 3/8” = 1’-0”

FF.1 - Conference Center Building ID

SCALE: 3/8” = 1’-0”

DOUGLASVILLE

CONFERENCE CENTER

DOUGLASVILLE

CONFERENCE CENTER

DOUGLASVILLE

CONFERENCE CENTER

DOUGLASVILLE

CONFERENCE CENTER

15"

30"

4'-6"

8'-3"

10"

4'-6"

32"

24"

11"

21"

3"

5"

2"

8"

7/8"

16 1/2"

4 3/8"

3"

1/8"

6"

3" 3/8"

24"

9'-1"

7'-4” VIF

8'-0"

15"

15"

2"

FF.1 - Conference Center Building ID

S P E C I F I C A T I O N S

MATERIALS:

A - FABRICATED ALUMINUM CABINET

PAINTED (P12)

B - MASONRY CAP WITH DECORATIVE

DETAIL (P8)

C - 1/2” THICK WATER-JET CUT ALUMINUM

COPY, PAINTED (P8)

D - 1/2” THICK WATER-JET CUT LETTERS,

PAINTED (P8)

E - MASONRY CAP WITH CHAMFERED

EDGE DETAIL (M6)

F - STACKED STONE VENEER (M5)

ATTACHED TO FABRICATED

INTERIOR ALUMINUM CABINET

G - BRICK CLADDING (M4)

H - 1” INSET IN BASE, THOROCOAT PAINT

TO RESEMBLE CONCRETE WITH 1”

RECESSED LOGO (P9)

J - DIGITAL SCREEN (H2)

K - CAST CONCRETE BASE WITH

DECORATIVE DETAIL

INSTALL:

- ALL STRUCTURAL COMPONENTS

TO BE VERIFIED BY ENGINEER

- ALL SIGNS REQUIRE

COORDINATION WITH CONTRACTOR

PRIOR TO INSTALLATION

- SOME SIGN LOCATIONS WILL

INSTALL IN HARDSCAPE

- ALL DIMENSIONS TO BE FIELD

VERIFIED BY ENGINEER

- BACKFILL AS REQUIRED

-…

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
Deadline extension- scope remo —
Award Information —
Message schedule —
Q&A From Pre-bid meeting —
Q&A —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file