Water_Treatment_Services-RFP_Changes.docx

DOCX document 17 KB Posted

Attached to
Water Treatment Services
Solicitation number
26-001-ITB - Services
Issued by
Bell County, Kentucky

About this file

This is a Water Treatment Services Request for Proposal document issued by the Kenton County Airport Board (KCAB) for the Cincinnati/Northern Kentucky International Airport (CVG) in Hebron, Kentucky. The procurement seeks a qualified firm to provide comprehensive water treatment services including professional testing, chemical provision, equipment operation and maintenance, and consulting services across multiple airport facilities. Required deliverables include monthly site visits, quarterly Legionella testing across 16 buildings, annual equipment inspections, staff training, and specialized laboratory analysis. The contractor must provide continuous monitoring and automated control of water treatment chemicals for condenser water systems, chilled water loops, hot water heating systems, and cooling towers at various facilities including the Main Terminal, Concourse B, CVG Centre, and the Preconditioned Air System. The annual condenser water make-up consumption requirements are substantial, totaling approximately 16.9 million gallons across all facilities (12.47 million gallons at Main Terminal, 1.375 million gallons at Concourse B, and 3.127 million gallons at CVG Centre), with central chilled water consumption of 20,230 gallons recorded at the Main Terminal. Questions must be submitted by January 26, 2026 at 11:59 pm, with answers posted by January 29, 2026 at 11:59 pm. Proposals are due by February 5, 2026 at 2:00 pm Eastern Time, with interviews scheduled for the week of February 16, 2026. The contract will be effective from March 1, 2026, through February 28, 2029, with KCAB retaining the option to renew for two additional one-year periods.

Minimum qualifications require the contractor to be a water treatment service company with at least 10 years of experience treating similar-sized hydronic systems, possess certified laboratory capabilities within 24-hour travel distance, and demonstrate relevant quality control certifications. The contractor must maintain a Certified Water Technologist on staff, provide contractor-furnished equipment including electronic metering pumps and a cloud-based monitoring application, and offer 24/7 emergency response within four hours of notification. The contract includes annual price adjustments based on the Consumer Price Index for the Cincinnati/Northern Kentucky metropolitan area, capped at three percent of the current annual contract price. The contractor must maintain comprehensive insurance coverage including commercial general liability ($2,000,000 to $10,000,000), automobile liability, workers' compensation, and unemployment insurance, with KCAB named as an additional insured. Kentucky resident bidders receive statutory preference in accordance with Kentucky Revised Statutes, with preference equal to the preference given by their home state. KCAB affirms compliance with Title VI of the Civil Rights Act of 1964 and commits to ensuring disadvantaged business enterprises receive full and fair opportunity to submit bids without discrimination.

View the file

Other files

File Type Posted
Water_Treatment_Services.pdf PDF
System_Requirements.xlsx XLSX spreadsheet
Equipment_&_Systems_by_Building.docx DOCX document
Proposed_Water_Treatment_Services_Contract.pdf PDF
Notice_to_Bidders.pdf PDF
KCAB_Water_Management_Program.pdf PDF
Water_Treatment_Services-RFP_Changes.docx DOCX document
Resident_&_Non-Resident_Bidder_Affidavits.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Treatment Services B.1.18 Remove Fire Training and KCAB Cargo Bldg. from list C.1.2 Main Terminal Facility Chiller Plant Review Chiller York 1300-ton water cooled chiller, 3,995 lbs. of R-134a water cooled chiller, Condenser flow 3,900 GPM @17.6’, in 85ºF out 94.3ºF Evaporator flow 1,950 @ 10.9’, in 57ºF, out 41ºF York 1300-ton, 1958 lbs. of R-134a water cooled chiller, Condenser flow 6,000 GPM @ 25’, in 85ºF out 94.6ºF- Evaporator flow 3,000 @ 22’, in 57ºF out 41ºF Cooling Towers Cells CT-1 to CT-4 – induvial cells – Marley cooling tower, Cross flow pattern, 2,000 GPM, entering water 95ºF, exiting water 85ºF with a wet bulb of 78ºF. Cell CT-5 – induvial cells – Marley cooling tower, Cross flow pattern, 2,295 GPM, entering water 95ºF, exiting water 85ºF with a wet bulb of 78ºF.

C.1.3 Remove, there is no plate and frame there C.1.4 Airport Chilled Water Production This is the primary facility used to supply chilled water to the airport central chilled water system. The airport utilizes a water side economizer due to the exhaust from the planes which encircle the buildings.

41ºF to 75ºF outdoor air temperature: The chilled water is supplied by a 1,300-ton chiller to produce the needed chilled water.

75ºF to 95ºF outdoor air temperature: The chilled water is supplied by one or two 1300-ton chillers to produce the needed chilled water.

C.1.5 Condenser Water Annual Make-up Water Consumption The Main Terminal condenser water make-up from August 2024 until August 2025 was recorded on the airport meter as consuming 12,472,900 gallons of water.

C.1.6 Central Chiller Water Annual Make-Up Water Consumption The Main Terminal is the only central chilled water system make-up point for the facility. From August 2024 until August 2025 the make-up water consumption was recorded on the airport meter as 20,230 gallons of water.

C.2.2 Preconditioned Air System York 400-ton air cooled chiller, 685 lbs. of R134a C.2.3 Remove, there is no Condenser Water makeup in A con C.3.2 Concourse B Facility Chiller Plant Review 2- Carrier 400-ton chillers R134a – (these chillers are for the PCA system but share the cooling towers with the 2500-ton chiller) Condenser Flow 1,200 GPM Evaporator Flow 1,185 GPM York 2500-ton chiller R134a Condenser 6,000 GPM Evaporator 3,750 GPM C.3.4 Remove, there is no plate and frame.

C.3.5 Airport Chilled Water Production Concourse “B” chiller plant and cooling tower are used as a back-up chilled water plant in the event of a Terminal 3 chiller has an outage or failure.

76°F to 95°F outdoor air temperature the chilled water is supplied by a 2,500-ton chiller to produce the needed chilled water.

C.3.6 Condenser Water Annual Make-Up Water Consumption The Concourse “B” condenser water make-up from August 2024 until August 2024 was recorded on the airport meter as consuming 1,375,000 gallons of water C10.2 CVG Centre Facility Chiller Plant Equipment Chillers 2-York 450 ton, 930 lbs. each of R-134a water cooled chiller, Condenser flow 1,350 GPM @ 18.7’, in 85ºF out 94.1ºF, Evaporator flow 900 @ 23.1’, in 57ºF out 45ºF.

Cooling Towers 2-Marley 450-ton, Gear drive tower fan on a VFD, Condenser flow 1,350, in 94.1ºF out 85ºF.

Cooling Towers Sump under Towers The approximate dimensions are 14’ wide by 48’ long with a normal pool depth of 6’.

The make-up water is added at 5’ and stopped at 7’. The approximate volume of the cooling tower sump is 30,000 gallons.

CVG Centre Chilled Water Production:

CVG Centre chiller plant and cooling tower are a standalone chilled water plant located in the lower level of the CVG Centre.

55ºF and below outdoor air temperature The office facilities utilize an air-side economizer to provide the needed chilled water. This facility computer room utilizes a glycol loop and dry-coolers to provide the needed cooling to the Package Air Condition units.

56ºF to 95ºF outdoor air temperature The chilled water is supplied by one 450-ton chiller to produce the needed chilled water.

Condenser water annual make-up water consumption The CVG Centre condenser water make-up from August 2024 until August 2025 was recorded on the airport meter as consuming 3,127,100 gallons of water

File details come from the government source that posted it. Updated .