Washakie SOI.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- UNITED STATES FOREST SERVICE, ROCKY MOUNTAIN REGION 2, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
- Solicitation number
- 1240LU24R0013
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items spreadsheet for road work to be performed in 2024 on the Washakie Ranger District of the Shoshone National Forest in Region 2. The document outlines eight specific pay items including mobilization, construction survey and staking, soil erosion and pollution control, removal of existing 12"-24" culverts, aggregate surface course installation, roadway reconditioning for 33.9 miles of Level 3 roads, installation of 168 linear feet of 18-inch corrugated metal pipe, and maintenance of culverts, catch basins, and drainage dips.
This schedule of items is associated with a broader IDIQ MATOC solicitation (1240LU24R0013) for road and bridge construction services in USFS Region 2. The broader contract is a small business set-aside under NAICS 237310 with a $45 million size standard, featuring a base period of two years plus three one-year options, and task orders ranging from $2,000 to $3,000,000 with a total shared ceiling of $50,000,000 across all awardees.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Past Performance Questionnaire.docx | DOCX document | |
| Cottonwood Plans 2.pdf | ||
| Cottonwood Plans 1.pdf | ||
| Berry Creek Plans.pdf | ||
| Washakie Plans.pdf | ||
| Washakie Food Storage Order.pdf | ||
| Washakie TOPR.pdf | ||
| Berry Creek TOPR.pdf | ||
| Cottonwood TOPR.pdf | ||
| 1240LU24R0013 Region 2 Road and Bridge MATOC.pdf | ||
| Washakie FSSS.pdf | ||
| Cottonwood SOI.xlsx | XLSX spreadsheet | |
| Berry Creek Submittal Reg.xlsx | XLSX spreadsheet | |
| Berry Creek FSSS.pdf | ||
| Cottonwood Submittal Reg.xlsx | XLSX spreadsheet | |
| Berry Creek SOI.xlsx | XLSX spreadsheet | |
| Equipment Cleaning Form_Fillable_20241203.pdf | ||
| Cottonwood Map.pdf | ||
| Cottonwood FSSS.pdf | ||
| R2 Fire Plan.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Region 2 |
| Shoshone National Forest |
| Washakie Ranger District |
| Washakie Road Work 2024 |
| Schedule of Items | |||||
| Pay Item No. | Description | Quantity | Unit | Unit Price | |
| ($) | Total Price |
| 15101 | Mobilization, including to project area and between sites | 1 | LS | ||
| 15201 | Construction Survey and Staking, Conventional Survey Methods | 1 | LS | ||
| 15713 | Soil Erosion & Pollution Control | 1 | LS | ||
| 20301A* | Removal of Existing Culverts, 12”-24”, Disposal Method “a”, Remove from Project | 3 | EA | ||
| 30101C* | Aggregate Surface Course, Gradation U, Compaction Method "B" | 558 | Ton | ||
| 30302* | Roadway Reconditioning, Level 3 Roads, (b) Compaction Method 2 | 33.9 | MILE | ||
| 60201A* | 18-inch Diameter 16-Gauge Corrugated Metal Pipe, Compaction Method “f” | 168 | LF | ||
| 80501A* | Culvert and Catch Basin Cleaning, under 24" | 28 | EA | ||
| 80502A* | Drainage Dip Maintenance | 2 | EA | ||
| * Designates contract quantity pay item | TOTAL : | $0.00 |
Sheet2
File details come from the government source that posted it. Updated .