This is a construction plan set for the South Cottonwood Creek Bridge #344-3.04 replacement project located in the Pike-San Isabel National Forest, Salida Ranger District in Colorado. The plans were originally stamped in 2015 and approved in 2016, with a February 2023 revision removing work items associated with the temporary bypass road.
The plans detail the replacement of an existing bridge with a new 56'-10" long weathering steel girder bridge designed for HL93 loading with a 20 mph design speed. Key components include four W30x132 girders, cast-in-place concrete deck, abutments and wingwalls, elastomeric bearing devices, and W-beam bridge railing designed to TL-2 standards. The bridge is designed to pass a 100-year flood with Q100=472 cfs. Specific technical requirements include Class C(AE) concrete with 4000 psi strength, AASHTO M270 Grade 50W structural steel, and provisions for a future 2-inch asphalt overlay. The plans include detailed drawings for foundations, abutments, girders, deck construction, and utilities including a 2-inch waterline that must be temporarily relocated during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Past Performance Questionnaire.docx | DOCX document | |
| Cottonwood Plans 2.pdf | ||
| Berry Creek Plans.pdf | ||
| Washakie Plans.pdf | ||
| Washakie Food Storage Order.pdf | ||
| Washakie TOPR.pdf | ||
| Berry Creek TOPR.pdf | ||
| Cottonwood TOPR.pdf | ||
| 1240LU24R0013 Region 2 Road and Bridge MATOC.pdf | ||
| Washakie FSSS.pdf | ||
| Washakie SOI.xlsx | XLSX spreadsheet | |
| Cottonwood SOI.xlsx | XLSX spreadsheet | |
| Berry Creek Submittal Reg.xlsx | XLSX spreadsheet | |
| Berry Creek FSSS.pdf | ||
| Cottonwood Submittal Reg.xlsx | XLSX spreadsheet | |
| Berry Creek SOI.xlsx | XLSX spreadsheet | |
| Equipment Cleaning Form_Fillable_20241203.pdf | ||
| Cottonwood Map.pdf | ||
| Cottonwood FSSS.pdf | ||
| R2 Fire Plan.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
February 2023 revision
Plans have been revised to remove most work items associated with the temporary bypass road which will be constructed and in place prior to the start of the work covered under these plans and any resulting contract.
Other miscellaneous items have also been eliminated and all changes are indicated by strikeouts in both the Plans and the Schedule of Items.
None of these changes impact the functional design regarding technical considerations or the form, fit, and function of the final intended product as designed and stamped in 2015 and approved in 2016.
Forest Engineer
Region 2 Bridge Engineer f?
GENERAL NOTES
SPECIFICATIONS THE WORK SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP 14) AS MODIFIED FOR THIS CONTRACT.
GEOIECHNICAL REPORT A GEOTECHNICAL REPORT IS AVAILABLE FOR THIS SITE.
CONSTRUCTION OF
UTILITIES • THE CONTRACTOR IS RESPONSIBLE FOR LOCATING, PROTECTING, MAINTAINING SERVICE. AND COORDINATING OUTAGES OF EXISTING UTILITIES THROUGHOUT THE TERM OF THE CONTRACT. CONTRACTOR SHALL COORDINATE OUTAGES AND
REROUTING OF UTILITIES WITH
UPPER ARKANSAS WATER COTTONWOOD LAKE
CONSERVATION DISTRICT SUMMER GROUP HOMES
339 E. Highway 50 Robert Norder Salida, CO 81201 402-353-2135 Phone: (719) 539-5425 549 ,1ain St. P.O. Box 20
Bruning NE 68322
EXCAVATION ANY EXCESS AND UNSUITABLE EXCAVATION SHALL BE DISPOSED OF ON OR NEAR THE PROJECT SITE AS
APPROVED BY THE CO.
CONCBETE WASTE CONCRETE SHALL NOT BE DISCHARGED INTO COTTO�IWOOD CREEi< OR THE LAKE. DISPOSE tAATERIAL OFF NATIONAL
FOREST LANO ACCORDING TO FEDERAL, STATE, ANO LOCAL LAWS.
REINFORCING STEEL ; BLACK REINFORCING STEEL SHALL CONFORM TO AASHTO M 31, 60 ksi (ASTM A615, GRADE 60). EPOXY COATED REINFORCING STEEL SHALL CONFORM TO AASHTO M 284, 60 ksi CLE.I\RANCE TO REINFORCING IS 2" UNLESS NOTED OTHERWISE.
REINFORC��
MINIMUM LAP SPLICES SHALL BE AS SHOWN IN THE FOLLOWING CHART. ADJACENT BARS MAY BE LAP SPLICED AT THE SAME LOCATION.
BLACK BARS EPOXY BARS
BAR TOP BAR" ALL OTHERS BAR TOP BARA ALL OTHERS
#3 1'-0" 1 '-0" #3 1'-1" 1'-0" #4 1'-7" 1'-1" #4 1'-10" 1'-8" #5 2'-4" 1'-8" #5 2'-10" 2'-6" #6 J'-4" 2'-5" #6 4'-1" 3• �" -1
#7 4'-7" 3'-3" #7 5'-6" 4'-11" #8 6'-0" 4'-3" #8 7'-3" 6'-5" #9 7' -7" 5'-5" #9 9'-2" 8'-1" #10 9'-7" 6'-10" #10 11'-8" 10'-3"
""TOP BAR" REFERS TO A HORIZONTAL BAR WHICH SHALL HAVE MORE THAN 1 FOOT OF CONCRETE CAST BELOW IT.
CONCRETE : CAST-IN-PLACE CONCRETE SHALL BE CLASS C(AE) AND SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4000 PSI
SUMMARY OF QUANTITIES
ITEM NO. DESCRIPTION
METHOD OF ** P-Ai'
MEASUREMENT UNIT
15101 co LS
15205 CQ LS
15212 co LS
15255 CQ LS
15702 co FT 15752 co EA 2012 co LS 20305 co LS 20422 co CY 20455 co CY
20470 Roadway excavation CQ CY 20801 Structure excavation co CY 20803 Structural backfill co CY 25102 Placed riprap, class 3 AO TON 25116 Geotextile, class 1, type A AQ SY 30111 Aggregate surface course, COOT Closs 6, compaction method B AO CY 55204 Structural concrete, class C (AE), for deck, abutments, wingwalls, and footings co CY 55401 Reinforcing steel co LB 55404 Epoxy coated reinforcing steel co LB 55501 Structural steel superstructure, furnished, fabricated, and erected co LB 55601 W-beam, type IV, class A, steel bridge railing CQ FT 55607 Terminal section, type 3K co EA 55650 Bridge approach railing, type IV, class A co FT 56302 Painting, concrete bridge structure co SY 56401 Elastameric bearing device (reinforced) co EA 61102 2 inch waterline, galvanized co FT 61104 Valve, drain co EA 62406 Placing conserved topsoil co CY UNLESS NOTED OTHERWISE. ALL EXPOSED EDGES SHALL HAVE A 3/4" CHAMFER. UNLESS NOTED OTHERWISE. EXPOSED SURFACES NOT RECEIVING 62502 Seeding, dry method co SY PAINT SHALL BE GIVEN A CLASS 2 FINISH, UNLESS NOTED OTHERWISE. SURFACES TO BE PAINTED SHALL RECEIVE A CLASS 6 FINISH
(REFER TO SPECIAL CONTRACT REQUIREMENT 563 AND STANDARD SPECIFICATION 552.16(F). THE TOP SURFACE OF THE DECK SHALL RECEIVE A TRANSVERSE GROOVED FINISH, PER 552.14 (c)(1). STAY-IN-PLACE FORMS SHALL BE USED.
STRUCTURAL STEEL STRUCTURAL STEEL SHALL BE AASHTO M270 GRADE SOW (ASTM A709 GRADE SOW) UNLESS NOTED OTHERWISE.
WEATHERING STEEL SHALL NOT BE PAINTED.
l::JIGH STRl;;NGTH BOLT;i ALL BOLTS SHALL BE 7 /8" DIAMETER ASTM A325, TYPE 3. DIRECT TENSION INDICATOR WASHERS
SHALL CONFORM TO ASTM F959.
SHEAR STUDS MATERIAL FOR ANCHOR STUD SHAFTS SHALL CONFORM TO AASHTO M169 (ASTM A108 GRADES 1010 TO 1020).
MATERIAL FOR THE CAPS SHALL CONFORM TO ASTM A109.
FIELD WELDING FIELD WELDING OF ANY KIND SHALL NOT BE PERMITTED ON THE STEEL GIRDERS UNLESS SPECIFICALLY CALLED
FOR ON THE PLANS.
CONSTRUCTION STABIUlY : CONTRACTOR IS RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE THROUGHOUT THE DURATION OF CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR TEMPORARY BRACING OF THE GIRDERS DURING PLACEMENT OF DECK (AND OVERHANG) AND END DIAPHRAGM CONCRETE, UNTIL THE DECK CONCRETE REACHES THE 28-DAY COMPRESSIVE STRENGTH.
DESIGN DATA
DESIGN THIS STRUCTURE IS DESIGNED FOR HL93 LOADING IN ACCORDANCE WITH THE 7TH EDITION OF MSHTO LRFD SPECIFICATIONS FOR HIGHWAY BRIDGES WITH CURRENT INTERIMS. THE DESIGN INCLUDES AN ALLOWANCE FOR A FUTURE ASPHALT OVERLAY OF 2 INCH DEPTH AND 5 LBS. PER SQ. FT. FOR PERMANENT STEEL DECK FORMS. BRIDGE RAIL DESIGNED TO LEVEL TL-2.
DESIGN SPEED IS 20 MPH.
THE DESIGN OATA IS AS FOLLOWS:
$ b = 0.45 ULTIMATE BEARING PRESSURE: 8,000 PSF
STRUCTURAL BACKFILL UNIT WEIGHT: 130 PCF
EQUIVALENT FLUID LATERAL EARTH PRESSURES: 35 PCF (ACTIVE). 55 PCF (AT-REST), 450 PCF (PASSIVE)
SLIDING RESISTANCE FACTOR: 0.8
COEFFICIENT OF FRICTION = 0.7
l:IYD!lQLQ!,Y A�D l:IYDB6Ul,,ICS THIS BRIDGE IS DESIGNED TO PASS A 1 00-YEAR FREQUENCY FLOOD (Q100=472 cfs V1 00=54 fps DEPTH100=3.4 ft)
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE ,_
·rr,s� R-2i�I
ROCKY MOUNTAIN REGION
� ,r Forest
SOUTH COTTONWOOD CREEK
PIKE-SAN !SABEL NATIONAL FOREST
/,, � SALIDA RANGER DISTRICT
f?
63306 Object markers, type Ill 63308 Removing and resetting sign 63310 Removing sign 63650 Conduit, 2 inches, Steel
TEMPORARY BYPASS ITEMS
15201 Construction survey and staking; method I, tolerance A 20350 Remove and reset existing timber bridge superstructure 20455 Embankment construction 20470 Roadway excavation 20801 Structure excavation 21102 Road obliteration, method 1 30111 Aggregate surface course, COOT Class 6, compaction method B 60258 12" Reinforced concrete pipe, class V 61102 Temporary 2 inch waterline, HOPE 61906 Remove and reset fence (gate) 63308 Removing and resetting object markers 63308 Remove and reset signs 63501 Temporary traffic control 63650 Temporary 2 inch conduit,steel j
#-11-'""1,��\)0 R£ 07/11,�
� ........ J'.� � l <:S � •·\ s. T�Hd• --.A �
- wt;.•4
• � ...A;tt ;j,� j� .f" -:s :
o= 29551 : !
:..,,• � -•a::
i � \1 Jr:)/!> l �¼ i
1.....-
EXCESS STRUCTURAL EXCAVATION (CY)
ROADWAY EXCAVATION (CY)
EMBANKMENT CONSTRUCTION (CY)
co co co co co co co co co co
AO
co co co co co co co
EARTHWORK SUMMARY
(FOR INFORMATION ONLY***)
ABUT. 1 SIDE ABUT. 2 SIDE
226 226 7 4
147 249
� ;.c", • •• � �� .... "I',,. ····--·· • .. �. _S, *''FROM COMPUTER CALCULATIONS COMPLETE IN PLACE
-h. ,.,11.,.l \\' _,.,,,.
RST ''llffltmti n .«W�heet Title: "" (/ Design:
GENERAL NOTES Drawn; LLF
Checked: JAR
AND QUANTITIES
Date: NOV 2015
1-iDR f':ngineE?ring, Inc, A %_ S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344�3.04 .L, %_
EA
EA
EA
FT
LS
LS
CY
CY
CY
LS
CY
FT
LS
EA
EA
EA
LS
LS
FSR 344 TOTAL
Sub Sheet:
G1
--rSTIMAI ED
QUANTITY
22,270 18,950 34,860
112.50 100.00
34.50
BYPASS TOTAL
� t? Submittal: �
PS&E
Shee! I
,,; � I A
11+00
U.S. DEPARTMENT OF AGRICULTURE m FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION
BACKFACE
ABUT. 1
ELEV. 9563.22
AT <k_ BRIDGE
<k_ BEARING
0%
58'-1 1/8"*
52'-7 1/8"*
BRIDGE RAIL
s:z = Q
ELEV.=
_;r:c=�
CLASS 3
RIPRAP (TYP.)
11+50
* ALONG ([ ROAD
12+00
1 ELEVATION
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
il POST
STA. 12+73.65
(t POST
STA 12+15 51
OFFSET 31.43' RT.
E�ISTING GATE
(TO REMAIN)
(k_ BEARING
ACKFACE
ABUT. 2
2'-9"*
/ EXISTING EDGE
OF
ROAD (TYP.)
- -,i', ' • '.
PROPOSED GRADE (TYP.)
12+50 l
Sheet Title:
I I
I
I
I
I
I
I i I
I
I
I
I
I I
I/ I , I , I' I
//\/ I
I
WEATHERING STEEL
POST AND W-BEAM
(TYP.)
1'-9"
ROLLED STEEL WIDE
FLANGE GIRDER
(WEATHERING STEEL)
(TYP.)
2'-7 1/2"
Design: RST
Drawn: L F GENERAL LAYOUT Checked: JAl's
Date: NOV 2015
NOTES
1. FOR RIPRAP DETAILS. SEE SHEET 13
2. EXISTING W,ATER SERVICE SHALL BE TEMPORARILY RELOCATED AND
PROTECTED DURING CONSTRUCTION. CONSTRUCT NEW WATER SERVICE
ON NEW BRIDGE AS SHOWN; SEE SHEETS 2, 12 AND 13
3. CO�IDUIT FIELD LOCATIO�IS SHALL BE APPROVED BY THE CO F'RIOR
TO INSTALLATION, SEE SHEET 2 FOR UTILITY CONTACT INFORMATION.
([ ROAD
(i;_ BRIDGE
14'-o" 14'-0"
2" STEEL WATER
CONDUIT. SEE NOTE 2.
co
PROFILE
GRADE LINE 2% ' -
8'-9" 8'-9"
4'-4 1/2" 4'-4 1/2"
TYPICAL SECTION
1'-9"
2'-7 1/2
Sub Sheet· Submittal:
C1
PS&E
Sheet
HOR Engineering, Inc. S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04 alamp Cross-Out
___ J
CP 4
/15 REBAR W/
2" ALUM. CAP
(11=1J46209.925 l:=2778306.154 ELe:9559.525
LAT. 38.78134403
LONG. -106.2777095
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION
PROFILE
Foresl !Design: RST
SOUTH COTTONWOOD CREEK Drown:
PIKE-SAN !SABEL NATIONAL FOREST Ctiecked! J8B
Dale: NOV, 2015
SALIDA RANGER DISTRICT HOR En ineerin , Inc.
Sheet fi\le:
4. FOR UTILITY DETAILS SEE SHEETS 12 AND 13.
5.
6.
7.
ENO (i ROAD
PC 51A 13+47.07
N=-13461 B7 .6160 E-2778597.6940
FINAL LOCATIONS OF SEDIMENT BASINS ANO SILT FENCE
{WATTLES) SHALL BE APPROVED BY THE CO,
RESERVED
ALL TREE REMOVALS SHALL NOT BE PA1D f'OR
SEPARATELY, BUT SHALL BE !INCLUDED IN ITEM 20102.
- CP 2
15 REBAR W/
!i" ALUM. CAP N=l.346127.289 E=2778543.759
EL.=9567. 146
LAT. 38.78112283
LONG. -106.27687 4
SHADING INDIATES
LIMITS OF 4"
SURFACE AGGREGATE.
CURVE DATA
CURVE NO. R 6. T
C1 180' 18'25'02" 29.18'
C2 60' 50·00·00" 34.64
OF ROAD POINTS
POINT SfATION
0 10+73.611
10+93.66
11+02.88
© 11+10.66
11+19.47
© 11+23.89
11+36.68
® 11+48.87
® 11+67.75
10-t-73.61 l 1+44.23
12+27.60
12+75.35
G3l 13+26.57
13+47.07
12+02.5.3
12+14.JJ
12+.36.90
13+47.07
Sub Sheet:
.OFFSET
13.41' LT,
12.01' LT.
20.19• LT.
21.57' LT,
12.00' LT.
12.00' LT,
28.30' LT.
29.20' LT.
16.60' LT
17.13' RT,
16.60' RT.
16.43' LT
17.21' LT.
12.0' LT.
12.0' LT.
ELEVATION
9564.71
9563.94
9566.00
9566.00
9563.22
9563.14
9562.73
9562,64
9562.90
9564.10
9563.55
9562.90
9562.88
9562.98
9562.98
16.68' RT. 9563.55
J3.J6' RT. 9563.89
42.10' RT. 9562.10
12.0• RT. 9562.98
Project No:
SURVEY CONTROL PLAN AND
C2
PS&E
CONSTRUCTION LAYOUT Sheet
S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04
alamp Line alamp Line alamp Line alamp Line alamp Line alamp Line alamp Line alamp Line alamp Line alamp Line alamp Line
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION
HWY-344
PLAN
Forest
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
TH·f TH-2 El. 10-0 El.100
100 100 2a/12
27112
~!le ~1◄2o 95 C0•1:3 95 -~12 00,,13$ ' :lO(Jt, I
90 90
85 85
. 'NA ✓,s'fi>.
10 au£
- ~ Iii 60 80
"'••!. Ill ...
~ w 7Ci 75
Design: CTL THOMPSON
Drown: CTL THOMPSON
17 Sheet Title:
ENGINEERING GEOLOGY
Checked: CTL THOMPSON
Dote: NOV. 201 5
LEOENO:
~ GRAVE_L. SANDY. MEDl'-'-1 DENSE TO
~ DENSE. MOIST. BROWN, GRAY.
P
DRIVE SAMPLE. THE6YM60L 29112 INDIOATES
29 BLOWS OF A 140.POUND HAWER ~ALLIN<l ;io INCHES WERE REQUIREOTOCRIVE A 2..9-INCH 0.0. SAMPLER 12 ll'CHES.
T !PRACTICAL DRILL REFUSAL
NOTES:
I , THI;, BQRINGS WERE DRILI.E.0 OH
OCTOBER 7. :2014 USING ~-lt.lCH DIAMETER.
CONTINVOUS·FL!GHT AVQ.ER ~c, '
TRUCU10UNTEO DRILL RIO.
2. 'THE BORING ELEVATIONS AREAPPI\O)(IW.TE
ANO WERE SURVEYED BY A REPRESENTATIVE
OF OUR FIRIII RI! Fl!Rl!NCING THE TEMP'OAARY 6ENCHfAARK SHOWN ON FIG. 1.
3. WC - INDICATE$ MQISTVRE (;QNnNT (¾), 00 - INDICATES ORY DENSITY (pcf)_
- 2()() - INDICATES PASSING NO. 200 SIEVE(%).
4. THES£ LOGS ARE SUBJECT lO lHE EXPLAIIIA"TIONS, l llAITATIONS ANO
()QNCLUSIONS AS CONTAINED IN THIS
R~l'>OR'I'.
APPROXIMAl E LOCATION OF
EXPLORATORY BORING
lEMPORARY BEN CH~lARK:
' EGEND:
llt-1
1BM
$ l OP OF SOUTHEAST BRIDGE ABVTMENT
(ASSUUED ELEV.-100.0 ')
Sub Sheet: ~ Submittal :
C3 PS&E
Sheet
HOR En ineerin . Inc. S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-304 A ~""'===~ 5 OF 19 .I.
(t BEARING ABUT 1
STA. 11 +58.87
N= 1346236.0083 E=2778436.2138
N= 1 346246.4 11 6 E=2778450.4730
17'-1 1/8"
(lYP.)
10'-0 7/8"
(lYP.)
7'-o 1/4"
(lYP.)
** N=1346199.7427
E=2778446.2821
**N=1346233.9628
E=2778462.1830
N
N= 1346227 .6962
E=277841 B.9541
* TO CENTER OF@BAR
(DIMENSIONS ARE OPPOSITE
HAND AT ABUT. 2)
** PROVIDE 1" CHAMFER
AT CORNERS SHOWN
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION
PLAN
Forest
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
Design:
Drawn:
Checked :
Date:
HOR
#4x16'-8"
T&B (TYP.)
N= 1346206.0093
It_ BEARING ABUT 2
STA. 12+11.47
N=1346197.6972 E=2778472.2513
N= 1346187.2939
E=2778457.9921
ELEV. (ABUT. 1) 9550.78
ELEV. (ABUT. 2) 9550.78
LAS Sheet Title:
LLF
JAR
NOTES:
1. ''T & 8" INDICATES BARS ON TOP & BOTTOM MATS.
2. WORK THIS SHEET WITH SHEETS 7 AND 8.
3. ALL REINFORCING IN THE FOOTING SHALL BE BLACK BARS.
4. THE TWO FRONT FACE (c) BARS AT EACH END OF ABUTMENT FOLLOW THE FACE OF WINGWALL.
**N=l 346193.5605
E=2778501.2210
REBAR LAYOUT NOTES:
145' •
19';--Y._60~0
' <O I
N
@ BAR PAIRS ARE #6 BARS AS FOLLOWS: •:__~",
@ BAR PAIRS ARE #4 BARS AS FOLLOWS:
© BARS ARE NB BARS ... I¾>
AS FOLLOWS: _jco
160•~ •• n,.14½, I<':--..!. OU~ ,,'b 's~ .. 1'"
1'-6"
@) BARS ARE #4 BARS AS FOLLOWS:
(PERPENDICULAR TO 8.F. ABUT.)
~n
1'- 6" ·-~n ® BARS ARE #4 BARS AS FOLLOWS: .
. 1'-1 " --~n ® BARS ARE #4 BARS AS FOLLOWS: .
@ BARS ARE #5 BARS AS FOLLOWS:
@ BARS ARE #5 BARS AS FOLLOWS:
~ LONG LEG
18,_
.. "':, IN WINGWALL
~ LONG LEG
l l '-o" 'J IN WINGWALL
.t. TRIM TOP IN FIELD
AS REQUIRED
(t BEARING
#4 BARS
PARALLEL TO
~ BEARING
7" - 0"
' 1(1'. ,,., ...I u.
8.F. ABUT.
#8 BARS
PERPENDICULAR
TO (t BEARING
1'- 3 " 1'-0 "
(15) #4 BARS @ EQ. SPA. (T1 & 8)
14'- o"
SECTION A-A
(FOOTING TYPICAL SECTION)
ALL DIMENSIONS ARE PERPENDICULAR TO (t BEARING
F.F. ABUT.
1 1/2" DEEP
X 3 1/2"
SHEAR KEY
CONSTRUCTION JOINT
FOOTING LAYOUT
AND DETAILS
Sub Sheet: Submittal:
S1
PS&E
Sheet
Inc. S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04 6 OF 19 z ii:
< w
ID
N ~ BRIDGE
~ ROAD
19'-3~, ' 1------------------\-----1-
BEARING PAD
(TYP.) (G3)
@ BAR\
'f!'AIRS , NOTES: 1. WORK THIS SHEET WITH SHEETS 6 & 8.
2 . JOINT MATERIAL SHALL BE PLACED CONTINUOUSLY ALONG THE SIDES OF THE END DIAPHRAGM AS SHOWN IN THE ABUTMENT PLAN
AND ELEVATION.
3 . THE PAYMENT MADE FOR ITEM 55204 SHALL INCLUDE THE COST FOR ALL WEEPHOLE MATERIALS, LABOR AND INCIDENTALS
INCLUDING PVC SLEEVE, GEOTEXTILE, DRAIN BOARD AND ANIMAL GUARDS.
4 . "E.F." INDICATES "EACH FACE", "B.F." INDICATES "BACK FACE", AND "F.F." INDICATES "FRONT FACE".
5 . ATTACH AN ANIMAL GUARD AT EACH WEEPHOLE. THE ANIMAL GUARD SHALL BE GALVANIZED 17 GAGE WIRE MESH WITH 1 /2" X 1/2" OPENINGS AND SHALL BE CENTERED ON THE WEEPHOLE. WRAP THE ANIMAL GUARD AROUND THE END 4" OF THE WEEPHOLE. SECURE THE GUARD FLUSH WITH THE SIDES OF THE WEEPHOLE AND HAVE THE INSTALLATION APPROVED BY THE CO.
6. ALL REINFORCING IN THE ABUTMENTS AND WINGWALLS IS BLACK (NON-EPOXY COATED) .
7 . REFER TO SPECIAL CONTRACT REQUIREMENTS 555 AND 564 FOR BEARING PAYMENT INFORMATION.
,, • B. REFER TO SHEET 12 FOR BEARING MATERIAL INFORMATION.
'o, 9 . COLOR STAIN SHALL BE APPLIED TO 1-FOOT BELOW THE FINISHED GRADE. REFER TO SPECIAL CONTRACT REQU IREMENTS FOR DETAILS.
X 12' -0"
BARS
CE WITH
s
2 '-1 /2" 8 3/8" B 3/ 8" 1'-5 1/ B"
~ - - - @-BA- RS- - -- 1;:.~:--=~~~~1==:=:c:.::~ :::b~~J=~t;:1!:~=,b~~~~~Q~=l=:£1 'sf:iACE WITH @ BARS
PROPOSED
GROUND LINE
(SEE NOTE 9 .)
SEE DETAIL A
OPTIONAL
CONSTRUCTION
JOINT (TYP.)
#6x19 ' -11" SPA.@
12" BETWEEN @BARS
(11) BARS F.F. Qf ABUT.
's°'PACED WITH @ BARS
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION
17'-6 7 B" 16'-2 1 2"
ABUTMENT 1 PLAN
~ BRIDGE
~ ROAD
SEAT ELEV. 9559 .89
(LEVEL)
I INSTALL 1 /2" JOINT MATERIAL
ALONG EDGE OF WINGWALL
(SEE NOTE 2)
~ 3" !ii WEEPHOLE SEAT ELEV. 9559.36
(LEVEL)
#4 TIE (TYP.)
@ 1 '-6" MAX
12'-0" (lYP.)
SEAT ELEV. 9559 .71
(LEVEL)
SEAT ELEV.=:\
(LEVEL) \
ABUTMENT 1 ELEVATION
(LOOKING BACK STATION)
Forest
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
Design:
Drawn :
Checked:
Date:
HOR
LAS
JAR
NOV 2015
(6) #4 BARS
(LENGTH VARIES)
ELEV. 9553.28
#6x12'-o" SPA. @
12" BETWEEN@BARS
@ BARS F.F. OF ABUT./
tF. OF WINGWALL
BARS B.F. OF ABUT./
.F. OF WINGWALL
Sheet Title:
PROVIDE
DETAIL
@) B
A @BAR (TYP.)
3" SCH 40
PVC WEEPHOLE
~ BEARING
1'-0" 1· 3 •
BARS
OVE
BEAM SEAT
) #4 BARS
ENGTH VARIES)
2 BAR
BAR (TYP.)
1 BAR
DETAIL B
CIP CONCRETE
END DIAPHRAGM
(SEE SHEET 11)
LOW DENSITY POLYSTYRENE
GEOCOMPOSITE DRAIN (2'-0" WIDTH)
(TYP.) (SEE NOTE 3)
2'-0" WIDE
GEOTEXTILE
_l TYPE I-A (TYP .)
SEE NOTE 3
/ FOOTING
ABUTMENT 1 & 2 TYPICAL SECTION
(NOT TO SCALE)
Sub Sheet : Submittal :
ABUTMENT DETAILS
S2
PS&E
S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-4.04 7 OF 19
N
PROPOSED
GROUND LINE
(SEE NOTE 5)
#6x19'-11" SPA.@
12" BETWEEN@ BARS
i BRIDGE i ROAD
"' 19' -3"'
FOOTING \,
19' - 3"
10 1 2 "
BELOW~ '\
..... 6 ", '... BEARING PAD @ \
(TYP.) _-\
BEARING
STA. 12+ 11.47 @
@ BAR PAIRS -\,
OPTIONAL
CONSTRUCTION
JOINT (TYP .)
(11) BARS F.F. ,Qf ASUT.
SPACED WITH @) BARS
I I , I
.@ BAR PAIRS ,
5' - 4"
SLOPE
8 3 8 , 17'-6 7 8 " 16' - 2 1 2"
ABUTMENT 2 PLAN
SEAT ELEV. 9559.36
(LEVEL)
~ 3" II) WEEPHOLE
I 12'-0" (TYP.)
SEAT ELEV. 9559 .53
(LEVEL) 7
#4 TIE fTYP.)
@ 1' - 6'1 MAX.
~ BRIDGE
~ ROAD
I
INSTALL 1 /2" JOINT MATERIAL
ALONG EDGE OF WINGWALL
(SEE NOTE 2 ON SHEET 7)
SEAT ELEV. 9559.71
(LEVEL)
ABUTMENT 2 ELEVATION
(LOOKING AHEAD STATION)
#6x12' -0" SP~@ 1 2" BETWEEN (tJ BARS
NOTES:
1. WORK THIS SHEET WITH SHEETS 6 & 7.
2 . ALL REINFORCING IN THE ABUTMENTS &
WINGWALLS IS BLACK (NON-EPOXY COATED).
3. E.F. INDICATES BARS ON EACH FACE.
4 . FOR BEARING INFORMATION SEE
SHEET 12.
5. COLOR STAIN SHALL BE APPLIED TO 1 -FOOT BELOW
THE FINISHED GRADE. REFER TO SPECIAL CONTRACT
REQUIREMENTS FOR DETAILS.
©) BARS E.F.
I I
I I I
I I I
" I I r\ I ' -:
I ' :
(U) BARS (3) 7
I I 1;;
I
II
I Ii
I I
I r x8 -
I/ - ~ t
I ----1:l -
I-
I I-a::
0 z
I V) w 3:
I I
VJ
I
(]l
I
-fl)l_ 7_(4) #4 @AND@BARS
@BARS #6
I Pl f4 @ , • -0" E.F. 1 ~ ~ OPnDNAL CONSTRUCTION JOINT
LENGTH VARIES CLR.
LJ2l BARS F.F. ,Qf ABUT.
SPACED WITH @) BARS
F.F. WINGWALL
I
<O I
I-
VJ
i:5 I I-
VJ
N
I
~ I
CLR.
@ BARS E.F. ~
I I
(12) (/_4 @ 1'-0 " E.F.
LENGTH VARIES
B.F. WINGWALL • TRIM IN FIELD
AS REQUIRED
r #4 15' 5"• X -
~@ BARS (3)
I
I I I I
I I \ @AND@B
I I J
ARS
L
I ' ' \ \ I
I \ I ' \ I I
' \ 11 ' I
11 I\ I \ \ \ j
I ' I \ \ ' I
I \. I \ I ' \
I (6) #4 ~ j ~ I /6 @BARS
\__ OPTIONAL CONSTRUCTION JOINT
(3) #4 BAiS ~ WINGWALL ELEVATIONS E.F. @ 1'-0" = 2·- 0 ·
ELEV. 9553.28
BARS F.F. OF ABUT./
F. OF WINGWALL
BARS B.F. OF ABUT./
F. OF WINGWALL
<Id ~ ~ r-cri u: ti iQ iQ ~
<< VJ
III III W
<III~
2" CLR.
(1YP.}
VJ w
I
#6 BAR
(1YP.)
(i)BAR
'-{TYP.)
WINGWALL
TYPICAL SECTION
REBAR LAYOUT NOTES
(8} BARS
@BARS
1 ' - 5 " 6/ ·1 I "
2'-0" ABUT. 1 T ~ -,· ,i~ { I 2'-6" ABUT. 2-i ____________:__2 ~
' I " r,.S\)~ - i 2 '- 9 " :... ,~-~ T 2'-0" ABUT. 1 + \ '- _[""2 '-6" ABUT. 2
. I
(G) BARS #4 TIE BARS
· 1· - 11·
S-1 'J · 45· / / y ~
U.S. DEPARTMENT OF AGRICULTURE 19' Forest
SOUTH COTTONWOOD CREEK
Design: ~LA= S ___ _ Sheet Title:
ABUTMENT DETAILS
Sub Sheet: Submittal :
PS&E FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION
PIKE-SAN ISABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
Drown:
Checked: .... J..,,A..,_R _ _ _ _
NOV 2015
, Inc. S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04 S3 Sheet
~BEARING
ABUT NO. 1
20'-o"
52'-7f
20'-Q" i tR NUMBER - - - - - - - - - 7"--1 1'--14-,: =-~1'-r-/--+----------C-1~-,,..... __ f_i¢_~_)_RA_G_M-------r---+---~-:_:_.;-+t-/
0 Ol / /
:, co § /\ 55' (TYP.) ~
I
~BEARING
/ '8UT NO. 2 NOTES
1. CONNECTION PLATE (C1) SHALL BE AT INTERMEDIATE DIAPHRAGM LOCATIONS.
2. DIMENSIONS SHOWN ARE PLAN DIMENSIONS.
3. WORK THIS SHEET WITH SHEET 10.
4. RETAINER BARS SHALL BE ATTACHED TO THE BOTTOM FLANGE OF THE GIRDER
AT THE ABUTMENT BEARING LOCATIONS AS SHOWN ON SHEET 12.
5. AFTER ALL FABRICATION OPERATIONS HAVE BEEN COMPLETED, ALL GIRDERS
SHALL BE CLEANED IN ACCORDANCE WITH STEEL STRUCTURES PAINTING
COUNCIL SURFACE PREPARATION SPECIFICATION NO. 6 COMMERCIAL BLAST
CLEANING (SSPC-SP6). (NO PAINTING IS REQUIRED).
c§ I o o / i_ --~-8
-: - -- - 7 :'f ',1~ Cl / ~- --- ---CJ 1 __ c
__ - -- - ' ct ~~9r,:
tj- I ~ ~ STEEL DIAPHRAGMS
~- _____ s1A{s1 / I c1 c1 I / c1 I s11, s1 NOT REQUIRED 'W J 01 I Cl /\ Cl Cl /\ / T 81 AT ABUTNeNTS
' Ol
SHEAR
CONNECTOR 5"
SPACING
(2 PER ROW)
I 0 0
I
CX) I
_ 81~ A I C1
81;11 .I. I ,·-41·
0 0 VBEARI~ :; STIFFENER 81 (TYP.)
0 0
0 0 n
I~ u
, r 7 (TYP.) 2 -1
~ I VARIES
END OF_/
GIRDER I
~ BEARING
ABUT NO. 1
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
R-2
ROCKY MOUNTAIN REGION
20·-o"
20'-o"
I cq ;( C1 I 81111, . i f' 20'-o I J-~-
52'-7f ~
FRAMING PLAN
W30 132 GIRDER X
56 SPA. @ 12" = 56' -0"
/ CONNECTION PLATE C1 (TYP.)
52'-7f
56'-1or
GIRDER ELEVATION
(NOT TO SCALE)
ForeS t
SOUTH COTTONWOOD CREEK
PIKE-SAN !SABEL NATIONAL FOREST
SALIDA RANGER DISTRICT
Design:
Drawn:
Checked:
Date:
HOR
DRIP BARS (TYP.)
E GIRDER END DETAIL
EET 10.
(SHOWN AT ~ GIRDER) -
i\ra
"~J;
( 00
20'-0"
LAS
LLF
JAR
NOV 2015
Engineering, Inc.
u I. 5'-o"
(TYP.)
VARIES
Sheet Title:
I I
I 2·-1r - I I
~BEARING
ABUT NO. 2
END OF
GIRDER
GIRDER DETAILS
S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04
Sub Sheet: Submittal:
S4
PS&E
t GIRDER 1 t GIRDER 2 t GIRDER .3 t GIRDER 4 w
~1 --- -~8~'-~9"- ---~1----~8~•-~9•- - - -~1- --- ----=-8·~-9~•---------11 S~ I I I I t;; 0
I I I WEATHERING STEEL POST ~ l5
' ' t BRIDGE AND W-BEAM (TYP.)
I 2% I I I
DRIP BAR
(TYP.)
I
SYM. ABOUT
~ GIRDER WEB
NOTES
1. SEE SHEET 2 FOR MATERIAL REQUIREMENTS.
2. THE DISTANCE FROM THE CENTER OF THE BOLT HOLES TO PLATE EDGES SHALL BE 1 1/2" UNLESS
NOTED OTHERWISE.
1 1/2" x 1 1/2" .3 . BOLT HOLES IN THE DIAPHRAGM CONNECTION PLATES FOR THE CONNECTION TO THE DIAPHRAGMS
CUP {TYP.) SHALL BE OVERSIZED. (1 1/16")
4. DECK CROSS SLOPE SHOWN IS NORMAL TO t OF ROADWAY.
5. FOR SECTION THROUGH ABUTMENT DIAPHRAGM SEE SHEET 11.
6. WORK THIS SHEET WITH SHEET 9.
7. FINAL ELEV. INDICATES FINAL DECK ELEVATION AFTER DECK HAS SETTLED IN
FINAL POSITION (BASED ON PROFILE GRADE LINE DATA). ~·~~-----+.J~~-=====-=====-=====ii!m=T::-::::=:=====-==~ :rnt 0 €, (.3)
90" (TYP.) 4• (TYP.) 6 .3/16"
, (TYP.) SECTION E-E
8 . REMAINING CAMBER SHOWN IN THIS TABLE IS THAT PORTION OF TOTAL CAMBER (SHOWN IN GIRDER CAMBER DIAGRAM) REMAINING AFTER GIRDERS ARE ERECTED AND DIAPHRAGMS AND DECK FORMS ARE INSTALLED.
~ ~ ! BOLTS, (TYP.)
": I~ ~~1/2" ~ r:- BENT PLATE
I
{TYP.) ~ €, DIAPHRAGM (TYP.)
EDGE OF CONNECTION PLATE
i HOLES
CONNECTION PLATE/
BEARING STIFFENER (TYP.)
DIAPHRAGM DETAILS
BENT If.
1/2"x8'-4 .3/8"
CONNECTION PLATE
1 1 1 / 'l' TO END OF DIAPHRAGM 7 (lYP.) 1/2"x2" DRIP
BARS TOP OF
BOTTOM FLANGE
(TYP.)
£ HOLES
E7
ABUT.
DRIP BAR DETAILS
OMIT CONNECTION PLATE
ON EXTERIOR SIDE OF
EXTERIOR GIRDERS
_j
DIAPHRAGM
SECTION
7 1 , ,. ~ (lYPJI I I
TYP. >-'1 /_4--+-r-' TOP & BOT l/4
1/ 4
1/4
PLAN TYP.
(TOP ONLY)
fl 5/~ X 5"
1/ 4
1/4
FINISH TO BEAR
{TIGHT FIT)
{NO WELDING)
fl 5/8" X 5" t HOLES CONNECTION PLATE (C1)
SEE SHEET 9 FOR LOCATION
BEARING STIFFENER (81)
SEE SHEET 9 FOR LOCATION
CONNECTION PLATE /
BEARING STIFFENER DETAILS
I £ HOLES
uLLl CTYPT"i1' ~ f
PLATE
NO WELD 1/4" FROM
EDGE OF PLATES
WELDING DETAIL
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
1 1/2" • 2 1/4" 0
HOLE FOR DIAPHRAGM
REINFORCING (TYP.)
I (TYP.~ : I
ll BEARING
GIRDER END
Forest
1 1/2" 0 HOLE
FOR DIAPHRAGM
'N REINFORCING {TYP.)
_;l
.3 SPA. 0 7 1/2"
(TYP.)
DETAIL
SOUTH COTTONWOOD CREEK
PIKE-SAN ISABEL NATIONAL FOREST
£ GIRDER
DECK ELEVATION DETAIL
Design: --=LA"-'S=------
Drawn: --=LL=F'------ Checked: ---"J'-'AR'-'----- -
Date: NOV 2015
Sheet Title:
9. ELEV. M IS REQUIRED SCREED ELEVATION.
10. ELEV. N SHALL BE SURVEYED IN THE FIELD
11. USE DIMENSION "h" TO SET ELEVATION OF DECK FORMS. (2" MAX.)
SCREED AND DECK ELEVATION TABLE
(SEE NOTES 7 -11 )
i Brg i Brg
Location 0 0.25 0.50 0.75 1.00
Final Elev 9562.96 9562.96 9562.96 9562.96 9562.96
( + l Remoinina Cambero 0 0.11 0.15 0.11 0
(=l Elev M 9562.96 9563.07 9563.11 9563.07 9562.96
IE, GIRDER 1 (-l Elev N
C•l d
(-) 0.667
(•) h
Final Elev 9563.13 9563.13 9563.13 9563.13 9563.13
( + l Remainina Camber, 0 0.11 0.15 0.11 0
C•l Elev M 9563.13 9563.24 9563.28 9563.24 9563.13 ft GIRDER 2 (-1 Elev N
(=) d
(-) 0.667
(=) h
Final El•• 9583.31 9563.31 9563.31 9563.31 9563.31
C+l Rernorioa ComheP 0 0.11 0.15 0.11 0
C• l Elev M 9563.Jl 9563.42 9563.46 9563.42 9563.31
IE, GIRDER .3 (-) Elev N
(•l d
(-) 0.667
~ (=) h
,-, l Final Elev 9563.48 9563.48 9563.48 9553.48 9563.48
( + l Romoirina Camber> 0 0.11 0.15 0.11 0
(• ) Elev M 9563.48 9563.59 9563.63 9563.59 9563.48
~ IE, GIRDER 4 (-}Elev~
" (=) d
(-) 0.667
(=) h
WEST EDGE OF DECK Final Elev 9563.54 9563.54 9563.54 9563.54 9563.54
(• ) Ela, M 9563.54 9563.65 9563.69 9563.65 9563.54
EAST EDGE OF DECK Final El•• 9562.91 9562.91 9562.91 9562.91 9562.91
(=) Elev M 9562.91 9563.02 9563.06 9563.02 9562.91
• SEE NOTE 8
t BRG. ABUT. NO. t BRG. ABUT. NO. 2
I I I I
I I I I a _____
4 EQUAL SPACES = 52'-7 1/8"
GIRDER CAMBER DIAGRAM
Sub Sheet: IJ' Submittal :
GIRDER DETAILS S5
PS&E
Sheet I R-2 ROCKY MOUNTAIN REGION SALIDA RANGER DISTRICT HlR Engileemg, Inc. S. COTTONWOOD CREEK BRIDGE REPLACEMENT #344-3.04 10 OF
~ I
A undefined:
File details come from the government source that posted it. Updated .