This is a Contractor Warranty Letter issued by the Clay County Board of County Commissioners for the Construction of Radar Road project (IFB #25/26-010) in Florida. The warranty document outlines the contractor's obligation to guarantee all labor, materials, and work performed on the project are compliant with contract documents and authorized modifications. A mandatory pre-bid meeting is scheduled for October 29, 2025, at the Clay County Administration Building, with bids due on November 20, 2025, at 4:00 pm and bid opening on November 21, 2025. The project encompasses the construction of approximately 1,950 linear feet of roadway connecting Town Center Boulevard to US Highway 17, including clearing and grubbing, earthwork, traffic control, paving, storm drainage, utility adjustments, landscaping, irrigation, signage, and pavement markings. The substantial completion timeline is 345 days from the Notice to Proceed, with final completion required 30 calendar days after delivery of the punch list.

The warranty period extends for two years from the Date of Completion and acceptance by the Clay County Board of County Commissioners, during which the contractor agrees to remedy all defects resulting from improper materials, workmanship, or arrangement at its sole expense and respond to warranty calls within twenty-four hours of notification. Bidders must be pre-qualified with the Florida Department of Transportation (FDOT) in specific fields including flexible pavement, drainage, grading, sidewalk, pavement marking, roadway signage, and underground utilities. Contractors must submit a 5% bid bond, maintain proof of insurance and workers' compensation coverage, self-perform at least 40% of the work, and have been in business for a minimum of 5 years performing similar work. The warranty does not apply to work that has been abused or neglected by the owner, damage caused by Acts of God, or normal wear and tear, and does not preclude or replace additional warranties required by the Contract Documents.

View the file

Other files

File Type Posted
Construction_of_Radar_Road_(Addendum_#4_Revision).pdf PDF
Construction_of_Radar_Road_(Addendum_#4_Revision).pdf PDF
Addendum_#3_-_Radar_Road_-_22-358_Revision_2_Combined.pdf PDF
Addendum_#3_-_Radar_Road_-_22-358_Revision_2_Combined.pdf PDF
Addendum_#2_-_Radar_Road_-_22-358_Revision_1_Combined.pdf PDF
Addendum_#2_-_Radar_Road_-_22-358_Revision_1_Combined.pdf PDF
Addendum_#1_-_MAE_Report-Radar_Road_Improvements.pdf PDF
Addendum_#1_-_Radar_Rd_Improvements_Lighting_Plans_S&S.pdf PDF
Addendum_#1_-_MAE_Report-Radar_Road_Improvements-prm.pdf PDF
Addendum_#1_-_MAE_Report-Radar_Road_Improvements.pdf PDF
Addendum_#1_-_MAE_Report-Radar_Road_Improvements-Strain_Poles-digi.pdf PDF
Addendum_#1_-_MAE_Report-Radar_Road_Improvements-prm.pdf PDF
Addendum_#1_-_MAE_Report-Radar_Road_Improvements-Strain_Poles-digi.pdf PDF
Addendum_#1_-_Radar_Rd_Improvements_Lighting_Plans_S&S.pdf PDF
Construction_of_Radar_Road.pdf PDF
Approved_Permit_Package_-_FDOT_Access.pdf PDF
SJRWMD_Permit.pdf PDF
Road_Road_-_Signed_and_Sealed_Plans.pdf PDF
Road_Road_-_Signed_and_Sealed_Plans.pdf PDF
Approved_Permit_Package_-_FDOT_Drainage.pdf PDF
Approved_Permit_Package_-_FDOT_Access.pdf PDF
Approved_Permit_Package_-_FDOT_Drainage.pdf PDF
SJRWMD_Permit.pdf PDF
Approved_Permit_Package_-_FDOT_Access.pdf PDF
Road_Road_-_Signed_and_Sealed_Plans.pdf PDF
Approved_Permit_Package_-_FDOT_Drainage.pdf PDF
SJRWMD_Permit.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
W-9_(2024).pdf PDF
Warranty_Letter_.pdf PDF
Certificate_of_final_payment.pdf PDF
Certificate_of_final_payment.pdf PDF
Certificate_of_final_payment.pdf PDF
EFT_FORM.pdf PDF
Owner_Direct_Purchase_Program.pdf PDF
Warranty_Letter_.pdf PDF
Chapter_8_Section_I.pdf PDF
EFT_FORM.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
Certificate_of_partial_payment.pdf PDF
Chapter_8_Section_I.pdf PDF
EFT_FORM.pdf PDF
Owner_Direct_Purchase_Program.pdf PDF
Certificate_of_partial_payment.pdf PDF
Performance_&_Paymt_Bond.doc DOC document
W-9_(2024).pdf PDF
Certificate_of_partial_payment.pdf PDF
Chapter_8_Section_I.pdf PDF
Owner_Direct_Purchase_Program.pdf PDF
W-9_(2024).pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLAY COUNTY BOARD OF COUNTY COMMISSIONERS

CONTRACTOR WARRANTY

Contractor’s Name:

Address:

Project:

Contract Number:

Contractor’s License Number:

The undersigned warrants all labor and materials furnished and work performed in conjunction with the above referenced project are in accordance with the Contract Documents and authorized modifications thereto, and will be free from defects due to defective materials or workmanship for a period of two years from the Date of Completion and acceptance of all improvements by the Clay County Board of County Commissioners.

Should any defect(s) develop during the two (2) year warranty period due to improper materials, workmanship or arrangement, the undersigned agrees to remedy all defects at its sole expense.

Further, the undersigned agrees to respond to any and all warranty calls from the Owner within twenty-four (24) hours after notification.

Nothing above shall be deemed to apply to work that has been abused or neglected by the owner, to damage caused by Acts of God or to normal wear and tear. This does not preclude or replace additional warranties that may be required by the Contract Documents.

Contractor’s Signature

Printed Name

Date

File details come from the government source that posted it. Updated .