wa-a2015024_plans.pdf
PDF 11 MB Posted
- Solicitation number
- 69056720B000009
About this file
This document package includes plans and specifications for a federal transportation project. The project involves public access enhancements to the Willapa National Wildlife Refuge, including roadway construction and repairs, drainage improvements, signage, fencing, gates, and other site works. Estimated quantities and unit pricing are provided for numerous bid items. The solicitation is open and competitive with no set-asides, being issued by the Federal Highway Administration on behalf of the Department of Transportation. The improvements aim to improve accessibility and safety at the refuge while minimizing environmental impacts.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
:3
P
M
M a r c h
IN
D E
X T
O S
H E
E T
S c p w w o r k \d
\w a a a b .d g n
INDEX TO SHEETS
STATE PROJECT
NUMBER
SHEET
WA PACIFIC 2015(1) A.2
WA PACIFIC 2015(1) A.
Sheet and Description
Section C Section D Section E Section G Section I Section J
Typical Sections Plan & Profile Parking Areas Erosion Control Temporary
Traffic Control Permanent
Traffic Control Allowance Bid Schedule
A0001 15101-0000 MOBILIZATION LPSM ALL
A0006 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0011 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0016 15401-0000 CONTRACTOR TESTING LPSM ALL
A0021 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0026 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 200 200
A0031 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 6,255 6,255
A0036 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 30 2 32
A0041 20301-1100 REMOVAL OF GATE EACH 1 1
A0046 20301-1900 REMOVAL OF PIPE CULVERT EACH 2 2
A0051 20301-2700 REMOVAL OF STRUCTURE (KIOSK) EACH 1 1
A0056 20301-2700 REMOVAL OF STRUCTURE (IRON RANGER) EACH 1 1
A0061 20301-3400 REMOVAL OF WHEELSTOP EACH 13 13
A0066 20302-0700 REMOVAL OF FENCE LNFT 1,620 35 1,655
A0071 20303-0300 REMOVAL OF CONCRETE SQYD 90 90
A0076 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 970 50 1,020
A0081 20401-0000 ROADWAY EXCAVATION CUYD 2,312 238 2,550
A0086 20402-0000 SUBEXCAVATION CUYD 3,275 300 3,575
A0091 20410-0000 SELECT BORROW CUYD 2,870 230 3,100
A0096 20701-0500 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE E SQYD 4,400 200 4,600
A0101 20703-2000 GEOGRID, STABILIZATION SQYD 6,005 300 6,305
A0106 25120-0200 RIPRAP DITCH, METHOD A, CLASS 2 LNFT 535 10 545
A0111 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 7,622 398 8,020
A0116 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1,179 60 1,239
A0121 41201-0000 TACK COAT TON 6 6
A0126 60201-0400 12-INCH PIPE CULVERT (PVC, SMOOTH WALL) LNFT 162 10 172
A0131 60915-1000 WHEELSTOP, CONCRETE EACH 17 17
A0136 61501-0200 SIDEWALK, COLORED CONCRETE (STAMPED) SQYD 565 20 585
A0141 61901-0000 FENCE LNFT 1,400 25 1,425
A0146 61902-0000 GATE (AUTOMATED) EACH 1 1
A0151 61920-2000 REMOVE AND RESET GATE EACH 2 2
A0156 62101-0000 MONUMENT EACH 1 1
A0161 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
30-INCH WIDTH HOUR 30 30
A0166 62201-3000 HYDRAULIC EXCAVATOR HOUR 30 30
A0171 62301-0000 GENERAL LABOR HOUR 10 10
A0176 62501-0000 TURF ESTABLISHMENT ACRE 1.0 1.0
A0181 63302-0000 SIGN SYSTEM SQFT 20 20
A0186 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (White) LNFT 10,670 10,670
A0191 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 2 2
MileStone: 100% Date Completed: In Progress Report Date: 03/02/20
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-M ar
-2
4:
P
M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0 su m m ar y.
xl sm
]S he et
STATE PROJECT
B.1PACIFIC 2015(1)WA
NUMBER
Sheet and Description
Section C Section D Section E Section G Section I Section J
Typical Sections Plan & Profile Parking Areas Erosion Control Temporary
Traffic Control Permanent
Traffic Control Allowance Bid Schedule
A0196 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL EACH 4 4
A0201 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
A0206 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 43 10 53
A0211 63622-0000 UTILITY TRENCH LNFT 81 10 91
A0216 64630-0000 ROADSIDE DEVELOPMENT (BARK CHIP PATH) LPSM All ALL
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number c:
\p w -w or k\ d0 su m m ar y.
xl sm
]S he et
2)
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
-M ar -2
4:
P M
MileStone: 100% Date Completed: In Progress Report Date: 03/02/20
STATE PROJECT
B.2PACIFIC 2015(1)WA
NUMBER
:3
M a r c h
T
A B
U L
A T
IO
N
O F
P L
A N
A N
D P
R O
F
IL
E Q
U A
N T
IT
IE
S p w w o r k \d
\w a a d a .d g n
PROFILE QUANTITIES
TABULATION OF PLAN AND
STATE PROJECT
NUMBER
WA PACIFIC 2015(1) D.1
POINT
NUMBER NORTH EAST ELEVATION DESCRIPTION
1 389654.557 743004.121 19.689 CP
2 388606.601 743067.030 19.787 CP
3 383744.013 742689.601 21.347 CP
4 382557.967 742610.176 21.937 CP
52 394261.591 757689.780 9.844 REBAR & CAP
53 393749.810 756059.498 60.465 REBAR & CAP
5042 393689.171 757283.287 10.783 REBAR & CAP
5111 393123.545 756954.773 51.977 CP
5173 394914.001 758658.926 10.267 5/8" IR W/YPC
5305 394821.666 757962.468 9.086 REBAR & CAP
PROJECT : 67th street refuge access DATE OF FIELD WORK :Multiple Entries
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Assumed (scaled to project datum) VERTICAL DATUM : Based on NAVD88 GEOID12b
PROJECT COORDINATES
D
Pr oj ec ts
\W as hi ng to n\
W ill ap a_
N W
R\ S ca le d_
C on tr ol
W
A _P ac ifi c_
_s ca le d.
xl sx ]S he et
-J an -2
8:
A M
Pa ci fic C ou nt y an d
PA
X
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.8
SHEET
NUMBER
PACIFIC 2015(1)WA
SURVEY CONTROL
10.4 x 16 25120 -0200
60201 -0400
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C
A V A
TI
O N
R
IP
R A P
D
IT
C H
M
ET
H
O D
A
C
LA
S S
-I
N C H
P
IP
E C
U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD LNFT LNFT Lt Rt 40+16 1 13 58 76 P 46+00 1 10 44 58 P Located on approach road t 50+24 1 13 60 90 P
40+00 to 45+00 500
PROJECT TOTAL 36 500 162
Allowable Pipe Material A Aluminum AS Aluminized steel C Concrete GS Galvanized steel P Plastic (blank) Any appropriate material
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
C
M yF ile s\
Pr oj ec ts
\2
7\ W ill ap a\
0%
D ra in ag e.
xl sx ]S he et
-F eb -2
9:
A M
K S m it h
1/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.1
SHEET
NUMBER
PACIFIC 2015(1)WA
Note: The quantities shown hereon are approximate and are subject to field adjustments.
WA PACIFIC 2015(1) F.2
WA PACIFIC 2015(1) F.3
WA PACIFIC 2015(1) G.9
NO SCALE
5. Power coated: Cardinal Rust Texture T091-BR47 for both gates arms.
4. Only one gate arm panel is shown. Design to be replicated
(verify with width of gate opening).
3.Attach with angle brackets welded to the back of the panel
'' aluminum without aluminum perforated plate.4 plate or
" aluminum perforated 8 aluminum attached to " 8
2.Cut from
1.Verify dimensions with approved shop plans for gate.
NOTE:
42.75" 44.5" 42.75"
.8
.0
.9
.0
.9
.1
:5
M a r c h
A
U T
O M
A T
IC
G
A T
E P
A T
T E
R N p w w o r k \d
\w a a f d d g n .d g n
AUTOMATIC GATE PATTERN
STATE PROJECT
NUMBER
WA PACIFIC 2015(1) H.4
WA PACIFIC 2015(1) .
WA PACIFIC 2015(1) .
File details come from the government source that posted it. Updated .