This amendment modifies a solicitation for public works construction services for the WA PACIFIC 2015(1) project to enhance public access at the Willapa National Wildlife Refuge. Key revisions include adding a new lump sum line item for payment of wetland credit fees to Pacific County in the amount of $22,474.32, revising bid schedule and summary of quantity sheets to reflect this, and adding a new contract section specifying the wetland credit payment requirements. The solicitation is issued by the Federal Highway Administration for construction work that includes roadway excavation, paving, fencing, signs, and erosion control. The response due date is not specified.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 05/14/2020 N/A See Block 10
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056720B000009
9B. DATED (SEE ITEM 11)
04/24/2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA PACIFIC 2015(1), Public Access Enhancement to Willapa National Wildlife Refuge
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A002, dated 05-14-2020 WA PACIFIC 2015(1) Solicitation No. 69056720B000009 Public Access Enhancement to Willapa National Wildlife Refuge
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Pages A-7 through A-11. Revises all bid schedule pages to add Pay Item No. 67001-0000 Project Lump Sum (Wetland Credit).
CONTRACT CLAUSES
CONTRACT CLAUSES
Page C-77. Revises FAR Clauses 52.2236-4, Physical Data (Apr 1984).
SPECIAL CONTRACT REQUIREMENTS
Page iv, SCR Table of Contents. Adds Section 670 to Table of Contents.
Page F-20, Section 670, Pacific County Wetland Credit Fee (Added Section). Adds Section.
PLANS
Plan Sheets B.1 through B.2 Revises Summary of Quantity Sheets to add Pay Item No.
67001-0000 Project Lump Sum (Wetland Credit).
ENCLOSURES
Pages:
A-7 through A-11 C-77 iv F-20
Plan Sheets:
B.1 through B.2
Notice to Bidders: Please submit revised pages A-7 through A-11 with your bid.
C - 77
Contract Clauses WA PACIFIC 2015(1), Public Access Enhancement to Willapa National Wildlife Refuge
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by: N/A..
(b) Weather conditions: N/A.
(c) Transportation facilities: N/A.
(d) Geotechnical data, design data, and environmental information consisting of the following, will be posted with the solicitation.
Wetland Credit Agreement
52.236-5 Material and Workmanship (Apr 1984)
(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.
(b) The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.
A-7
BID SCHEDULE
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.
When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:WA PACIFIC 2015(1)
Project Name:Public Access Enhancement to Willapa National Wildlife Refuge Revised by Amendment A002
A-8
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0001 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0006 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0011 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0016 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0021 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0026 15705-0100 SOIL EROSION CONTROL, SILT FENCE
200 LNFT $____________ $____________
A0031 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
6,255 LNFT $____________ $____________
A0036 15706-0200 SOIL EROSION CONTROL, CHECK DAM
32 EACH $____________ $____________
A0041 20301-1100 REMOVAL OF GATE
1 EACH $____________ $____________
A0046 20301-1900 REMOVAL OF PIPE CULVERT
2 EACH $____________ $____________
A0051 20301-2700 REMOVAL OF STRUCTURE (KIOSK)
1 EACH $____________ $____________
A0056 20301-2700 REMOVAL OF STRUCTURE (IRON RANGER)
1 EACH $____________ $____________
A0061 20301-3400 REMOVAL OF WHEELSTOP
13 EACH $____________ $____________
A0066 20302-0700 REMOVAL OF FENCE
1,655 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A-9
A0071 20303-0300 REMOVAL OF CONCRETE
90 SQYD $____________ $____________
A0076 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
1,020 SQYD $____________ $____________
A0081 20401-0000 ROADWAY EXCAVATION
2,550 CUYD $____________ $____________
A0086 20402-0000 SUBEXCAVATION
3,575 CUYD $____________ $____________
A0091 20410-0000 SELECT BORROW
3,100 CUYD $____________ $____________
A0096 20701-0500 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE E
4,600 SQYD $____________ $____________
A0101 20703-2000 GEOGRID, STABILIZATION
6,305 SQYD $____________ $____________
A0106 25120-0200 RIPRAP DITCH, METHOD A, CLASS 2
545 LNFT $____________ $____________
A0111 30202-2000 ROADWAY AGGREGATE, METHOD 2
8,020 TON $____________ $____________
A0116 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
1,239 TON $____________ $____________
A0121 41201-0000 TACK COAT
6 TON $____________ $____________
A0126 60201-0400 12-INCH PIPE CULVERT (PVC, SMOOTH WALL)
172 LNFT $____________ $____________
A0131 60915-1000 WHEELSTOP, CONCRETE
17 EACH $____________ $____________
A0136 61501-0200 SIDEWALK, COLORED CONCRETE (STAMPED)
585 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A-10
A0141 61901-0000 FENCE
1,425 LNFT $____________ $____________
A0146 61902-0000 GATE (AUTOMATED)
1 EACH $____________ $____________
A0151 61920-2000 REMOVE AND RESET GATE
2 EACH $____________ $____________
A0156 62101-0000 MONUMENT
1 EACH $____________ $____________
A0161 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
30-INCH WIDTH
30 HOUR $____________ $____________
A0166 62201-3000 HYDRAULIC EXCAVATOR
30 HOUR $____________ $____________
A0171 62301-0000 GENERAL LABOR
10 HOUR $____________ $____________
A0176 62501-0000 TURF ESTABLISHMENT
1.0 ACRE $____________ $____________
A0181 63302-0000 SIGN SYSTEM
20 SQFT $____________ $____________
A0186 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (White)
10,670 LNFT $____________ $____________
A0191 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW
2 EACH $____________ $____________
A0196 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
4 EACH $____________ $____________
A0201 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
4 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A-11
A0206 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
53 SQFT $____________ $____________
A0211 63622-0000 UTILITY TRENCH
91 LNFT $____________ $____________
A0216 64630-0000 ROADSIDE DEVELOPMENT (BARK CHIP PATH)
ALL LPSM $___LPSM_____ $____________
A002 A0220 67001-0000 PROJECT LUMP SUM (WETLAND CREDIT)
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Public Access Enhancement to Willapa National Wildlife Refuge A002 Revised by Amendment A002 iv
Special Contract Requirements Project: WA PACIFIC 2015(1), Public Access Enhancement to Willapa National Wildlife Refuge
DIVISION 600 INCIDENTAL CONSTRUCTION
Section 612. — SANITARY SEWER SYSTEMS ................................................................ F-9 Section 615. — SIDEWALKS, PADS, AND PAVED MEDIANS .................................... F-9a Section 619. — FENCES, GATES, CATTLE GUARDS AND BOLLARD
POSTS ....................................................................................................... F-10 Section 620. — STONE MASONRY .................................................................................. F-13 Section 622. — RENTAL EQUIPMENT ............................................................................ F-14 Section 623. — GENERAL LABOR .................................................................................. F-15 Section 625. — TURF ESTABLISHMENT ....................................................................... F-16 Section 633. — PERMANENT TRAFFIC CONTROL ...................................................... F-17 Section 634. — PERMANENT PAVEMENT MARKINGS .............................................. F-18 Section 635. — TEMPORARY TRAFFIC CONTROL ..................................................... F-19 Section 670. — PACIFIC COUNTY WETLAND CREDIT FEE
(ADDED SECTION) ................................................................................. F-20
DIVISION 700 MATERIAL
Section 705. — ROCK ......................................................................................................... G-1 Section 711. — CONCRETE CURING MATERIAL AND ADMIXTURES ..................... G-3 Section 713. — ROADSIDE IMPROVEMENT MATERIAL ............................................ G-4 Section 714. — GEOSYNTHETIC MATERIAL ................................................................ G-5 Section 717. — STRUCTURAL METAL ........................................................................... G-6 Section 725. — MISCELLANEOUS MATERIAL.............................................................. G-7
Revised by Amendment A002
Revised by Amendment A001
F-20 DIVISION 600
Special Contract Requirements Project: WA PACIFIC 2015(1), Public Access Enhancement to Willapa National Wildlife Refuge
(This page intentionally left blank) Section 670. — PACIFIC COUNTY WETLAND CREDIT
FEE (ADDED SECTION)
08/01/14–FP14
Description
670.01 This work consists of processing a wetland bank credit purchase for work on this project with Pacific County Public Works Department.
Construction Requirements
670.02 Upon award of the WA PACIFIC 2015(1), Public Access Enhancement to Willapa National Wildlife Refuge project, submit a payment in the amount of $22,474.32 made payable to the Department of Public Works, Pacific County WA. Payment will be sent to the Pacific County WA Public Works office, attention Karen Bannish, Senior Engineering Technician , Pacific County Department of Public Works, 211 North Commercial Street, Raymond, WA 98577, (360) 875-9368, or by e-mail at kbannish@co.pacific.wa.us. This payment is in accordance with the Wetland Credit Agreement listed under FAR Clause 52.236-4. Submit with the payment via check or money order, obtain signed documentation of receipt of payment. Submit to the CO a scanned copy of the payment with all backup and receipt of payment documentation.
Measurement
670.03 Measure the Section 670 items listed in the bid schedule according to Subsection 109.02.
Payment
670.04 The accepted quantities will be paid at the contract price per unit of measurement for the Section 670 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Revised by Amendment A002
Sheet and Description
Section C Section D Section E Section G Section I Section J
Typical Sections Plan & Profile Parking Areas Erosion
Control
Temporary Traffic Control
Permanent Traffic Control
Allowance Bid Schedule
A0001 15101-0000 MOBILIZATION LPSM ALL
A0006 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0011 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0016 15401-0000 CONTRACTOR TESTING LPSM ALL
A0021 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0026 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 200 200
A0031 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 6,255 6,255
A0036 15706-0200 SOIL EROSION CONTROL, CHECK DAM EACH 2 32
A0041 20301-1100 REMOVAL OF GATE EACH 1 1
A0046 20301-1900 REMOVAL OF PIPE CULVERT EACH 2 2
A0051 20301-2700 REMOVAL OF STRUCTURE (KIOSK) EACH 1 1
A0056 20301-2700 REMOVAL OF STRUCTURE (IRON RANGER) EACH 1 1
A0061 20301-3400 REMOVAL OF WHEELSTOP EACH 13 13
A0066 20302-0700 REMOVAL OF FENCE LNFT 1,620 35 1,655
A0071 20303-0300 REMOVAL OF CONCRETE SQYD 90 90
A0076 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 970 50 1,020
A0081 20401-0000 ROADWAY EXCAVATION CUYD 2,312 238 2,550
A0086 20402-0000 SUBEXCAVATION CUYD 3,275 300 3,575
A0091 20410-0000 SELECT BORROW CUYD 2,870 230 3,100
A0096 20701-0500 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE E SQYD 4,400 200 4,600
A0101 20703-2000 GEOGRID, STABILIZATION SQYD 6,005 300 6,305
A0106 25120-0200 RIPRAP DITCH, METHOD A, CLASS 2 LNFT 535 10 545
A0111 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 7,622 398 8,020
A0116 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1,179 60 1,239
A0121 41201-0000 TACK COAT TON 6 6
A0126 60201-0400 12-INCH PIPE CULVERT (PVC, SMOOTH WALL) LNFT 162 10 172
A0131 60915-1000 WHEELSTOP, CONCRETE EACH 17 17
A0136 61501-0200 SIDEWALK, COLORED CONCRETE (STAMPED) SQYD 565 20 585
A0141 61901-0000 FENCE LNFT 1,400 25 1,425
A0146 61902-0000 GATE (AUTOMATED) EACH 1 1
A0151 61920-2000 REMOVE AND RESET GATE EACH 2 2
A0156 62101-0000 MONUMENT EACH 1 1
A0161 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 30-INCH
WIDTH HOUR 30 30
A0166 62201-3000 HYDRAULIC EXCAVATOR HOUR 30 30
A0171 62301-0000 GENERAL LABOR HOUR 10 10
A0176 62501-0000 TURF ESTABLISHMENT ACRE 1.0 1.0
A0181 63302-0000 SIGN SYSTEM SQFT 20 20
A0186 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (White) LNFT 10,670 10,670
A0191 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 2 2
A002 Revised by Amendment A002Report Date: 05/12/20
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-M ay
-2
1:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
C
U se rs \K im be r.
M ill er
\D es kt op
\E xp or ts f ro m P
W w a-a2
_s um m ar y.
xl sm ]S he et
STATE PROJECT
B.1PACIFIC 2015(1)WA
SHEET
NUMBER
Sheet and Description
Section C Section D Section E Section G Section I Section J
Typical Sections Plan & Profile Parking Areas Erosion
Control
Temporary Traffic Control
Permanent Traffic Control
Allowance Bid Schedule
A0196 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL EACH 4 4
A0201 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
A0206 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 43 10 53
A0211 63622-0000 UTILITY TRENCH LNFT 81 10 91
A0216 64630-0000 ROADSIDE DEVELOPMENT (BARK CHIP PATH) LPSM All ALL
A002 A0220 67001-0000 PROJECT LUMP SUM (WETLAND CREDIT) LPSM ALL
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
C
U se rs \K im be r.
M ill er
\D es kt op
\E xp or ts f ro m P
W w a-a2
_s um m ar y.
xl sm ]S he et
2)
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-M ay -2
1:
P M
A002 Revised by Amendment A002 Report Date: 05/12/20
STATE PROJECT
B.2PACIFIC 2015(1)WA
SHEET
NUMBER
MICHAEL S
TRAFFALIS
Digitally signed by MICHAEL S
TRAFFALIS
Date: 2020.05.13 09:55:44 -07'00'
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A002 |
| Pages A-7 through A-11.pdf |
| Untitled |