This amendment modifies a solicitation for a construction project to enhance public access at the Willapa National Wildlife Refuge. The revisions include adding requirements for installing government-furnished cleanout valve covers to match finish grade, stamping colored sidewalks with a stone pattern, and setting survey monuments according to state standards. Plan sheets are also updated to include new monument case cover details and notes identifying government-furnished valve locations. The solicitation remains open with responses due by the original deadline. The Department of Transportation Federal Highway Administration and Pacific County, Washington are involved in the project.

View the file

Other files

File Type Posted
BidSum.pdf PDF
QA_05-29-2020.pdf PDF
Amendment A004.pdf PDF
QA_05-27-2020.pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
Roadway Cross Sections Riekkola.pdf PDF
Earthwork Volume Report_Mainline.pdf PDF
IFB_Willapa.pdf PDF
Geotech Report_PBS.pdf PDF
Horizontal Alignment Mainline.pdf PDF
Profile Grades Mainline.pdf PDF
Horizontal Alignment Riekkola.pdf PDF
Culvert Cross Section.pdf PDF
Riekkola Parking lot Geotech Report.pdf PDF
Roadway Cross Sections Mainline.pdf PDF
SWPPP WA Pacific 2015(1) Scan.pdf PDF
Profile Grades Riekkola.pdf PDF
wa-a2015024_plans.pdf PDF
Earthwork Volume Report_Riekkola.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 04/30/2020 N/A See Block 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056720B000009

9B. DATED (SEE ITEM 11)

04/24/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA PACIFIC 2015(1), Public Access Enhancement to Willapa National Wildlife Refuge

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 04-30-2020 WA PACIFIC 2015(1) Solicitation No. 69056720B000009 Public Access Enhancement to Willapa National Wildlife Refuge

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Pages iii through iv, SCR Table of Contents. Revises SCR Table of Contents to add Section 612.

Page F-9, Section 612, Sanitary Sewer Systems. Adds requirements.

Page F-9a through F-9b, Section 615, Sideways, Pads, and Paved Medians. Adds pages to move requirements these requirements to Page F-9a; and adds blank Page F-9b to keep the number of SCR pages an even number of pages.

PLANS

Plan Sheet D.9 Sheet revisions as follows.

Deletes original Plan View Monument Case Cover Detail

Adds new Plan View Monument Case Cover Detail.

Deletes original Note 1, and adds new Note 1.

Plan Sheet E.7 Sheet revisions as follows.

Adds Government Furnished Valve Locations Table.

Deletes original Note 1, and adds new Notes 1 and 2.

ENCLOSURES

Pages:

iii through iv F-9 through F-9b

Plan Sheets:

D.9 E.7 iii

Special Contract Requirements Project: WA PACIFIC 2015(1), Public Access Enhancement to Willapa National Wildlife Refuge

SCR TABLE OF CONTENTS

SPECIAL CONTRACT REQUIREMENTS (SCR)

The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), U.S. Department of Transportation, Federal Highway Administration.

DIVISION 100 GENERAL REQUIREMENTS

Section 101. — TERMS, FORMAT, AND DEFINITIONS ................................................. E-1 Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT .............................. E-2 Section 103. — SCOPE OF WORK ...................................................................................... E-3 Section 104. — CONTROL OF WORK ............................................................................... E-5 Section 105. — CONTROL OF MATERIAL ....................................................................... E-6 Section 106. — ACCEPTANCE OF WORK ........................................................................ E-9 Section 107. — LEGAL RELATIONS AND

RESPONSIBILITY TO THE PUBLIC ..................................................... E-11 Section 108. — PROSECUTION AND PROGRESS ......................................................... E-15 Section 109. — MEASUREMENT AND PAYMENT ....................................................... E-17

DIVISION 150 PROJECT REQUIREMENTS

Section 152. — CONSTRUCTION SURVEY AND STAKING ....................................... E-23 Section 153. — CONTRACTOR QUALITY CONTROL .................................................. E-27 Section 154. — CONTRACTOR SAMPLING AND TESTING ........................................ E-32 Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS ........................... E-33 Section 156. — PUBLIC TRAFFIC .................................................................................... E-37 Section 157. — SOIL EROSION AND SEDIMENT CONTROL...................................... E-38

DIVISION 200 EARTHWORK

Section 201. — CLEARING AND GRUBBING .................................................................. F-1 Section 204. — EXCAVATION AND EMBANKMENT .................................................... F-2 Section 207. — EARTHWORK GEOSYNTHETICS .......................................................... F-4

DIVISION 400 ASPHALT PAVEMENTS AND SURFACE TREATMENTS

Section 403. — ASPHALT CONCRETE ............................................................................. F-5

DIVISION 550 BRIDGE CONSTRUCTION

Section 552. — STRUCTURAL CONCRETE ..................................................................... F-7 Section 554. — REINFORCING STEEL .............................................................................. F-8

Revised by Amendment A001 iv

Project: WA PACIFIC 2015(1), Public Access Enhancement to Willapa National Wildlife Refuge

DIVISION 600 INCIDENTAL CONSTRUCTION

Section 612. — SANITARY SEWER SYSTEMS ................................................................ F-9 Section 615. — SIDEWALKS, PADS, AND PAVED MEDIANS .................................... F-9a Section 619. — FENCES, GATES, CATTLE GUARDS AND BOLLARD

POSTS ....................................................................................................... F-10 Section 620. — STONE MASONRY .................................................................................. F-13 Section 622. — RENTAL EQUIPMENT ............................................................................ F-14 Section 623. — GENERAL LABOR .................................................................................. F-15 Section 625. — TURF ESTABLISHMENT ....................................................................... F-16 Section 633. — PERMANENT TRAFFIC CONTROL ...................................................... F-17 Section 634. — PERMANENT PAVEMENT MARKINGS .............................................. F-18 Section 635. — TEMPORARY TRAFFIC CONTROL ..................................................... F-19

DIVISION 700 MATERIAL

Section 705. — ROCK ......................................................................................................... G-1 Section 711. — CONCRETE CURING MATERIAL AND ADMIXTURES ..................... G-3 Section 713. — ROADSIDE IMPROVEMENT MATERIAL ............................................ G-4 Section 714. — GEOSYNTHETIC MATERIAL ................................................................ G-5 Section 717. — STRUCTURAL METAL ........................................................................... G-6 Section 725. — MISCELLANEOUS MATERIAL.............................................................. G-7

F-9

Project: WA PACIFIC 2015(1), Public Access Enhancement to Willapa National Wildlife Refuge

DIVISION 600

INCIDENTAL CONSTRUCTION

Section 612. — SANITARY SEWER SYSTEMS

Description

612.01 Add the following:

This work also consists of installing government-furnished cleanout valve covers to match finish grade.

Construction Requirements

612.03 General. Add the following:

Obtain government-furnished cleanout valve covers from the CO at the work site.

Cut existing plastic sleeves as needed, and install four government-furnished cleanout valve covers with the tops matching finish grade elevations.

F-9a DIVISION 600

Project: WA PACIFIC 2015(1), Public Access Enhancement to Willapa National Wildlife Refuge

Section 615. — SIDEWALKS, PADS, AND PAVED

MEDIANS

Construction Requirements

615.04 Concrete Sidewalks, Pads, and Medians Add the following:

Stamp colored sidewalks with stone pattern matching masonry veneer approved for gate under Section 620. Trim perimeter of sidewalk with 6-inch curb. Construct according to Section 601 and finish according to Section 552. Tie down anchors for restroom and bathroom according to Section 555.

F-9b DIVISION 600

Project: WA PACIFIC 2015(1), Public Access Enhancement to Willapa National Wildlife Refuge

(This page intentionally left blank)

SECTION A-A

1"

8"

Concrete pavement

Top flush with

SECTION B-B

ST

A.

12+0.779

PL

S 123564

POT

ST

A.

12+077.9

PL

S 123456

POT

A A

B B

P

C O T

M O

N

D

NOTE:

NO SCALE

12'" long

#8 reinforcing steel, " in concrete.4 cap 2 with rounded top. Embed brass

" to 3" dia. brass cap2

1"

C h e c k e d b y

D e s ig n e d b y

D.9

NUMBER

SHEET

PACIFIC 2015(1)

PROJECTSTATE

WA

MONUMENT DETAILS

w a -a d b

.d g n

[M O

N U

M E

N T

D E

T A

IL

S

/2

/2

1 Revised by Amendment A001

1 8 description into cap

Stamp sta. and alignment

MONUMENT CASE COVER

PLAN VIEW

DETAIL

MONUMENT AND MONUMENT CASE

MONUMENT CAP

PLAN VIEW

Pacific County, WA monument survey standards.

according to the requirements of the State of Washington and

Set and record monuments using a professional land surveyor 1.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A001

File details come from the government source that posted it. Updated .