About this file

Amendment 0001

View the file

Other files

File Type Posted
bid abstract with alts 09-B-0014.pdf PDF
W91ZRS-09-B-0014-0003.doc DOC document
RFI2.docx DOCX document
RFI.docx DOCX document
20081566A10_PROJECT 14_2009-09-03 11.pdf PDF
20081566A10_PROJECT 14_2009-09-03 5.pdf PDF
20081566A10_PROJECT 14_2009-09-03 2.pdf PDF
20081566A10_PROJECT 14_2009-09-03 3.pdf PDF
W91ZRS-09-B-0014-0002.doc DOC document
20081566A10_PROJECT 14_2009-09-03 9.pdf PDF
E14-01 Add 1.pdf PDF
Cover Sheet.pdf PDF
Infra - Project 14 Rt 75 Util.pdf PDF
Comm-Electric 14 VOL 1.pdf PDF
ANBM-02-E14-01.pdf PDF
ANBM-02-E14-02.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The performance code Notice has been added.

The performance period code Mandatory has been added.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

AMENDMENT

To: All Plan Holders

New England Disaster Training Center

The Departments of the Army and the Air Force, National Guard Bureau

Camp Hartell Infrastructure – Comm/Electric Project # 14

East Granby & Windsor Locks, Connecticut

EYP Project Number: 2008905.02

ADDENDUM NUMBER 1 – August 26, 2009

This Addendum forms a part of the Contract Documents and modifies the original Project

Manual dated July 29, 2009 and the Drawings dated July 29, 2009 and August 8, 2009.

PROJECT MANUAL

Section 16271 - PADMOUNTED TRANSFORMERS:

Replace subparagraph 2.2-A1 as follows:

1. Rating:

a. kVA: As indicated on Drawings.

b. Primary Voltage: 23kV for Site Electric Service Transformer, 13.2kV for Building Electric

Service Transformers.

c. Secondary Voltage: 13.2kV for Site Electric Service Transformer, 208/120V for Building

Electric Service Transformers.

Replace subparagraph 2.2-B1 as follows:

1. Primary Connection:

a. Site Electric Service Transformer: 200A externally clamped 35kV universal bushing wells mounted within the transformer tank and bushing inserts, per Utility requirements.

b. Building Electric Service Transformers: Loop feed, 6-200A 15kV universal bushing wells mounted within the transformer tank and bushing inserts.

c. Parking Stands: one for each cable.

Replace subparagraph 2.2-C as follows:

C. Building Electric Service Transformers: 600V tin-plated copper, spade type with pre-drilled holes for termination of minimum two (2) 500kcmil conductors per phase.

New England Disaster Training Center Job No. 2008905.02

ADDENDUM NO. 1 - Vehicle Storage Building, Camp Hartell ADD1 - 2

DRAWINGS

1. Drawings C14-11, C14-12, C14-13 and C14-14 Add note 1. “ 1. All electrical and tel/com vaults shown on site plans shall be 5’ x 10’ vaults as detailed on drawing C14-36 “

2. Drawings C14-11, C14-12, C14-13 and C14-14 Add note 2. “ 2. All electric and tel/com handholes shown on site plans shall be 60” high x 56” high vaults as detailed on drawing

C14-34. “

3. Drawing E14-01, Replace with attached revised drawing dated August 26, 2009.

(End of Summary of Changes)