RFI2.docx
DOCX document 17 KB Posted
- Solicitation number
- W91ZRS-09-B-0014
About this file
RFIs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| bid abstract with alts 09-B-0014.pdf | ||
| W91ZRS-09-B-0014-0003.doc | DOC document | |
| RFI.docx | DOCX document | |
| 20081566A10_PROJECT 14_2009-09-03 11.pdf | ||
| 20081566A10_PROJECT 14_2009-09-03 5.pdf | ||
| 20081566A10_PROJECT 14_2009-09-03 2.pdf | ||
| 20081566A10_PROJECT 14_2009-09-03 3.pdf | ||
| W91ZRS-09-B-0014-0002.doc | DOC document | |
| 20081566A10_PROJECT 14_2009-09-03 9.pdf | ||
| W91ZRS-09-B-0014-0001.doc | DOC document | |
| E14-01 Add 1.pdf | ||
| Cover Sheet.pdf | ||
| Infra - Project 14 Rt 75 Util.pdf | ||
| Comm-Electric 14 VOL 1.pdf | ||
| ANBM-02-E14-01.pdf | ||
| ANBM-02-E14-02.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q. Please include a note that all Manholes, Transformers and the High Voltage Switch are required to be grounded per Connecticut Light and Power Standards.
A. All work shall be done per CL&P standards.
Q. Are the new Manholes required to be fitted with suitable cable arm racks and insulated cable supports?
A. Provide manholes and accessories per CLP standards.
Q. Please clarify that all exposed cables where passing through a Manhole must be fireproofed.
A. Per CL&P standards.
Q. Please explain why there are two Transformer Pads indicated at the Multipurpose Building. It appears that there are conduits coming from the Manhole to both Transformer locations.
A. Yes
Q. Please verify the number of conduits from the Manholes to each of the new Transformer locations.
A. Two 5 inch as indicated.
Q. Please confirm that this project does not require any wiring on the secondary side of the new transformers.
A. No, building P110 requires it.
Q. Please advise if pull ropes and conduit plugs are to be installed in spare conduits.
A. Yes
Q. Where is the Exterior Lighting to be installed on this project? Specifications are included for this work but no luminaires are shown on the drawings.
A. No lights per addendum #1
Q. . The conduit notes call for encasing in 3000 PSI concrete, however, there is still a note on the right side calling for sand cushion. In our experience, sand cushion bedding usually refers to direct burial conduit. Please clarify if there is an additional requirement for sand cushion in addition to the concrete encasement?
A. Yes the sand detail is for direct bury only if not called for concrete