About this file

Electrical Drawing

View the file

Other files

File Type Posted
bid abstract with alts 09-B-0014.pdf PDF
W91ZRS-09-B-0014-0003.doc DOC document
RFI2.docx DOCX document
RFI.docx DOCX document
20081566A10_PROJECT 14_2009-09-03 11.pdf PDF
20081566A10_PROJECT 14_2009-09-03 5.pdf PDF
20081566A10_PROJECT 14_2009-09-03 2.pdf PDF
20081566A10_PROJECT 14_2009-09-03 3.pdf PDF
W91ZRS-09-B-0014-0002.doc DOC document
20081566A10_PROJECT 14_2009-09-03 9.pdf PDF
W91ZRS-09-B-0014-0001.doc DOC document
E14-01 Add 1.pdf PDF
Cover Sheet.pdf PDF
Infra - Project 14 Rt 75 Util.pdf PDF
Comm-Electric 14 VOL 1.pdf PDF
ANBM-02-E14-01.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UGP

(2) 5"C. UNDERGROUND WITH

23kW CONDUCTORS

FROM CL&P PRIMARY

METERED POLE

NEW CL&P PRIMARY

METERED RISER POLE

23 kV - 13.2 kV

3000 KVA

PAD MOUNT TRANSFORMER

WITH VAULT PAD PER

CL&P REQUIREMENTS

NEW 15 KV

METAL ENCLOSED SWITCHGEAR SERVING

CAMP HARTELL

PRIMARY ELECTRIC SERVICE

UGP

UGP

NEW POWER AND

TELECOMMUNICATIONS

HANDHOLES

EXISTING

BUILDING

P-123

UGP

NEW (2) 5"C. UNDERGROUND WITH #4/0

15kV, #4 600V

PRIMARY DISTRIBUTION

OPENING AT

PROVIDE (2) TELECOMMUNICATIONS

CONDUITS TO EXISTING P-123

ENTRANCE FACILITY

ELECTRICAL

SITE PLAN

1"=20'-0"

JWH

PSH

E14-02

GENERAL NOTES

REFER TO SITE/CIVIL DRAWINGS FOR ROUTING OF UTILITIES AND CONSTRUCTION

DETAILS.

A.

COORDINATE NEW PRIMARY ELECTRIC SERVICE REQUIREMENTS WITH CONNECTICUT

LIGHT AND POWER.

B.

2008905.02

08.05.2009

NEW ENGLAND DISASTER

TRAINING CENTER

Camp Hartell Infrastructure Project - Comm. / Electric East Granby & Windsor Locks, Connecticut

REVISION/SUBMISSIONNO. DATE

DATE:

SCALE:

EYP PROJECT NO.

DESIGNED BY:

DRAWN BY:

CHECKED BY:

E14-02