Infra - Project 14 Rt 75 Util.pdf
PDF 4 MB Posted
- Solicitation number
- W91ZRS-09-B-0014
About this file
Utility Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| bid abstract with alts 09-B-0014.pdf | ||
| W91ZRS-09-B-0014-0003.doc | DOC document | |
| RFI2.docx | DOCX document | |
| RFI.docx | DOCX document | |
| 20081566A10_PROJECT 14_2009-09-03 11.pdf | ||
| 20081566A10_PROJECT 14_2009-09-03 5.pdf | ||
| 20081566A10_PROJECT 14_2009-09-03 2.pdf | ||
| 20081566A10_PROJECT 14_2009-09-03 3.pdf | ||
| W91ZRS-09-B-0014-0002.doc | DOC document | |
| 20081566A10_PROJECT 14_2009-09-03 9.pdf | ||
| W91ZRS-09-B-0014-0001.doc | DOC document | |
| E14-01 Add 1.pdf | ||
| Cover Sheet.pdf | ||
| Comm-Electric 14 VOL 1.pdf | ||
| ANBM-02-E14-01.pdf | ||
| ANBM-02-E14-02.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FUSS & O'NEILL
Disciplines to Deliver
Fi le
P at h:
C
:\T E
M P
\2
6A
_S
TP
_0 1_
1_ 1_
.d w g, L ay ou t:
C
-0
R oa dw ay O ve ra ll T ue , A ug
4,
- 3 :3
P
M
U se r:
sl ea m y
INFRASTRUCTURE
IMPROVEMENTS
SITE LOCATION
1"=100'
DFD
SAL
EMB
C14-00
2008905.02
07.29.2009
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Infrastructure Project - Communication / Electric Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
INFRASTRUCTURE
IMPROVEMENTS
PLAN AND PROFILE
1"=40'
DFD
SAL
EMB
C14-11
2008905.02
07.29.2009
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Infrastructure Project - Communication / Electric Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PLAN AND PROFILE
1"=40'
DFD
SAL
EMB
C14-12
2008905.02
07.29.2009
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Infrastructure Project - Communication / Electric Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PLAN AND PROFILE
1"=40'
DFD
SAL
EMB
C14-13
2008905.02
07.29.2009
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Infrastructure Project - Communication / Electric Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PLAN AND PROFILE
1"=40'
DFD
SAL
EMB
C14-14
2008905.02
07.29.2009
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Infrastructure Project - Communication / Electric Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJECT
GENERAL NOTES
NTS
DFD
HDS
EMB
C14-30
2008905.02
07.29.2009
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Infrastructure Project - Communication/Electric Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
FUSS & O'NEILL
Disciplines to Deliver
Fi le
P at h:
J
:\D W
G \P
\1
6\ A1
0\ C iv il\
Pl an
\2
6A
_D
ET
_0 1-
PR
O
J
IN
FR
A
EL
EC
C
O M
.d w g, L ay ou t:
C
-3
F ri, J ul
1,
- 1 :1
P
M
U se r:
H
S ul liv an
1. CONSTRUCTION STANDARDS
2. PLAN IMPLEMENTATION
3. INSTALLATION SCHEDULE
4. FUGITIVE DUST
5. HAY BALE LIFE SPAN
6. CATCH BASINS
7. STOCKPILES
8. TOE OF SLOPE
9. SEDIMENT REMOVAL
10. SOIL STABILIZATION SCHEDULE
11. TEMPORARY SEEDING
12. PERMANENT SEEDING
13. INSPECTION
INFRASTRUCTURE
PROJECT
CONSTRUCTION DETAILS
NTS
DFD
HDS
EMB
C14-31
2008905.02
07.29.2009
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Infrastructure Project - Communication/Electric Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CONSTRUCTION DETAILS
NTS
DFD
HDS
EMB
C14-32
2008905.02
07.29.2009
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Infrastructure Project - Communication/Electric Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CONSTRUCTION DETAILS
NTS
DFD
HDS
EMB
C14-33
2008905.02
07.29.2009
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Infrastructure Project - Communication/Electric Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CONSTRUCTION DETAILS
NTS
DFD
HDS
EMB
C14-34
2008905.02
07.29.2009
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Infrastructure Project - Communication/Electric Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CONSTRUCTION DETAILS
NTS
DFD
HDS
EMB
C14-35
2008905.02
07.29.2009
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Infrastructure Project - Communication/Electric Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
CONSTRUCTION DETAILS
NTS
DFD
HDS
EMB
C14-36
2008905.02
07.29.2009
CONSULTANTS:
NEW ENGLAND DISASTER
TRAINING CENTER
Camp Hartell Infrastructure Project - Communication/Electric Windsor Locks, Connecticut
REVISION/SUBMISSIONNO.
KEY PLAN:
DATE
DATE:
SCALE:
EYP PROJECT NO.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
| 20081566A10_STP_01-C14-00 Roadway Overall |
| 20081566A10_STP_01-C14-11 Utility Plan & Profile |
| 20081566A10_STP_01-C14-12 Utility Plan & Profile |
| 20081566A10_STP_01-C14-13 Utility Plan & Profile |
| 20081566A10_STP_01-C14-14 Utility Plan & Profile |
| 20081566A10_DET_01-PROJ 14 INFRA ELEC COM-C14-30 |
| 20081566A10_DET_01-PROJ 14 INFRA ELEC COM-C14-31 |
| 20081566A10_DET_01-PROJ 14 INFRA ELEC COM-C14-32 |
| 20081566A10_DET_01-PROJ 14 INFRA ELEC COM-C14-33 |
| 20081566A10_DET_01-PROJ 14 INFRA ELEC COM-C14-34 |
| 20081566A10_DET_01-PROJ 14 INFRA ELEC COM-C14-35 |
| 20081566A10_DET_01-PROJ 14 INFRA ELEC COM-C14-36 |
File details come from the government source that posted it. Updated .