This is a Questions and Answers document for solicitation W91ZLK-25-Q-EMI2 regarding an HVAC replacement project for EMI Chamber B at Aberdeen Proving Ground. The Q&A addresses technical specifications, revealing the HVAC unit must provide 4,000-8,000 CFM of conditioned air, maintain 70 degrees and 50% humidity in the conditioned space, and is assumed to be a 40-ton unit. The existing unit's original submittal and as-built mechanical drawings are not available.

Key clarifications include: on-site programming is required with no VPN access allowed, MegaPress pipe fittings are acceptable for propane piping, temporary heating/cooling during installation is not required, and the government will remove and retain ownership of the existing fuel tank. The new BAS Controls touchscreen HMI can be installed on the existing panel door, which has 5.5 inches of clearance. Alternative duct protection methods and phenolic duct systems in place of sheet metal ductwork were not approved. No additional site visits or bid date extensions will be granted.

View the file

Other files

File Type Posted
Questions Answers - updated 02272025.xlsx XLSX spreadsheet
Questions received and responses.docx DOCX document
Questions and Answers - RFI for EMI - HVAC Replacement B456.xlsx XLSX spreadsheet
Questions received and responses.docx DOCX document
ACC SOW ChB HVAC revised 2-25-25.docx DOCX document
APG Chamber B HVAC pictures.docx DOCX document
ACC SOW ChB HVAC revised.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions

EMI - HVAC Replacement B456
project: W91ZLK-25-Q-EMI2
Tagpre-bid question(s)comments
ADoes the GOV have the original submittal for the unit being replaced? We would like to know the exact design CFM and static pressure [and / or range for both] that the replacement unit is expected to achieve.No, the original submital with static pressure data is not obtainable. The original requirement was for the HVAC unit to provide between 4~8000cfm of conditioned air.
BDoes the GOV have a copy of the as-built mechanical drawings for this chamber? If yes, can it be shared prior to bid date?No, the original drawings are not obtainable.
CIs there a GOV preferred or go to Schneider Electric BAS integrator at this facility that is already familiar with the existing controls for this project?None.
DFor the purpose of programming and commissioning the BAS Controls on this project, will a contractor deployed, temporary remote [VPN] connection be allowed to provide access to an offsite programmer or will this all have to be accomplished at site?No VPN. Programming to be performed on site.
EGiven that the facility is near an operational airport, will the Contractor be required to file an FAA Obstruction Evaluation for crane operations?No
FIn lieu of the FlexClad detail noted in section 4.2.3, can other type of exterior duct protection methods be used such as assembled Tuffduct systems? Will phenolic duct systems be acceptable in lieu of sheet metal ductwork?No
GIf known, what is the R value of the exterior duct's insulation?Unknown
HThe temperature/humidity requirements of 70 deg and 50%- is that space temperature or supply air conditions?Conditioned space
IThere isn't enough information to perform load calculations for the space- is the proposer to assume nominal 40-ton unit is appropriate for the space load?Yes
JIs it possible to have an additional site visit with a controls subcontractor?No
KIs it possible to extend the bid date?No
LWill the GOV recover the fuel left in the existing fuel tank prior to demo? Will this existing fuel tank need to be removed from the facility or will the GOV keep the tank after it's been removed from the pad?Oil will be removed. The Gov will maintain ownership of the tank.
MOnce the existing heating and cooling equipment is removed, the chamber will be left without heating or cooling. Depending on ambient conditions, is there a requirement for temporary cooling or heating the chamber during the project duration?No, depending on ambient conditions the chamber may be off line.
NWill the GOV accept MegaPress pipe fittings for the new propane piping to and from the new HVAC unit and the propane tank?Yes
OCan the GOV confirm the new BAS Controls' touchscreen HMI can be installed on the existing BAS panel door, if space allows? This new item would be installed to replace the existing TAC HMI.Ok to install new interface on existing panel door. There is 5.5 inches of clearance between the inside face of the panel door and the surface of the existing control board.