Appendix F Example of Repair Cost Estimate.pdf

PDF 124 KB Posted

Attached to
Mobile Crane Maintenance and Repairs for Army Test Center
Solicitation number
W91ZLK-22-R-0011
Issued by

About this file

This combined synopsis/solicitation seeks proposals for mobile crane maintenance and repair services for the Army Test Center located at Aberdeen Proving Ground, Maryland. The contractor shall provide all labor, supervision, tools, equipment, materials, supplies and transportation required to perform scheduled and unscheduled maintenance, repair, and inspection services. The period of performance is one base year with two one-year options. Proposals are due by March 18, 2022 and shall include separate technical and price volumes. The contract will be awarded to the lowest priced technically acceptable offeror evaluated based on experience, qualifications, and understanding of requirements. The solicitation is set aside for small businesses under NAICS code 811310.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY ABERDEEN TEST CENTER

REPAIR COST ESTIMATE HEAVY

Work Order Number Estimate Date Shop

Check if: Supplement Adjustment Original Estimate Amount

1. Equipment Information ATC ID Number Nomenclature

2. Equipment Condition/ Faults/ Failures

3. Labor Estimate Labor Hours Labor Rate Total Labor Cost

4. Parts / Material Estimate (use continuation sheet if needed) Item Description Quantity Unit Price Total Material Cost

Total Material Cost

5. Total Estimate

Prepared by: Signature

6. Government QA recommendation: I pre-approved this work: Yes No Repair Do Not Repair Explanation:

Verified By: Signature

7. Equipment Management Replacement Value MEL Percentage Factor Current MEL

a. Is the Repair Cost greater than the MEL? YES NO

b. Equipment Manager Recommendation: Repair Defer Turn-in Other Explain: ______________________________________________________________________ Equipment Manager Signature

8. COR Recommendation: Approve Disapprove

COR Signature

Hours Make Miles Model danny.s.bennett Typewritten Text danny.s.bennett Typewritten Text danny.s.bennett Typewritten Text danny.s.bennett Typewritten Text Work Order Date

Work Order Number: 1500555
1 Equipment Information: 7179
Nomenclature: Crane, 250 Ton
Hours: 7952
Make: Grove
Miles:
Model: 6250
Labor HoursRow1: 16
Labor RateRow1: 110
Total Labor CostRow1: 1760
Total Material CostRow1: 12000
Total Material CostRow2: 0
Unit PriceRow3:
Total Material CostRow3: 0
Total Material CostTotal Material Cost: 12000
Replacement ValueRow1:
MEL Percentage FactorRow1: 0
Current MELRow1: 0
Equipment Manager:
COR: LAVONYA HARMON
Explanation:
Check Box1y: Off
Check Box1n: Off
Check Box2y: Off
Check Box3n: Off
Check Box5y: Off
Check Box5n: Off
Check Box6y: Off
Check Box6n: Off
Check Box7y: Off
Check Box7n: Off
Check Box7ti: Off
Check Box8y: Off
Check Box8n: Off
Item DescriptionRow1: Tires
Item DescriptionRow2:
Item DescriptionRow3:
QuantityRow1: 8
QuantityRow2:
QuantityRow3:
Unit PriceRow1: 1500.00
Unit PriceRow2:
Submited by Beta:
Total Estimate: 13760
OG Estimate: 0
Da preppa: name here then sign
Ch-Ch-CH-CHeck It out: Off
WoOrDa: 05/06/2015
Date Notified: 05/11/2015
Shop: B3011
Text9: 8 Tires are unserviceable, replace 8 Tires
Text10:
Text9A:
Text10A:
Text10B:
Explaination ABC:

File details come from the government source that posted it. Updated .